Grenfell Tower Inquiry - Department for Levelling Up, Housing and Communities Evidence -Tuesday 1st March 2022 (1/3)
00:00:29 good morning everyone welcome to today's hearing
00:00:32 hearing today we're going to continue hearing evidence from mr anthony bird so i'm going to ask mr bird to come back
00:00:48 good morning mr bird good morning sir ready to carry on yes thank you very much yes mrs good morning mr chairman good morning panel members good morning mr bird good morning uh you may recall that yesterday afternoon when we
00:00:59 that yesterday afternoon when we finished we were examining together the subject of bs 476 part six and seven and its potential withdrawal uh from either from the british standard or from adb
00:01:10 or from adb uh and particularly diagram 40. now i'd like to look next with you at a document on the same theme clg one triple zero four two two nine please
00:01:23 this is an email which starts at the bottom of page one on your screen and goes over to page two it's an email from somebody called chun jin cho
00:01:34 jin cho on the 7th of december 2009 to you and the subject is bs 476 and en 13501 and he says i am mr chair
00:01:45 and he says i am mr chair from the fire safety and shelter department singapore can i seek your assistance to clarify the equivalent standards of en 13501 and bs476 if you are not the officer concerned to
00:01:56 if you are not the officer concerned to answer my queries i would appreciate very much if you could direct the questions to the relevant officer and then if you turn the page please to page two he says this currently singapore is adopting bs 476
00:02:08 currently singapore is adopting bs 476 parts 11
00:02:10 parts 11 4 stroke 11 and part 6 stroke 7 to check the non-combustibility and flame spread properties of material respectively there were many inquiries from suppliers on the use of en standards instead of bs
00:02:23 on the use of en standards instead of bs for the relevant test we've checked the relevant information from the website and found that there were many write up mentioning the equivalency of en and bs standard as follow
00:02:35 follow and then he sets out two columns as you can see uk class and euro class and you can see how they relate to each other yes yes uh naught and against b or better under the
00:02:47 and against b or better under the euroclass column and then a paragraph three he says while we go through document b there is mentioned of euro class a1 and a2 considered as non-combustible and
00:02:59 a2 considered as non-combustible and limited combust stability respectively but there is no mentioned in document b that euro class b is equivalent to class naught bs 476 part six and seven and
00:03:12 naught bs 476 part six and seven and euro class c is equivalent to class one and two i mean i seek your good self to clarify whether it is a regulation or mentioned in document b that the following are
00:03:23 in document b that the following are equivalent uk class
00:03:26 uk class and euro class two columns again naught
00:03:30 naught as against b or better one and two as against c or better etc you see that yes and he asks for your assistance now if we scroll up to the next email in
00:03:42 now if we scroll up to the next email in the chain on page one we can see that a few hours later at 8 05 a.m you uh forward the email from mr chota dr debbie smith and brian martin
00:03:53 debbie smith and brian martin you see that um
00:03:56 um yes and you say it's halfway through your halfway down your screen and you say
00:04:00 say can you kindly assist please tar and yes why did you forward mr cho's email to them
00:04:07 them because by this time brian martin was the principal construction expert working for me and leading on the proof document b um because i this is december 2009 so
00:04:20 um because i this is december 2009 so brian had now formed uh had now joined the department and what about the bre why did you send this message to the bre because because we continued to work very closely uh with dr smith on such matters
00:04:34 closely uh with dr smith on such matters um at a european level and so i i felt it was most appropriate to share it with brian as the policy lead and dr smith what was the bre's role in helping you
00:04:47 what was the bre's role in helping you answer a question posed to government again
00:04:52 again from from
00:04:54 from from you know as we've seen through some of the evidence you've you've shown me across across the course of my my last few days debbie was utilized for her her excellent expertise in
00:05:08 for her her excellent expertise in european
00:05:09 european testing
00:05:11 testing um both in terms of helping to develop approved documents in the 2002 approved document b but also from recollection this time bre would have been providing us with
00:05:24 bre would have been providing us with feedback and insight to some of the discussions at european level
00:05:29 level uh within bsi and sen and so we probably had some recollection contracts there with debbie as well you say contracts with debbie yes
00:05:38 yes was the relationship between the the department and the bre governed entirely by arms length contractual relationships or was there some element of informality
00:05:49 of informality there could potentially be aspects of informality but from recollection debbie and her team would have been under under contract to support us on standardization at a
00:06:00 support us on standardization at a european level from and looking at the timing i would have thought that was in place at this time as well i see and uh
00:06:09 and uh bro you say brian martin was by now the principal
00:06:11 principal construction professional yes was there anything in this question that uh
00:06:17 uh you couldn't answer but you felt he was better placed to answer uh from my perspective um i'd entered my new role of head of technical policy and so i now had a locus for all technical
00:06:28 i now had a locus for all technical aspects of the building regulations and so bringing brian into the department to lead on part b meant i could focus my attention more broadly on other activities i understand that as a
00:06:39 other activities i understand that as a description of your different roles uh um in in the hierarchical sense but in relation to the substance what was it about mr
00:06:50 to the substance what was it about mr cho's question that you were not adequately equipped to answer because i probably didn't have time to deal with it and so i passed it on to in effect the heartbeat desk officer i see just to say to be clear you could have
00:07:02 just to say to be clear you could have answered this question but but you just you had other things on your plate and so you handed it to the person deputed to do that right i see were you yourself
00:07:13 were you yourself unsure
00:07:14 unsure of whether these were equivalent whether the uk classes and the euro classes were equivalent as mr cho asked from my perspective reading
00:07:25 perspective reading this email that you've just kindly showed me i wouldn't have used the word equivalent as we we covered um in quite some depth yesterday they're not equivalent they're two completely sets of different tests
00:07:38 two completely sets of different tests and therefore the transposition that undertook in 2002 was
00:07:43 was trying to give visible recognition to these new european test methodologies and as we discussed in relation to the note to diagram 40 yesterday as well they're not equivalent if you want to
00:07:55 they're not equivalent if you want to claim a class naught or if you wish to claim
00:07:58 claim a euro class you would have to undertake the test on that product what was your reaction
00:08:04 reaction to your seeing this question raised by somebody
00:08:09 somebody in the international market about equivalence i can't recall were you surprised or concerned that others internationally were drawing that equivalence or at least asking whether or not there was equivalence i i
00:08:22 whether or not there was equivalence i i really can't recall did the fact that adb was being interpreted in this way or at least questions being asked about whether it was the right interpretation not cause you to reflect on whether uh similar
00:08:35 you to reflect on whether uh similar misinterpretations might be taking place in the uk market no why is that because
00:08:42 because in terms of looking at the email and i can't remember this coming in this email i would have had a quick glance through and then i passed it over to debbie and
00:08:53 to debbie and and brian for them to consider i i can't even be sure that i picked up on the equivalence issue in in my cursory look and passing it over so you didn't you didn't strike you at
00:09:05 so you didn't you didn't strike you at the time did it then receiving this that the small print at the foot of diagram 40 was perhaps in some quarters either not being read or if it was being read was being misunderstood
00:09:17 it was an email coming in asking a question from another regulator i believe
00:09:22 believe um outside of the uk i would have just considered it and passed it through right
00:09:31 were you aware standing back a little bit from this email at this time or indeed at any time of manufacturers simply stating an equivalency between class naught and class b
00:09:43 class naught and class b without carrying out the european testing
00:09:46 testing or without carrying out the class not testing
00:09:49 testing not that i can recall no no so you weren't aware is this right you weren't aware of any manufacturers or any certification bodies saying that because a product had passed class b it achieved class b
00:10:01 class b it achieved class b it could be regarded as having class naught or vice versa not that i can recall let's go up to the top of the email chain there on your screen you can see
00:10:12 screen you can see on the 22nd of december 2009 debbie smith
00:10:17 smith sends an email to brian martin you're not copied in on it
00:10:23 with an attachment letter bm to cho and it says brian please see a draft response as discussed happy christmas debbie um now as you've told us of course brian
00:10:35 um now as you've told us of course brian martin by this point no longer worked at the bre but in the department didn't he he did i think he started in 2008 at the department that's correct but that was after some a period wasn't it of working
00:10:48 after some a period wasn't it of working part-time for the department and part-time for the bre that's correct you know when that started
00:10:55 that would have started on his arrival into bre
00:10:58 into bre so from recollection brian joined bre to take over from a gentleman called richard reed richard reed he was a technical adviser to the department on a part-time basis
00:11:10 part-time basis richard was due to retire brian was appointed within bre um
00:11:16 um and therefore that naturally moved into brian working part-time at bre and with us there yeah when did that start when did that dual uh location if i could put it that way
00:11:27 uh location if i could put it that way start
00:11:29 start whenever i forgive me i can't recall what date brian started at the bre maybe 2000 right 2 2003. we we can pursue that somewhere else but that that's helpful but
00:11:40 that that's helpful but did mr martin discuss this draft response with you not that i can recall now did the subject of the abandoned transition period or the um perhaps
00:11:51 transition period or the um perhaps unstarted transition period come up at all uh or the subject of the end date which had passed in relation to this in relation to this not that i can recall sir no
00:12:02 not that i can recall sir no at this time did you discuss the possibility of getting rid of national the national class system at least within approved document b as a relevant standard with brian martin
00:12:14 as a relevant standard with brian martin we might have discussed it at some point in relation to future reviews but i don't recall it at any point privately did this email therefore not
00:12:25 privately did this email therefore not prompt a discussion between you and brian martin or to your knowledge brian martin and anybody else about
00:12:32 about the uh
00:12:33 the uh potential for getting rid of the national class system within adb nicer so at this time is casting your mind back
00:12:43 back was it the thinking that class naught would remain within diagram 40 really
00:12:50 really for the foreseeable future so
00:12:54 so again from recollection we'd been through the approved document b
00:13:00 b 2006 review that was a fundamental review from recollection and it might have come later
00:13:11 and it might have come later than this email there was a consultation by the department looking to take forward a periodic review cycle to the to the approved documents as it was felt to be quite ad hoc and so
00:13:24 as it was felt to be quite ad hoc and so there was engagement with external stakeholders to suggest maybe we should become more periodic and cyclical and how we undertake reviews and i i can't quite recall the timing but there was a commitment in that
00:13:36 but there was a commitment in that consultation document at that point suggesting the next likely review point for fundamental review of part b was 2013
00:13:46 2013 from recollection but as to whether that discussion was taken that the bs-476 would have ultimately been withdrawn from reference in the approved
00:13:57 withdrawn from reference in the approved document at that time i can't recall if we'd had that discussion right we know as a fact that class naught was not withdrawn until 2018 after the grenfell tower fire yes sir
00:14:08 yes sir why is why was it left until after the grenfell tower fire to pull it from my perspective um i left the department in 2013.
00:14:19 department in 2013. um and so
00:14:21 um and so in terms of commitments at that time for approved document b back in 2013 the one commitment that government of the day had made was that the the approved document b would be revised
00:14:33 approved document b would be revised with the new version being in 2016 and 2017
00:14:36 2017 right um
00:14:38 right um and that commitment was made in a response
00:14:41 response to the coroner overseeing lack of house but as to why it took ultimately to 2018 i'm afraid i left the department in 2013. now
00:14:51 2013. now in late december 2009 what was the status of the revisions that came into the 2010 version of approved document b
00:15:03 uh forgive me i wasn't brian was leading upon those at that time i
00:15:09 i i vaguely remember something in relation to recognition of the lifts directive yes and the testing of lift fire testing of lift landing doors and there was a need to provide visible recognition
00:15:21 need to provide visible recognition to
00:15:22 to that new european method of test so i think that formed part of the 2010. the class naught didn't feature it was mit from recollection it was it wasn't a
00:15:33 recollection it was it wasn't a fundamental review and therefore class b class naught didn't feature it was giving visible recognition to lift landing doors why would you need a fundamental review given the
00:15:44 given the detailed discussion that had been and testing that had gone on
00:15:50 by then almost a decade before why not just get rid of class naught because that would be typically undertaken by by methods of developing a consultation
00:16:02 consultation bringing together all the relevant research work in relation to what you're proposing such as the removal of national classes and then putting out consultation with a
00:16:14 and then putting out consultation with a regulator impact assessment for three months
00:16:17 months and gleaning comments back working with the brac working party to develop the revised document and then ultimately publishing and therefore
00:16:27 therefore well by this time resources were already being quite tight and therefore to try and do something like that i suggest just in relation to an important but small part of the
00:16:38 to an important but small part of the approved document might mean we never get to touch the approved document b for a number of years thereafter and therefore typically what was looked on for what became the 2010 approved document was an
00:16:50 became the 2010 approved document was an administrative recognition of the lift landing doors arrangement with a view of ultimately hopefully doing a more fundamental review of part b what about 2013 why was class naught not considered
00:17:03 why was class naught not considered for abrogation in 2013 when those changes came round so from recollection by that time new government arrived by 2010 um
00:17:14 um there was not from recollection a desire for government to undertake i would be very very limiting on on the reviews being undertaken in terms of the building regulations
00:17:25 in terms of the building regulations and so
00:17:27 and so the the original commitment or suggesting that there would be something happening in 2013 didn't occur
00:17:36 why would you need to go through this great panjandrum of a consultation process etc when in fact all of that work had been done in 2000 and 2001. particularly after the testing in 2001
00:17:48 particularly after the testing in 2001 and the reports to you in 2002. we could certainly refer back to that but we are duty-bound to actually undertake public consultation to prepare impact assessments as to like
00:18:01 to prepare impact assessments as to like the effect and benefit to the to the industry at large and therefore as as a policy official we can't just make simple change well we can't make
00:18:12 make simple change well we can't make changes removing reference to national standards
00:18:15 standards without going through appropriate procedures including for example taking advice and consulting with the building regulations advisory committee it was a very formal set process that we have to go through to make changes to
00:18:27 have to go through to make changes to both the regulations and the statutory guidance even if they were matters of life safety uh with some pressing degree of urgency which urgency had not been felt in the previous decade
00:18:39 felt in the previous decade we would have to go through due process to undertake such things now just help me when in 2013 did you leave the department december so by that stage uh as this is right i
00:18:50 so by that stage uh as this is right i think isn't it the latino coroner's recommendations had been um published yes uh for some nine months
00:19:01 published yes uh for some nine months yeah they came at the end of march 2013 didn't they that's correct and we know that the minister's response to those recommendations promising a full review of adb by 2016 2017 came on
00:19:13 review of adb by 2016 2017 came on this is right i think the 20th of may that sounds about right um what did you have any role in the seven months or so before your departure from the department in
00:19:25 departure from the department in instigating any work on that
00:19:28 that review
00:19:29 review um
00:19:31 um no not directly from recollection what had happened already by that time is that the department has left a number of further research contracts to support the next review of approved
00:19:43 to support the next review of approved document b i believe those research contracts which were quite sizable were let in 2012 with a view to them being published or made available to the department by 2014
00:19:55 department by 2014 so
00:19:56 so the ship had sailed as it were there was work underway being prepared that would inform the next review and that was happening right did you do anything in the seven months or so between may
00:20:08 between may 2013 and your departure to push the abrogation of class naught and the withdrawal of ps476 higher up the agenda
00:20:20 higher up the agenda for recollection no we'd had a commitment by government to whom we serve
00:20:25 serve that there would be a new approved document
00:20:28 document in 2016 or 2017 and
00:20:32 and so that would amount to a fundamental review supported by the research to which i just referred and so i would have considered okay that's the way we now move forward
00:20:43 now move forward but again as i say i was had a technical policy at that time and so of course fire safety sat within my scope but it's fair to say the likes of energy efficiency parts of the building
00:20:54 efficiency parts of the building regulations were taking up a considerable amount of my time but as i say government had set a date of 2016 2017 and for a new adb yes
00:21:06 for a new adb yes and if
00:21:08 and if the new adb in 2016 and 2017 was going to remove class naught based on bs 476 part six and seven and came out in
00:21:19 and came out in even in 2016 that would mean wouldn't it that that some
00:21:25 some 15 years
00:21:27 15 years had been allowed to elapse between the testing
00:21:32 testing done
00:21:33 done with public funding by the bre under cc 1924 and the date of its removal that would be correct sir the point that i would add as well in
00:21:45 the point that i would add as well in 2013 it was quite an important point because that is the time that government decided that with the advent of the construction products regulations ce marking became mandatory
00:21:56 regulations ce marking became mandatory in the uk and therefore by virtue of where the test methodologies were available in the product standards you now had to apply the chc marking to the relevant products and have them tested
00:22:08 relevant products and have them tested to the new european methods of tests producing a declaration of performance so in 2013 that had happened as well why is that relevant to the um continuing to keep class naught
00:22:22 the um continuing to keep class naught and diagram 40 unamended between 2013 and the date of the grenfell tower fire which spans uh the entire period
00:22:34 uh the entire period are promised by government for a review of adb isn't it sorry could you ask the question again please sir yes why is what you've just told me about the um ce marking relevant to the fact that
00:22:46 ce marking relevant to the fact that government kept class naught within diagram 40 and indeed diagram 40 wholly unamended during the entire period between 2013 and 2017.
00:22:58 and 2017. so i'm sure we'll cover approved document be 2006 at some point but from from the perspective of the european standards it took a number of years for the
00:23:10 it took a number of years for the harmonized product standards the test methodologies and classification but even even around 2006 2007 onwards they weren't completing their
00:23:21 they weren't completing their publication so there were still situations where there were products and product standards that whilst they had a reference to methods of test there wasn't what we call fixing um and
00:23:32 there wasn't what we call fixing um and mounting standards that tell you how to actually test those products so in very simple terms for the for the purposes of the european testing the suite of standards needed to test
00:23:43 suite of standards needed to test products
00:23:45 products of all types wasn't completed and therefore to then remove
00:23:50 remove national standards without a complete suite
00:23:53 suite of european standards being in place could have been problematic
00:24:00 well just help me with this would not have been possible [Music]
00:24:06 [Music] for the government even going through the bureaucratic process which you've described
00:24:12 described to amended approved document b simply to say that all elements to the external wall must be of limited combustibility it doesn't do anything to
00:24:23 combustibility it doesn't do anything to remove class naught if you wanted out there for industry yeah it's just a question of how you frame adb
00:24:31 adb yes sir that is one possible way um again
00:24:36 again if that were to happen it would of course be subject to consultation and similar
00:24:41 similar um
00:24:42 um it's quite difficult raising it here given the public inquiry into which i'm referring to we are also mindful too that we had fires of special interest reports coming forward to inform the department of what
00:24:55 forward to inform the department of what was happening and we didn't start seeing fires internationally until sort of thankfully wouldn't want them at all but 2010 2011 2012
00:25:06 2012 and therefore it was then that the body of evidence was coming forward and i've raised this already but and please forgive me um we never agreed how i'd best refer to this is that the intention was also felt that
00:25:19 is that the intention was also felt that the functional regulations and the extent guidance at the time would still tend to suggest that such types of installation would not show compliance with the building regulations all right thank you thank you
00:25:31 all right thank you thank you i i just just going back and answer or two earlier why did you
00:25:37 suggest this i don't think you needed to remove
00:25:40 remove all of the national standards in their entirety you just needed to remove or clarify remove class naught or clarify diagram 40 didn't you why did that why did that cause such why
00:25:52 why did that why did that cause such why did the fact that the european tests were not as you put it fully developed even by 2007 matter to that because if you remove a national classification and there isn't sufficient and complete information
00:26:05 sufficient and complete information available how you then move forward with european tests then that could be problematic i don't understand that as we've seen from the euro what we haven't seen fully but as you know from the european amendments
00:26:16 you know from the european amendments yes
00:26:17 yes table a7
00:26:19 table a7 as it certainly kept became in 2006 contained european classifications for non-combustibility and limited combustibility which were achieved by european tests similarly class b in
00:26:31 european tests similarly class b in diagram 40. i yes i i agree sir and therefore would i be wrong in thinking that they were inserted by that the process of change to approve the approved document
00:26:44 change to approve the approved document um on the basis that those tests were achievable they were achievable for some products because there is a big body of what we call harmonized product standards some 400 now in total and still a great many
00:26:57 400 now in total and still a great many haven't been published even though you might have a harmonized product standard and methods of tests and similar there were discussions at a european level on how you mount and fix such products in
00:27:09 how you mount and fix such products in the test rigs because what we had for the first time at a european level because you had to achieve repeatability across all the laboratories across europe is that there were very specific
00:27:20 europe is that there were very specific provisions on how you'd mount and fix different types of products in the sbi test or similar and they were quite parochial to the product type and
00:27:32 quite parochial to the product type and so
00:27:33 so even back in 2002 when we produced the approved document european supplement it was clear that a large body of products couldn't at that time
00:27:45 body of products couldn't at that time test to the european methodology and that over time developed as more standards were ultimately published european standards to support new harmonized products
00:27:57 harmonized products mounting and fixing details for the for the test and similar did there not come a time when the
00:28:05 when the um
00:28:08 the the tests became practicably adoptable across the range of products available on the market so that you could say right well we can now get rid of class nor because it is an inferior test
00:28:20 inferior test um
00:28:22 um i can't recall ever seeing a detailed breakdown of when that became an option
00:28:28 an option um but that potentially could have been done but was it examined was were you on it were you monitoring the um perfection or the improvement of the european tests and the growth of the
00:28:39 the european tests and the growth of the products that could fit into it and be tested under it with an eye to getting rid of class naught as soon as you could i wouldn't have been doing it at that time
00:28:47 time let's turn then to approve document b 2006 to move forwards now can we start with clg-401508
00:28:58 this is a request for a framework agreement
00:29:01 agreement uh uh undated but created uh it appears from its contents in 2003. i say that because if you look at the last sentence of the second paragraph it
00:29:12 last sentence of the second paragraph it says work to review the current adb is to commence in january 2004. so that's a an educated guess on our part but would we re-write it i believe so yes sir now um the what was the purpose of this agreement or
00:29:27 agreement from recollection the undertaking of a review of a document the size of approved document b is a huge task and so it wasn't uncommon for the department to utilize
00:29:39 department to utilize outside expert external expertise to help oversee that revision and in this case this would have been the support contract
00:29:47 contract that
00:29:47 that bre
00:29:49 bre held
00:29:50 held to assist the department in the development of the new approved document b
00:29:57 and now if we go to uh page one you can see the first paragraph
00:30:02 paragraph yes um and in the la again in the last sentence there you see the reference there to the european amendments to provide visible recognition yes and then if you go to um
00:30:14 yes and then if you go to um page two you can see aim aim and objectives at the top of the screen at the top of the page with two tasks an objective one uh
00:30:24 uh is or task one uh is a survey of relevant stakeholders to identify further issues that they consider may be important
00:30:33 important to include in the revision of adb we therefore need to see to see a need to undertake a forward look exercise in which we consult our stakeholders to see what they would like to see in an amended adb and why
00:30:44 amended adb and why so that was one objective yes and if you go to page three
00:30:56 there's objective
00:31:00 objective 3 or task 3 and the bullet points there uh and under task four um technical support to officials in the drafting you see that yes i do yes
00:31:13 drafting you see that yes i do yes now
00:31:13 now there are other things in here as well but
00:31:15 but can we take it that this document um contained all the objectives of the government in amending adb and the processes by which it would go about
00:31:26 processes by which it would go about that
00:31:26 that it contained the expectation of what we needed from the contractor i'd be re to undertake it in terms of commitments of what government were expecting a large part of of what comes
00:31:39 expecting a large part of of what comes forward would included what was learned from the forward look to which you referred and ultimately public consultation as well but this was this was the broad framework in place for the
00:31:50 was the broad framework in place for the work that bre would undertake to support the department in completing the approved document be 2006. now the contract was let to the bre uh let's look at the bre's proposal for it it's a
00:32:04 look at the bre's proposal for it it's a bre401953 dated the 23rd of march 2004.
00:32:10 bre 401953 and
00:32:14 and you can see at the foot of the page the date
00:32:17 date and you can see its title and it's prepared for odpm yes which is the department at this stage um
00:32:27 now the the closing report to that we can go to it if we need to was addressed to you personally obviously in your capacity as official does that tell us that you are overseeing the carrying out of this
00:32:38 overseeing the carrying out of this contract uh in effect yes you are yes now let's go then to bre 401953 page seven of this document and you can see the
00:32:49 of this document and you can see the bre's proposal here and the proposal objectives and uh
00:32:55 and uh task one
00:32:57 task one paragraph one is uh
00:33:08 i'm sorry page eight apologies page eight if you go to page eight you can see proposed objectives and
00:33:15 and task one and the specific objectives of task one are one to conduct a forward look exercise the stakeholders by means of a targeted questionnaire face-to-face workshops and other innovative
00:33:26 workshops and other innovative techniques such as the setting up of an internet focal point to obtain information on the issues they identify to be important and requiring revision and if you go forward
00:33:37 and if you go forward please
00:33:38 please to page
00:33:42 10 under program of work item 4 task 1 forward look you can see the proposal in more detail there and and in essence it's right
00:33:53 there and and in essence it's right isn't it that that was intended as a wide consultation yeah so we were very fortunate i had access i had a new person join me with him in my team a policy expert
00:34:04 team a policy expert and
00:34:04 and we'd had sufficient funding to actually undertake a sizable amount of of research in a number of technical areas
00:34:13 areas to to feed into this review but what we wanted to do and we'd never done it before for any of the approved documents was to undertake two pieces of work even before we started to develop the draft
00:34:25 before we started to develop the draft the first of which was the forward look so this was very much about reaching out to industry and stakeholders to better understand what they would like to potentially see in a future approved document be
00:34:37 in a future approved document be and why
00:34:38 and why yeah and if we go to page 11 fourth paragraph down it says the forward look exercise
00:34:44 exercise is a new approach to the process of revising parts of the building regulations and will not be familiar to many of the key stakeholders uh as such care will need to be taken to
00:34:55 uh as such care will need to be taken to ensure the widest possible audience as well as a general press release we will approach all the relevant trade and professional bodies and ask them to promote the questionnaire to their members
00:35:05 members now
00:35:06 now that so that's the consultation exercise that that was proposed by the bre and was i think accepted as part of the contract that was led to them yes yes now let's then go to the forward look report that is at clg
00:35:19 look report that is at clg 401527 please
00:35:25 and on the first page you can see that it was prepared for you it was dated the 2nd of july 2004 and it's entitled forwards look yes and if you go please to page two you can
00:35:36 and if you go please to page two you can see that it was prepared for you by sam greenwood in the fire division of the bre and signed off by peter field at the bre yes yes and if we go to page
00:35:47 the bre yes yes and if we go to page seven there's a there's a reference to um regional workshops uh in watford manchester and cardiff and then if you go to page 36
00:35:58 then if you go to page 36 appendix a you can see that there are comments and suggestions for the review of approved document b and there's a it's a this is i think a
00:36:09 and there's a it's a this is i think a summary
00:36:10 summary for you of what the uh survey found and if you go to page 48 please
00:36:18 within it um you can see b4 is addressed there very short external fast bread 14.2 is about recommended space
00:36:29 14.2 is about recommended space separation and 14.9 says this the text was discussed at a recent seminar it causes confusion
00:36:38 confusion can the class naught be on combustible material now that's a that's a question small two lines buried away deep in the forwards look
00:36:50 buried away deep in the forwards look report
00:36:51 report um
00:36:52 um did you read it did you nate it i would have read the report from recollection there would be many items in here that
00:37:03 there would be many items in here that would have caught my interest i can't confirm that i definitively saw this
00:37:09 this um
00:37:10 um but i i would have read it right now when you got this report what process was in place for going through
00:37:19 through each of the points gleaned from the consultes
00:37:25 consultes in detail line by line laborious they may have been and making sure
00:37:31 sure that they had the relevant prominence in the next part of the exercise so
00:37:38 so from recollection this forward look um would have been provided into the brac working party and it would have been
00:37:50 and it would have been in addition to the backward look that arab undertook for us which was what what was working what what wasn't and how they came together so it would have been shared at this time with the black
00:38:02 been shared at this time with the black working party from recollection and i envisaged you it would have been a tool that would have been utilized by the bre as they started to develop the revised approved document be
00:38:13 the revised approved document be leading up to public consultation right now um i know you may not be able to remember this question specifically but do you know um
00:38:23 um who was saying that the text of adb
00:38:28 of adb dealing with external fire spread causes confusion uh i wouldn't know that sir this would have come from one of the three the three seminars and whoever the stakeholder would have said it did it surprise you
00:38:39 it did it surprise you that there was confusion and this question was being asked at all as i say it's it's quite a sizable report and there are and i haven't looked through it for many
00:38:51 and i haven't looked through it for many many years forgive me there'll be other similarly important points raised so i can't recall right
00:39:02 now now this was one recommendation in a list of hundreds was there a sorry a response not recommendation it was a response in a list of hundreds what was the process for within
00:39:14 what was the process for within government for filtering these out and prioritizing them so the expectation is that the forward look that was undertaken and the backwood look would feed in
00:39:24 feed in to the consideration and then development of the consultation version of the approved document b but who in government took a fine tooth came to this and gave it a priority ranking to decide what to
00:39:36 it a priority ranking to decide what to do with it i wouldn't say anybody took a fine tooth going through it and priority ranked it what was what was important is that we gathered this intelligence and understanding bre had
00:39:48 understanding bre had and fed
00:39:49 and fed that into the process of then working through
00:39:53 through the entire approved document to develop a consultation version right what happened to this observation um
00:40:03 um i i can't recall in terms of it would have gone it would have fed in it would have formed part of the wider considerations of the
00:40:13 of the um
00:40:16 um the consultation draft being developed and like all of the comments both in the forward look and backward look it would have been considered by both bre and the department in the
00:40:28 by both bre and the department in the round and working with the brac part b working party but to your knowledge my question what happened to it to your knowledge
00:40:40 to your knowledge did it result in any consideration giving rise to any change in the ultimate
00:40:46 ultimate product ultimately um all of the approved document was under consideration so working through the likes of what became section 12
00:40:58 the likes of what became section 12 and annex a of the approved document which talks about the testing of products and materials one envisages it would have been considered
00:41:10 considered as part of what changes we might make therein which then went out for three four months public consultation well envisages it but do you recall it
00:41:21 envisages it but do you recall it do you recall that one of the reasons for
00:41:25 for well what lay behind the changes in the 2006 version of approved document b section 12 as it became was this very question
00:41:33 question and consideration was given and changes were made ultimately to that well were they made in response to this question it potentially could have been in response to this question but also
00:41:44 response to this question but also in relation to what comments we receive back as part of the public consultation but i think you're giving me an answer sorry set on which is founded on on objective logic
00:41:55 which is founded on on objective logic which i understand what i'm really after is your
00:41:58 is your own recollection at the time of whether this question actually bore on the minds of you and your fellow officials in crafting the amendments to approve document b that
00:42:09 amendments to approve document b that we're going to look at i would like to think it was considered by the relevant officials and brac working party right i would like to think to say too but what happened
00:42:22 this is a huge document with an awful lot of comments officials
00:42:28 officials working party members would have been cited
00:42:31 cited on
00:42:32 on the points raised here and in fact this was
00:42:35 was published on the same day as well as the approved document be went out for public consultation in 2005. by virtue of being an end-to-end review of the approved document i believe
00:42:46 i believe such issues would have been considered right let's um let's turn to uh an event in 2005 namely a fire at the edge building in salford on the 6th of january 2005.
00:42:59 january 2005. uh
00:43:00 uh do you have a specific recollection of that event i i i i'm aware of it are you aware of it because of what you've read in preparation to give evidence or were you is it something that you i could
00:43:12 that you i could i could recall the edge fire from the time but i in my preparation i have also seen another day fair enough now let's go to clg three zeros one nine four five five
00:43:23 zeros one nine four five five this is the investigation of real fires report for the relevant period prepared by the bre for you as part of the ongoing investigation of real tires program this one has dated the uh
00:43:35 program this one has dated the uh the
00:43:35 the this one is dated the 31st of march 2010
00:43:41 if we go to page 76 we can see the report on the edge fire
00:43:49 at paragraph 4.1.148
00:43:52 and you can see this fsis so this is a um a fire of special interest yes yes a special interest study uh now it's long i won't read it all out
00:44:03 uh now it's long i won't read it all out to you um it's familiar to those following the inquiry but i'll summarize the first paragraph because it gives details there of the circumstances of the fire um and summarizing it is it was built it was a
00:44:14 summarizing it is it was built it was a 19-story building clad in san what are called sandwich panels made of an expanded polystyrene core with aluminium skins the fire started in the balcony area of the second floor the sandwich panels as
00:44:27 the second floor the sandwich panels as they were called delaminated and exposed the expanded polystyrene core to the fire
00:44:33 fire thereafter the spread of fire was as is said extremely fast spreading up 17 floors in less than 10 minutes with unusual downward far spread now
00:44:44 now that is summarizing that long paragraph looking at the final paragraph on page 76 it says this it was not possible to establish if the cladding system had been installed complete with cavity
00:44:55 been installed complete with cavity barriers at floor level in accordance with the approved document b but fire and rescue service sources believe that this was the case however the fact that the fire burned so rapidly through the core of this type of sandwich panel
00:45:08 core of this type of sandwich panel means that even if the construction complied with the current guidance the rapid fire spread through the panels themselves would not be restricted as such the fire and rescue services have grave concerns that when the building
00:45:21 grave concerns that when the building becomes fully occupied a fire of this nature could quickly become out of control and put the lives of occupants at risk
00:45:29 now um you got this report when you read this report um were you concerned by this fire and by what he said about it uh i would have been yes yes were you concerned specifically by the fact that
00:45:40 concerned specifically by the fact that it had been established that even though the construction complied with the guidance then in force fire spread would have been rapid unrestricted and would have put lives at risk i would have julie noted that um may we
00:45:52 i would have julie noted that um may we go back to the text please mr miller yes can we get back a page please to page 76
00:46:05 so my immediate question would be would have been
00:46:09 have been does
00:46:10 does this arrangement comply um in terms of my concerns over the use of
00:46:17 of combustible insulation at height so
00:46:21 so yes i would have yes it picked up yes yes now the relevant sections of the guidance then in force were the provisions of diagram 40 that we've seen namely those from 2000
00:46:32 namely those from 2000 amended to give visible recognition to class b yes as was decided in 2002 yes yes
00:46:39 yes um did you or anybody else so far as you know at the department consider that this fire at the edge and the findings in the investigation of real fires report here might need to to be communicated
00:46:51 might need to to be communicated immediately immediately to fire and rescue services nationally and to designers to builders and others involved in construction i can't recall if this document was
00:47:03 i can't recall if this document was shared with fire safety colleagues that oversee the fire and rescue service um if that happened um
00:47:13 um but from
00:47:15 but from recollection this immediately would have fed into the approved document b review but i
00:47:21 but i i can't recall how any further information about this would have been shared more broadly maybe potentially by the outreach arrangement by bre publishing fires of special interest and
00:47:35 publishing fires of special interest and at times presenting on findings but i can't recall if there's any specific immediate response to put this out to the market we haven't seen in the documents any alert
00:47:46 documents any alert given by government either to fire and rescue services or to designers or to builders or anybody else involved in the uk and construction industry about the risks which had
00:47:57 which had um eventuated at the edge as a result of the construction which apparently complied
00:48:02 complied we've not seen any evidence like that and my question is why is that um i can't recall sir but i believe there was further discussion about this particular fire
00:48:13 particular fire with the bre and the discussion about maybe some concerns over whether the insulation wasn't being provided as a as
00:48:26 as a as a product for the purposes of providing thermal insulation it was there as a stiffening filler type material that wasn't necessarily been recognized
00:48:37 that wasn't necessarily been recognized potentially in this case as needing to be a material of limited combustibility i'm i'm also mindful that this particular this is from recollection
00:48:48 this is from recollection the senior brigade officer in question for this fire
00:48:54 fire was somebody that worked in the department simon hamm from recollection and i know discussions were held and information shared between bre and the fire rescue authority to aid
00:49:07 and the fire rescue authority to aid their understanding and similar and so from recollection you know that might well have gone forward to help further advise brigades more generally now leave aside
00:49:19 brigades more generally now leave aside because we'll come back to it the process of amendment and the relevance of this fire to the amendment leave that on one side for the moment my question is a prior one
00:49:31 question is a prior one when you saw the report on the edge fire and the fact that
00:49:39 that although
00:49:40 although this type of sandwich panel had facilitated rapid fire spread nonetheless it comply with current guidance
00:49:47 guidance why wasn't the market as it were and fire and rescue services across the country alerted immediately to this risk
00:49:58 from recollection i would have probably wanted to understand more information in relation to this fire um and
00:50:11 and as i say there was an exchange of information between bre from recollection and the chief fairly chief officer within the brigade
00:50:23 fairly chief officer within the brigade and so
00:50:24 and so that such learnings were being shared at this level my immediately immediate thought on this was to think about what this might mean
00:50:35 was to think about what this might mean as you've already suggested so that what we'd have to do if this was you know something that we need to be born in mind for the the part b review certainly
00:50:46 the the part b review certainly um
00:50:47 um but
00:50:49 but discussions between the bre or one or two fire and rescue services is not the same thing is it as a general alert across the whole of the uk construction industry
00:50:58 industry no it's not um the benefit i suppose if it was the gentleman i'm thinking it was he would have been a member of safoa and so would have shared the information but no i agree with you sir no
00:51:10 no i agree with you sir no and you had no reason i would suggest to think that this was a one-off and therefore no reason to think that the risk wasn't worth investigating to make sure that it was negligible or not
00:51:21 make sure that it was negligible or not from recollection it was the first time i'd seen something like this um
00:51:26 um and
00:51:28 there wasn't evidence coming forward through the fires of special interest that
00:51:32 that something like this had happened before of this nature for this example and therefore it was something that we we recognized and we'd have to take action for as part of the part b review
00:51:45 action for as part of the part b review that was actually already underway as part of the part b review but as i say before that why not a general alert given that you couldn't discount this as a one-off
00:51:56 discount this as a one-off typically
00:51:58 typically the department didn't issue a general alert but
00:52:04 but from recollection as i said at the start of this part of the discussion we work very closely with our majesties inspectors as well and so there might have been
00:52:15 and so there might have been some exchange there with those that oversee the fire and rescue authorities in addition to as part of the outreach arrangement that bre undertook as well
00:52:26 arrangement that bre undertook as well for for
00:52:28 for for making this information available now you just referred to the inspectorate now help me mr bird with that i'm sorry to go no not into a slight diversion but wasn't the inspectorate
00:52:41 wasn't the inspectorate abolished
00:52:42 abolished this this around this time by the rro the regulatory reform order i don't it's not my understanding that her majesty's inspectors of the fire service were ever abolished
00:52:54 were ever abolished the
00:52:55 the fire precautions act 1971 might have been replaced by the regulator reform fire safety order that's that's
00:53:03 that's as to the actual the demise of the inspectorate i can't recall that i thought they still maintained their advices well they were replaced by a different body i think okay um but um is it
00:53:17 body i think okay um but um is it was it your is it your evidence that that replacement body that either had come in by this time or was about to come in as a result of the rro fsa uh
00:53:28 come in as a result of the rro fsa uh was communicated with by you and and and asked to disseminate this information widely i can't recall if that definitively happened now can we then look at clg3018832
00:53:49 and now this is this is an email from brian martin to you on the 18th of january 2005 copying in sarah colwell martin ship sam greenwood and peter field as you can see yes
00:54:00 yes and it says this anthony
00:54:04 anthony having reviewed the recent cladding fire in manchester and having received a number of technical inquiries on this issue sarah sam and i have come to the conclusion that the guidance in adb on external wall construction is in need of
00:54:16 external wall construction is in need of clarification this appears to be as a result of changes in construction practice whereby the intent of the original guidance has been circumvented i've attached some proposed changes to the current version 12 draft
00:54:28 the current version 12 draft consultation this still needs some work as in its modified form this would prohibit timber framed buildings over 18 meters high however we do feel it is important that something on this matter is included within the consultation to
00:54:40 is included within the consultation to ensure that this matter is given to you consideration now i'm just um pausing that do you con do you remember this email do you remember i don't remember the email but i have no doubt that it came in and
00:54:51 i have no doubt that it came in and thereafter it would have been discussed and can we take it that the recent cladding fire in manchester is a reference to the edge fire i believe so yes sir did you agree with the conclusion that the the guidance on
00:55:02 conclusion that the the guidance on external wall construction was as mr martin puts it in need of clarification so there there would have been discussion and context whether it happened before or following this email
00:55:14 happened before or following this email and i believe this is where the concern came that
00:55:19 that people were utilizing in this case polystyrene as a material which typically has a thermal performance to it but it wasn't being used for its thermal performance criteria necessarily it was being used
00:55:31 criteria necessarily it was being used as part of a paneling system that provided decorative detailing to the building
00:55:36 building from recollection and therefore when you looked at what was the extant guidance in adb 2002 whilst there is the general provision
00:55:48 whilst there is the general provision about
00:55:50 about care being taken with combustible materials generally when you then went to the the provision that sat beneath paragraph 13.7 i think for recollection it was talking about controlling
00:56:02 it was talking about controlling thermal insulation only in ventilated cavities and therefore there was there would have been discussion as to well what can we put into the
00:56:13 well what can we put into the consultation document that makes it more relevant that actually you need to think about
00:56:20 about all such insulation products and not necessarily because they're providing an insulation mechanism they've just been included because it was an appropriate product to
00:56:32 because it was an appropriate product to use
00:56:33 use as an add-on as a as a decorative panel to the building what were the changes in construction practice
00:56:40 practice that
00:56:41 that what did you understand brian martin was referring to in the last sentence in the first paragraph
00:56:52 i can't recall but we would have discussed it [Music]
00:56:57 [Music] when we followed up on this email what was the intent of the original guidance as you understood it that he also refers to the intent of the original guidance i would envisage is that
00:57:08 that it was to control appropriate materials and products that were combustible
00:57:17 depending upon the type of building the height and its position
00:57:23 just while we're on the point about ventilated cavities i think it's right isn't it going back to the 2000 amendments that that reference to ventilated cavities in
00:57:34 reference to ventilated cavities in that part of 13.7 came in in 2000 because before 2000 in the 1992 version of adb it wasn't there correct sir why is why was it introduced in 2000 as we
00:57:45 is why was it introduced in 2000 as we discussed on thursday afternoon i
00:57:49 i just arrived into the department in
00:57:52 in 1998
00:57:54 1998 working to tony edwards the principal fire safety professional what became the 2000 edition of the adb had already been out for public consultation and had then come back in
00:58:05 come back in and therefore i can't recall what the reason was okay now continuing with the second paragraph of his email you can see that he says uh he attaches
00:58:16 you can see that he says uh he attaches some proposed changes and then he says this still needs some work as in its modified form this would prohibit timber-framed buildings over 80 meters high exclamation mark yes then it goes on as we've seen
00:58:31 let's go to the attachment
00:58:35 it's at clg three zeros one eight eight three three
00:58:42 bearing in mind the sentence i've just read to you now
00:58:46 now uh you can see that what has happened here is that he's taken a text which now says
00:58:57 which now says external surfaces with 11.5 and 11.6 you see that yes with some changes within it
00:59:07 and under the external wall construction 11.7 and 11.8 yes yes
00:59:17 yes yes and under 11.8 you can see that he has deleted the words ventilated cavities in hasn't he yes he has
00:59:32 and if you look at the second line of 11.8
00:59:39 uh you can see the words or any other material i do now
00:59:46 i do now those words weren't in fact in the 2000 straight 2002 version were they no they were not
00:59:55 can we take it that
00:59:57 that leaving aside the deletions in here
01:00:02 in here this text
01:00:04 this text as at the 18th of january 2005 was what had come back from consultation no right what was this text this was text
01:00:15 right what was this text this was text from brian suggesting some potential changes that we could put into the consultation document which was to be published in the july 2005.
01:00:26 the july 2005. right so just help me leaving aside the deletions in other words the unchanged version
01:00:32 version was a version is this right which was a proposed full consultation but was a a version with which you were content uh no
01:00:40 no um this this was following brian's email this was his and maybe the team's initial discussion as to what we might need to do in
01:00:51 as to what we might need to do in relation to specifically 11.8 that then goes in to the draft document for public consultation and so if we look at 11.8
01:01:05 and so if we look at 11.8 i understand the deletion what it was saying categorically is that in a building with a story 18 meters or more above ground level all insulation should be a material of limited combustibility
01:01:17 combustibility i think there was an added text about or any other material used yes which is what brian refers to that of course that would have huge connotations if you worded it in that way
01:01:29 worded it in that way for the likes of the use of timber frame construction even plasterboard with paper-faced finish even laminated glazing and so it was just a a point to discuss
01:01:42 and so it was just a a point to discuss further as to what might find its way into the eventual approved document b consultation mr burn i'm sorry it may be my fault
01:01:50 my fault that's very helpful to know that um but what i'm just interested to know is what was the text what was the status of the text
01:01:59 the text upon which brian martin was working it was developing text right and it was being developed by him and the department you presumably
01:02:10 department you presumably text is
01:02:12 text is being our contractor the text would have been developed and
01:02:16 and commented upon and it would have been developed and refined and commented upon um ultimately leading to a consultation yes i follow so this is pre-consultation during the
01:02:27 so this is pre-consultation during the process of the departments and the bres working it up yes i follow
01:02:32 i follow um
01:02:37 do you agree that the effect of mr martin's changes as proposed here would have been to have made clear that any material in the external wall
01:02:48 that any material in the external wall construction should be of limited combustibility it would have made it clear yes the all material and indeed exactly indeed adding the words or any
01:03:00 exactly indeed adding the words or any other material and deleting the uh qualification used in ventilated cavities or invaded cavities in if you like yes
01:03:10 like yes the effect of those that language would have made it wouldn't it completely clear that any material whether it's insulation or something else yes
01:03:22 else yes would have to be of limited combustibility yes in other words the entire
01:03:26 entire external will build up yes yes and did you understand that at the time yes i did and was did you understand that that was the aim it i did
01:03:38 it i did however
01:03:40 however the point raised by brian is that the problem with such provisions is that when you control all material in an external wall that
01:03:52 all material in an external wall that has a massive knock-on effect because it also affects timber it timber frame construction was there a policy in the department that um tim use of timber over 18 meters should be preserved in some way there was
01:04:04 be preserved in some way there was recognition that timber where it is safe to do so should be utilized or could be utilized as part of a of a solution you say where it was safe to do so that rather begs the question
01:04:16 to do so that rather begs the question isn't it
01:04:17 isn't it no
01:04:18 no how are you going well let me ask it differently how are you going to accept timber and permit its use in a controlled way over 18 meters
01:04:29 over 18 meters subject to the timber structural frame being suitably protected to ensure its integrity from a potential fire and and specific detailing um there was a project called
01:04:41 um there was a project called timber frame 2000 looking at this very issue of how
01:04:46 how timber framed buildings could be designed in a way that were safe in terms of fire safety and structurally robust but but if i may just go back and as
01:04:57 but but if i may just go back and as brian alludes the problem with saying any other material wasn't just timber frame it would have a knock-on effect that typically if you were laying plasterboard up as part of the construction
01:05:09 construction it wouldn't be allowed because it's typically paper-faced if you're including windows and glazing units which might have e-coatings on them or polymers if
01:05:20 have e-coatings on them or polymers if they're laminated that would in effect limit their use as well and so this
01:05:27 this suggestion um would be rather wanting and very very limiting to the point that it would restrict an awful lot of
01:05:38 that it would restrict an awful lot of of elements that would otherwise normally accept right so
01:05:43 so uh does that tell us that your understanding of his message and this draft was that he did not wish to achieve a wholesale
01:05:55 wholesale ban
01:05:56 ban on materials in the external world build-up
01:06:00 build-up that were
01:06:03 combustible in any way i think the discussion that would have followed on this would be that has some quite fundamental implications um
01:06:15 um we need to think about that more carefully
01:06:18 carefully so
01:06:19 so in other words taking it in stages he wanted
01:06:23 he wanted to exclude some combustible materials from his proposed prohibition or restriction yes
01:06:30 yes um i think where we got to is with
01:06:34 with with
01:06:35 with the edge fire to the back of our mind was
01:06:39 was actually
01:06:40 actually in that instance we're bothered about all insulation wherever it is and then thinking about where if we need to say anything further about
01:06:53 if we need to say anything further about other material more generally do you recall a discussion with him or with the bre about how to go about putting in place a restriction which
01:07:05 putting in place a restriction which accepted
01:07:07 accepted some kinds of material such as timber or plasterboard with a paper face examples you've given we would have discussed the development of this paragraph
01:07:18 of this paragraph for feeding into the part b review
01:07:22 right but as to where we got with that i can't recall so right but the roots of this are important and do we have your evidence as follows that
01:07:32 that at this time after the edge fire it was not your intention
01:07:38 intention and not the government's intention to introduce a wholesale ban on materials in the external wall build up
01:07:49 materials in the external wall build up which were which were combustible the intention was to
01:07:57 was to refine
01:07:58 refine a class a
01:07:59 a class a a draft approved document b that was
01:08:04 that was in this case cognizant something we'd been seeing from the likes of the edge fire
01:08:09 fire that gathered that but not necessarily definitively and always limiting combustible material in all situations ah so just to just to be
01:08:20 situations ah so just to just to be absolutely clear it was not your intention at this time to require all materials used in the external wall build-up of a high-rise building a building above
01:08:32 of a high-rise building a building above 18 meters to be of limited combustibility correct did that intention ever change between january between 2005 and the publication of adb
01:08:43 between 2005 and the publication of adb as in its revised form in 2007.
01:08:47 in 2007. so
01:08:49 so from recollection this document went out for consultation or a version of it certainly the ventilated cavities piece was removed
01:09:02 or any other material used was not included in the final draft that went for consultation but the strikethrough on ventilated cavities happened so the intention was
01:09:14 cavities happened so the intention was showing that we control all insulation that went out for public consultation and then
01:09:23 and then the text was reviewed again subject to the comments that were received
01:09:30 i'm not sure that really answers my question did government's intention change
01:09:38 change between
01:09:39 between this draft and how you've described it and the eventual publication of approved document be in 2007. the 2006 changes
01:09:53 it changed in the context that it was quite clear that
01:10:00 that one would always you have got the overarching provision that is
01:10:05 that is um
01:10:06 um 11.7 anyway about the perceived risks um a building should not provide a medium for fire spread if it is likely to be a risk to health and safety which we've discussed uh previously
01:10:19 we've discussed uh previously but as for the the the specific guidance in 11.8 it was recognized that
01:10:27 that we needed to control insulation generally wherever it should be positioned or actually any material that could be combustible
01:10:38 that could be combustible ultimately that might be provided in the building and not thought about because it wasn't performing a thermal performance or meeting a thermal performance requirement
01:10:56 in fact as well we'll come to it later but
01:11:02 but after the consultation the second sentence of what is here 11.7 came out altogether didn't it the second sentence of 11.7
01:11:14 the second sentence of 11.7 the use of combustible materials for cladding framework or of combustible thermal insulation as an overclouding or in ventilated cavities may present such a risk in tall buildings even though the provisions for external services in
01:11:25 provisions for external services in diagram
01:11:27 diagram 40
01:11:28 40 from recollection satisfied
01:11:31 satisfied sorry sir
01:11:32 sorry sir for recollection that did come out but 11.7 was refined and actually it
01:11:39 it rather than just referring to the use of combustible materials for cladding framework or of combustible thermal insulation what went in is the use of all combustible materials
01:11:53 can be an issue in tall buildings so it was actually that piece was actually expanded to make you think about buildings and design generally so that was expanded as the warning think about
01:12:04 was expanded as the warning think about what you've got and then what became 12.
01:12:09 12. i think it was 12.7 11.8 here that specifically no doubt we'll discuss picked up the issue of insulation and filler material
01:12:20 issue of insulation and filler material so
01:12:22 so again it's very forgiving so it's quite difficult without it in front of me this whole suite in what became section 12 was revised and from recollection reorganized as well in
01:12:35 from recollection reorganized as well in terms of
01:12:36 terms of how it flowed and how it covered external walls coming back to my question
01:12:46 does it work like this this draft pre-consultation with its amendments you agree would have had the effect of requiring all materials in an external
01:12:58 requiring all materials in an external wall built up over 80 meters to be of limited combustibility but that was too much
01:13:06 too much or too blunt an instrument and too much of a requirement too restrictive because you wanted to preserve the uses of timber frame buildings and possibly paper-faced cementitious parts particle
01:13:18 paper-faced cementitious parts particle board
01:13:20 board and perhaps other products so we're looking for something less than a
01:13:27 than a such a restriction yes and did that intention did that governmental intention ever change one way or the other between january 2005 and the eventual
01:13:41 between january 2005 and the eventual publication of the 2006 amendments to approve document b in april 2007
01:13:56 forgive me so from recollection we
01:14:01 we we strengthened what is here 11.7 which is the overriding consideration piece to include think about all combustible materials
01:14:13 combustible materials but in terms of the
01:14:15 the you know that's that is the overarching warning in control but for specific pieces in 11.8 here that
01:14:24 that became
01:14:26 became um
01:14:27 um installation material and fillers in the 2006 approved document b but as i say
01:14:35 say um from the point of view you're referring to government this was a draft being developed to go into a draft for public consultation to then respond
01:14:48 as part of that i'm sorry to nag but i i i'm not quite happy with now i can i'm after is a fact and we have your evidence about the fact
01:15:00 and we have your evidence about the fact of the government's intentions at this stage and you we've got that what i'm asking you is as a fact did the government's intentions change
01:15:10 change between january 2005 and
01:15:14 and april 2007 when the 2006 amendments were published there was something changing in tension by virtue of the changes ultimately made in the 2006 approved document well um
01:15:27 in the 2006 approved document well um the changes in the 2006 document might reflect the changes in intention but i'm not but but what i'm after is what was the change in intention
01:15:38 the change in intention the intention on this occasion was just very specifically capture materials that were being used in a way that perhaps they weren't originally intended
01:15:49 perhaps they weren't originally intended for and so we were trying to specifically and definitively capture in the case of 18 meters or above thermal insulation and filler type material
01:16:00 material right let me try one more time when this was eventually published and it wasn't in this form was it government's intention to require all or all significant elements of the external wool build up over 18 meters
01:16:12 wool build up over 18 meters to be of limited combustibility not always no not always no right
01:16:21 right and the not always is would be is this right timber paper-faced products those sorts of materials yes and what else laminated
01:16:32 laminated glass skirting boards it would the words as given here are uh it would capture an awful lot of materials
01:16:42 materials and that would have been enough to raise concerns that that is not the intention to do that for all materials in this way for all situations above 18 meters
01:16:53 for all situations above 18 meters mr bird thank you very much is this a convenient moment yes i think it is we'll have a break now mr bird we'll come back at 25 to 12 please again don't talk to anyone about your
01:17:04 again don't talk to anyone about your evidence when you're out of the room thank you sir all right
01:17:13 thank you 25 to 12 please
01:35:08 would you ask mr bird to come back in please
01:35:17 [Applause]
01:35:22 all right mr third yes sir thank you yes mr miller yes thank you mr chairman mr bear can i just go back to the investigation of real far's report and page 76 where we looked at the edge fire that the reference to that is clg
01:35:33 fire that the reference to that is clg three zeros one nine four five five page seventy six uh and uh if you look at the last paragraph on that page we looked at it together yes um and the third line
01:35:45 together yes um and the third line however the fact that the fire burns so readily through the core of this type of sandwich panel means that even if the construction complied with current guidance the rapid fire spread through the panels themselves would not be
01:35:56 the panels themselves would not be restricted now um we can see from the email that i showed you of the 18th of january two weeks later
01:36:07 18th of january two weeks later that there's no reference or hint in that correspondence that either you or brian martin or the bre thought that um this type of sandwich panel clearly didn't comply
01:36:19 didn't comply that we don't see that in the correspondence do we in terms of the correspondence the report here yes no no um
01:36:27 no no um and that is what led therefore to concerns that adb might need to be changed isn't it yes yes
01:36:35 yes yes but similarly nor do we see any any reference in the correspondence to the fact that
01:36:41 fact that the the builder um had overlooked in some way the second sentence of 13.7 the what one might call the warning that even though the external surface complied with
01:36:52 the external surface complied with diagram 40 it might not necessarily be good enough to meet the functional requirement my question is did this report on the edge fun not lead you to think or perhaps to question your previous
01:37:04 or perhaps to question your previous assumptions that the warning contained in the second sentence of 13.7 to the effect that even though it complies it might not meet the functional requirements
01:37:15 functional requirements wasn't getting through to industry i i can't claim that i thought that at this time right well sorry to interrupt but did you wonder how how could it be then that
01:37:27 wonder how how could it be then that these panels have been placed on the outside of this building because
01:37:31 because from your point of view something had gone badly wrong yes yeah that that's that's a fair comment sir
01:37:38 sir um it
01:37:39 um it would have been a surprise that this was happening and um in terms of the reference to the last sentence talking about what may lay beneath a class not material
01:37:50 class not material again
01:37:52 again the concern being that the overarching provision within the approved document be is to think about all materials in terms of combustible materials and what that might lead to
01:38:04 what that might lead to it was it would have been a surprise to me that this was happening but
01:38:10 but again
01:38:11 again from recollection some aspects of this product was it wasn't being used for thermal insulation purposes it was a detailing issue from recollection
01:38:24 detailing issue from recollection as well that would have been discussed and therefore there could have been people thinking it's not being used for the purposes of installation it's actually for a decorative finish
01:38:35 decorative finish and therefore that would have come out i'm sure in the discussion that ultimately followed from brian's email but with receptive that doesn't touch the point does it because your point is that there is a sufficient
01:38:47 your point is that there is a sufficient warning
01:38:48 warning of the need to check everything against the functional requirement this
01:38:54 this builder yes or whoever specified these panels
01:38:58 panels appears not to have done that or if he did it he didn't understand the warning clearly enough did that not concern you that others might also not understand the warning clearly enough
01:39:09 the warning clearly enough um i can't recall at the time but it would have been a point that i would have thought through i'm sure and ultimately led into the discussion that we had a few days later
01:39:21 few days later in terms of what more we could do in the approved document be which was instigated by brian's email but yes sir all right thank you very much yes mr miller
01:39:31 miller yes can we then turn to
01:39:35 to the consultation and
01:39:38 and first look please at clg three zero is one three six seven one
01:39:47 now um this is a ministerial submission from you mr bird date dated the 24th of may 2005 to yvette cooper who was then
01:39:58 may 2005 to yvette cooper who was then the minister for housing yes yes if we go to paragraph one you can see that uh you seek approval to publish the consultation on part b
01:40:09 part b and paragraph two you can see the recommendation you agree to the publication in bold you say as soon as possible of the part b adb consultation
01:40:20 possible of the part b adb consultation package
01:40:21 package and then under three you can see uh timing urgent the published commitment is to launch the consultation in spring 2005.
01:40:32 the consultation in spring 2005. and what has made it urgent um
01:40:37 um potentially the enormity of the task at hand
01:40:41 hand um you typically work to a time scale with an approved document where
01:40:47 where you were bound by in effect the regulation publication dates of the months of april and october and wherever possible
01:40:56 possible one would try and give as much time to the marketplace on publication of the finalized approved document to aid dissemination and understanding and so i
01:41:07 and so i envisaged that given the size of this consultation and it was a full review in addition this was the first time we had broken the approved document down into two component parts dwellings and
01:41:20 into two component parts dwellings and buildings other than dwellings and just the shif and just the sheer time it had taken to get this far can we look at page two please paragraph eleven
01:41:33 under consideration yes yes um you say or it says also the potential impacts of not consulting on the proposals for tall buildings at this
01:41:44 the proposals for tall buildings at this stage even as minded to could be significant and then if you look through the bullet points you can see increased pressure from fire and rescue service and fire brigades union
01:41:55 brigades union a probable small number of fire deaths which could nevertheless have been avoided and then third severe criticism of government if significant public deaths or losses
01:42:08 if significant public deaths or losses occur which could have been mitigated by the measures proposed now with those concerns uh and the need for urgency a consequence of the fire at the edge
01:42:20 a consequence of the fire at the edge no they were not from recollection this was in relation to the work following 911 in new york where a sizeable package of work was undertaken looking at the
01:42:31 of work was undertaken looking at the physiological capabilities of firefighters in tall and deep buildings and as part of this particular review of part b
01:42:41 part b there were provisions developed off the back of
01:42:45 back of real fire experiences and fire research to see what additional facilities and provisions we needed to provide the fire brigades for when i'm engaging in search and rescue
01:42:57 search and rescue and that's why when all the consultation package was published all of the supporting research reports under the auspices of the billing disaster reception group were also published
01:43:10 were also published now can we turn to adb 2006 itself this is a clg one six zero seven please
01:43:23 now there we have the first page 2006 edition as you can see coming into effect april 2007. yes yes and if we go please in it to page 96
01:43:37 we see at the heading insulation materials stroke products 12.7 in a building with a story 18 meters or more above ground level any insulation product filler
01:43:48 level any insulation product filler material not including gaskets sealants and similar etc used in the external wall construction should be of limited combustibility see appendix a this restriction does not apply to masonry cavity wall construction which complies
01:44:00 cavity wall construction which complies with diagram 40 in section 9. now can we take it that you are familiar with this paragraph yes can we agree that one of the amendments to it um
01:44:10 um it was the addition to the text as against the 2000 and 2002 editions was the introduction of the wording in that paragraph filler material
01:44:21 that paragraph filler material brackets not including gaskets comma sealants and similar close brackets etc yes
01:44:29 yes can we also agree that the previous wording that that restriction applied to applied to insulation material used in ventilated cavities in the
01:44:40 used in ventilated cavities in the external wall construction yes yes and the reference to ventilated cavities in was removed yes yes
01:44:51 um now i think it might be helpful to put up at the same time so everybody else can see what we're talking about the 2002 version of the equivalent of this paragraph 13.7
01:45:03 of the equivalent of this paragraph 13.7 that's clg140740
01:45:07 at page 89.
01:45:22 and you can see the changes can't you if you look at page
01:45:28 page 89 is where section 13 begins and if we turn to page 90 we can see the rest of 13
01:45:37 and the provision relating to insulation materials you'll you will find under 13.7 under the heading external wall construction in the second paragraph there yes yes so you can see the differences
01:45:49 differences uh originally it had no heading of its own it was called it said insulation material used in ventilated cavities in the external wall construction should whereas in the 2006 version it said it
01:46:01 whereas in the 2006 version it said it had its own heading and its own sub-paragraph the heading was insulation material straight products and it now referred to any insulation product filler material not including gasket sealants and similar etc used in the
01:46:13 sealants and similar etc used in the external wall construction yes yes so those are those are the changes now i want to explore next the origin of those changes with you and what you understood them to mean at the time we've seen the brian martin email on the
01:46:25 we've seen the brian martin email on the 18th of january 2005 suggesting that um 13.7 as it was should be clarified and he proposed in his draft as we've seen to delete the three words ventilated cavities in yes yes
01:46:37 words ventilated cavities in yes yes we've covered that now let's go then to clg uh
01:46:41 clg uh six zeros 22 please this is the draft of the 2006 edition of approved document b
01:46:50 as it was sent out for consultation and you can see that from the first page because it says the proposed new edition yes yes yes and it's dated july 2005 and
01:47:02 yes yes yes and it's dated july 2005 and it comes from the odpm correct correct um if we scroll gently through pages three four and five and start at page three
01:47:14 and start at page three uh
01:47:14 uh that's b1 and you can see the amendment's in blue can't you yes uh page four
01:47:21 page four we continue b2
01:47:24 b2 b3
01:47:25 b3 some changes there this is just to the index page five if we go to that b4 external fast bread uh various different section numbers have changed yes yes portal frames has
01:47:38 have changed yes yes portal frames has disappeared and so um we can we can see the changes in
01:47:44 in blue and a new gray and text i think correct correct uh
01:47:50 uh for example if we go back to page three so that people looking at this document can understand it if you go to page three
01:47:56 three um you can see there under section three flats and masonettes has been deleted and instead you can see the word apartments in its place yes yes now let's go to page 147.
01:48:12 now that is the heading external wall construction the numbering has changed it's no longer 13.7 it's 11.6 and
01:48:22 and you can see that it has a heading external wall construction
01:48:29 and in the paragraph immediately below which is the second paragraph on the page
01:48:34 page the warning in 11.6
01:48:38 in 11.6 is
01:48:39 is that the use of combustible materials for cladding framework or of combustible thermal insulation as an overclouding or ventilated cavities may present such a risk in tall buildings even though the
01:48:50 risk in tall buildings even though the provisions for external surfaces in diagram
01:48:53 diagram 30
01:48:55 30 may have been satisfied yes yes
01:48:59 yes yes so that consultation document retained that
01:49:03 that uh qualification if you like yes yes let's then look at the fourth paragraph on the page which starts uh in a bit under under 11.7
01:49:15 uh in a bit under under 11.7 as it was then proposed that reads in a building with a story 18 meters or more above ground level insulation material used in the external wall construction
01:49:27 wall construction should be of limited combustibility yes yes
01:49:32 yes yes and we can see there that the words in ventilated cavities had been removed yes but there were no other changes proposed to that section of the guidance
01:49:43 of the guidance no
01:49:47 looking at therefore what went out to consultation that shows doesn't it that the government was intending to require all
01:49:58 to require all material used in the external construction as it says to be of limited combustibility without exception sorry sir could you ask that question again that shows doesn't it that what
01:50:09 again that shows doesn't it that what went out to a consultation was a text which
01:50:16 which had no exceptions
01:50:20 but required all material used in the external wall construction sorry to be of limited combustibility if i'm looking at 11.7 in a building with a story 18 meters or more above
01:50:31 with a story 18 meters or more above ground level yes insulation material used in the external wall construction should be of limited combustibility it's only referring to insulation material all right
01:50:44 so
01:50:46 does that tell us well let me try it differently does that preserve the intentions of government as you described before the break
01:50:57 as you described before the break not to
01:50:59 not to have a new scheme which required that all materials used in the external wall construction should be should be materials of limited combustibility
01:51:10 in other words only insulation i suggest not and
01:51:17 and this is something we undertook i believe on thursday is that
01:51:22 is that in terms of the functional requirements and the performance statements you have to read the full provision and therefore by virtue of what was extant in 11.6
01:51:34 extant in 11.6 the external envelope of a building should not provide a medium for fire spread if it is likely to be a risk to health or safety it then goes on about the use of certain situations and then it talks about
01:51:45 situations and then it talks about the reference to diagram 14 performances that's the overarching sort of health warning that when using the approved document in this way you need to think about it yes that
01:51:56 way you need to think about it yes that and that unlocks a consideration by a competent designer and a competent building control body to go okay we need to think about potential risks what then followed is what
01:52:07 what then followed is what typically
01:52:09 typically we're looking at all insulation now but don't forget you do need to refer back in case if the designer starts to use products that he or she thinks
01:52:20 use products that he or she thinks oh that that's something that might suit me
01:52:23 me not really caught by insulation but does it provide a medium for risk and spread and that would unlock as we discussed on thursday the discussion with building control
01:52:35 now this
01:52:38 this document
01:52:39 document as you i think you've confirmed went out to consultation some seven months or so after the edge fire and some seven months minus two weeks or so
01:52:50 so after the discussion that you would see we've seen by email yes uh about what that meant for adb yes yes
01:53:03 can you point out what it is in 11.7 or 11.6 and 11.7 taken together which would address the concern
01:53:14 concern or problem that the edge fire had revealed
01:53:20 by virtue of 11.7 not just referring to ventilated cavities
01:53:28 it was all insulation so the intention was
01:53:32 was whatever its purpose all in insulation and we wanted to test that from recollection in consultation to see if that sufficiently answered
01:53:43 that sufficiently answered the
01:53:44 the the need
01:53:45 the need and the point of concern
01:53:50 so you thought did you that the simple expedient of deleting the words ventilated cavities in taken together with the general warning in 11.6 would address the edge
01:54:01 11.6 would address the edge problem
01:54:03 problem from recollection yes
01:54:08 although of course as i think you said to the chairman before uh
01:54:13 uh after the break the problem with the edge fire was that designers some designers weren't
01:54:19 weren't receiving the message which was intended to be imparted to them by that second sentence in what is at this stage 11.6 yes yes so how did that compute
01:54:31 so how did that compute again from from recollection we held a
01:54:34 we held a discussion and we wanted to go out and test this
01:54:38 test this and put it out for public consultation to see what further comments came back from recollection and that's what we undertook right do we take it from that and perhaps the
01:54:49 do we take it from that and perhaps the process more generally that that in putting something out to consultation that represents government's most up-to-date thinking on what the document being
01:55:00 thinking on what the document being consulted on should look like subject to the consultation subject consultation yeah yeah yes now the wording we've just been looking at
01:55:09 at in the eventually published version filler material not including brackets etc was not in the published consultation draft was it no it was not um
01:55:19 um now you address how the word filler came to be introduced into this document in your statement and let's have it up it's at your
01:55:30 and let's have it up it's at your statement clg three zero is one nine four six one page twelve in three paragraphs paragraphs 29 to 31 and i'm not going to read them all out to you but if we need to look at it we can just to refresh your memory of what
01:55:42 can just to refresh your memory of what you've told us there yeah but am i right in thinking that in effect you say that the nhbc raised the issue in consultation that's paragraph 29 the bre had reported in the real files
01:55:54 the bre had reported in the real files report on the edge and then you um consulted with brian martin following which the addition uh
01:56:03 uh of the words filler material not including gasket sealants and similar et cetera was added from recollection yes yes now let's look at the nhb c response
01:56:14 c response well well let me show you power 29 first you say this um
01:56:19 uh you set it out uh following the public consultation in july 2005 we received a response from a console t at the nhbc who suggested that and here's the quotation clarification is
01:56:32 here's the quotation clarification is required
01:56:33 required within clause 11.8 the predecessor clause to power 12.7 on the 2006 edition of adb
01:56:40 of adb as to whether insulation material includes sandwich panel core material whilst the removal of reference to ventilated cavities is helpful currently there is confusion as to whether metal cladding panels that
01:56:52 as to whether metal cladding panels that use polystyrene as a filler can be used on buildings over 18 meters in height typically these panels are faced both sides by aluminium and as such may be considered by designers to be
01:57:03 considered by designers to be non-combustible
01:57:07 now i'll show you that let's look at the nhbc response that's at clg402410
01:57:17 this is i think the document you're quoting from there's the first page and if we go to page 26
01:57:29 uh take take from me that the from the first page there's a deadline for return of this which was at the 8th of november okay
01:57:37 okay sorry 18th of november okay and this is a november 2005 document take that from me now their response is here on this page let's go to the bottom of page 26 and you can see
01:57:48 and you can see in
01:57:52 in uh shading there that's about closers
01:58:04 uh i'm so sorry i think i really want page 24.
01:58:09 page 24. that's right page 24 uh under any other issues clause 11.8 clarification is required and you can see the text there yes which is
01:58:20 see the text there yes which is essentially quoted in your in your statement yeah now that suggests doesn't it not only that there was confusion as to whether these sorts of sandwich panels were permissible
01:58:32 permissible but also that there was a belief held by some designers out there that metal-faced cladding was itself non-combustible yes by virtue of the response here yes yes
01:58:43 response here yes yes the inclusion of the word filler just didn't wouldn't resolve the problem of manufacturers and designers not understanding what type of cladding panels were permissible would it
01:58:55 from the discussion that took part
01:59:00 took part between brian and i i think what we took from this point was that
01:59:07 that just even given the provision in terms of it should be non-combustible or limited combustibility there is concerns that because of how it is
01:59:19 because of how it is a panelised system in this case that it could be perceived as non-combustible and therefore what we were trying to do by virtue of paragraph 12.7 and adding the words filler is to
01:59:31 12.7 and adding the words filler is to again
01:59:32 again try and address the point that you need to think about what might be filled within such a panel system and don't just think about it it's it's
01:59:43 and don't just think about it it's it's it's insulation and it's the filler material within in this case the panel system
01:59:50 system so it was the discussion was trying to address this and provide further insight to make sure hopefully to make sure that people think about
02:00:01 think about this type of installation
02:00:06 was this the first time you became aware that there was this confusion out there which confusion sir confusion as to whether metal cladding panels that use polystyrene as a filler can be used on buildings over 18 meters in height
02:00:18 buildings over 18 meters in height well that
02:00:20 well that sort of relates back to the edge fire as well i see so yes that was the first time but this confirmed it did it's not confirmed to you that there was a wider problem
02:00:30 problem it confirmed that an example here that there could be this issue and that we need to address within the approved document
02:00:40 now let's see
02:00:44 how this goes did you not see that there was a risk that designers manufacturers and in others perhaps building control officers regarding the
02:00:56 building control officers regarding the cladding panel itself as being judged solely on its outer face and not by reference to its core when it comes to reaction to fire um
02:01:07 comes to reaction to fire um this is coming from the nhbc so they're building control so and the biggest building control body in the country so the fact that they had picked this up is is a good thing and so that wouldn't have been happening on their sites
02:01:20 have been happening on their sites i
02:01:21 i from
02:01:22 from from the comments that we received that again would have been discussed it was shown that there is this potential and therefore it was imperative that we did
02:01:33 it was imperative that we did place
02:01:34 place um revised guidance within the approved document to try and better articulate that
02:01:42 that they are a material that needs to be considered whether they're in insulation material
02:01:47 material and being used for installation purposes or not and that that was the intent of adding in
02:01:54 adding in the term filler now let's see if we can identify with more specifically how the word filler came into the text here's the november 2005 consultation
02:02:06 here's the november 2005 consultation response from the nhbc yes let's then go to clg one triple zero two zero eight two
02:02:20 this is draft
02:02:23 draft approved document b and if you look at the top right hand corner you can see it says draft 22nd november 06. yes and i think the 15 it means version 15 does it
02:02:34 think the 15 it means version 15 does it i i can't recall right well that would that be the normal system i would have thought yeah um
02:02:41 um so it's about a year after the nhbc response
02:02:44 response if we go to page one two eight
02:02:52 uh that is where section twelve starts construction of external walls yes yes and if you turn to one two nine
02:03:02 uh you see there the heading external wall construction 12.5
02:03:09 12.5 external surfaces has is a heading of 12.6 12.7
02:03:15 12.7 is insulation materials yes and then cavity barriers is the heading for 12.8 and 12.9 yes now there's been a significant reorganization of adb this
02:03:26 significant reorganization of adb this part of adb yeah close consultation yes yes yes
02:03:32 and now we see in 12.5 the external envelope of a building should not provide a medium for fire spread if it's likely to be a risk to health and safety the use of combustible materials in the cladding system and
02:03:44 materials in the cladding system and extensive cavities may present such a risk in tall buildings yes that was a change sir that was a change certainly because it referred to
02:03:55 referred to the use of all combustible materials to again the health and safety the the warning provision think about all combustible materials in the cutting system and that would have yeah so that and
02:04:07 and that would have yeah so that and that replaced the references to cladding framework
02:04:10 framework and
02:04:12 and insulating panels i think from recollection so that was again just trying to make it clearer to the reader that
02:04:20 that the overarching provision is that the envelope of a building should not provide a medium for fire spread if it's going to be a risk to health and safety therefore
02:04:31 therefore consider all combustible materials in the cladding system and extensive cavities may present such a risk in tall buildings
02:04:42 well let's compare it to the 2000 edition which didn't change in the 2002 um clg one
02:04:51 clg one five zeros one two please page 96
02:04:57 let's have both on the screen at the same time i'm so sorry if we can do that so keep this this version up if we can
02:05:07 draft 15 and let's have what it was being amended from the 2000 version or the 2002 version of the same in this particular for this particular
02:05:19 in this particular for this particular purpose
02:05:20 purpose clg one
02:05:22 clg one five zeroes one two please page ninety six
02:05:32 yeah uh
02:05:49 i think you're going to need to go back to page nine let's try 94. sorry let's try 90. sorry let's try page 90.
02:06:00 90. yes and then go back a page to 89.
02:06:04 yes thank you very much so 13.7 under external wall construction we can see the now familiar second sentence there yes yes but could i just point out that in addition to changes which we'll no doubt
02:06:16 addition to changes which we'll no doubt talk through so the actual flow of of the guidance has changed as well so rather than just entering the guidance in the way you would read it and only looking at external surfaces
02:06:27 it and only looking at external surfaces and and the point that you raised um in discussion i believe last thursday about people might just dip into the approved document and just look at external surfaces and that's them covered
02:06:39 covered what we actually undertook in well certainly in this version here on the left was to actually talk about external wall construction in the round and provide the general guidance there in and then cover off external surfaces
02:06:52 in and then cover off external surfaces and then provision well let's just take it in i don't think i asked a question but let's just take it in stages now we've actually got the right documents here in front of us um first of all as you rightly say the structure of this part of
02:07:03 structure of this part of yes of the guidance has changed it's been reversed hasn't it you start with external wall construction yes within which you find references to two things external surfaces and insulation materials yes yes
02:07:15 materials yes yes um
02:07:16 um we looking at the the warning sentence in 13.7 which previously existed under external wall construction under 13.7 that's been moved now isn't it to 12.5 yes yes but let's just compare them the
02:07:29 yes yes but let's just compare them the 2000 version says i'll read it again for everyone's benefit the use of combustible materials for cladding framework or of combustible thermal insulation as an overclouding or in ventilated cavities may present such a
02:07:40 ventilated cavities may present such a risk in tall buildings even though the provisions for external surfaces in diagram 40 may have been satisfied 12.5
02:07:48 12.5 now says in its draft form admittedly but it doesn't change or at least not materially the external envelope of a building should not provide a medium for fire spread if it is likely to be a risk to health and safety yes yes
02:08:02 to health and safety yes yes statement of the obvious isn't it you would like to think so yeah the use but the use of combustible materials in the cladding system and extensive cavities may present such a risk in tall
02:08:13 cavities may present such a risk in tall buildings
02:08:14 buildings where do we see in that new formulation the warning that even though you have satisfied the particular requirements of the linear guidance the linear route to
02:08:26 linear guidance the linear route to compliance provided by diagram 40 nonetheless you may not meet the functional requirement where do we see that
02:08:38 it was it was it was removed yes why i can't recall but from
02:08:48 recollection the discussion that led to the development of this revised
02:08:55 revised flow of information within the approved document
02:09:01 may well have amounted to because we were now talking about the external wall construction in the round and we actually placed the health and safety overarching um reference at the start of the
02:09:14 um reference at the start of the narrative
02:09:15 narrative and because we were being quite clear that the use of combustible materials in the cladding system and extensive cavities may present such a risk upfront
02:09:26 upfront from recollection perhaps this precluded the need
02:09:30 the need for the paragraph referring back to diagram 40.
02:09:40 that's that first and second sentence of paragraph 12.5 dilutes the warning previously contained in the second sentence of paragraph 13.7 out of all existence doesn't it
02:09:51 existence doesn't it the intention of 12.5 and it's it's its extension to include all materials i think was an attempt to say think about everything whereas
02:10:03 think about everything whereas within the second sentence second sentence of 13.7 it then deep dives into the use of combustible materials for the cladding framework or of combustible thermal insulation is an overcladding
02:10:15 insulation is an overcladding and therefore and i can't recall the discussions but i think
02:10:21 think it would have been considered that because we included a reference to think about all combustible materials in the cladding system and extensive cavities may present a risk
02:10:32 may present a risk then
02:10:33 then that was felt suitably direct and clear for the purposes of the revised guidance why did you remove the reference to diagram 40
02:10:46 i can't recall specifically but i think it was part of the consideration of development of
02:10:54 the paragraph given what your evidence should told us over the last two days namely the importance of this general warning in the second sentence of paragraph 13.7
02:11:07 in the second sentence of paragraph 13.7 as it had become in 2000 yes 12.7 from 1992
02:11:15 and given the lack of understanding that the edge fire had demonstrated to you out there in the market why wasn't it essential
02:11:26 why wasn't it essential to pres not only to preserve that warning to be met but to make it even clearer
02:11:31 clearer that if you have a class naught external panel in your hands you
02:11:36 you cannot be sure that you have satisfied the functional requirement
02:11:42 again i can i can only think back to the discussions that would have led to this new revised draft that there was consideration given that this
02:11:54 there was consideration given that this provided what was needed in terms of guidance to support external wall construction more generally how does the second sentence specifically
02:12:05 does the second sentence specifically you could take the first sentence as its as its background how does that second sentence specifically tell you that even though you may have satisfied the linear root of compliance either
02:12:17 the linear root of compliance either through meeting diagram 40 or through a full-scale test nonetheless you need
02:12:27 you need to
02:12:29 to do a safety check against the functional requirement every time where does it tell you that
02:12:37 in terms of sorry sir can you repeat the question
02:12:42 i'll try it more simply what is it in the in 12.5 that tells you that even though you may have satisfied the linear route to compliance using diagram 40
02:12:53 using diagram 40 or
02:12:54 or 12.7 as it became nonetheless you need to make sure that you've satisfied the functional requirement because mere satisfaction of diagram 40 doesn't get you there
02:13:06 diagram 40 doesn't get you there again from my understanding in terms of the use of the document you will always have the functional requirement and the specific performance statement
02:13:17 performance statement within mind and so by virtue of the overarching health and safety paragraph 12.5
02:13:24 12.5 there is the warning to think about all combustible materials in the cladding system need to be considered yes but telling people to think about all
02:13:33 all combustible materials in the cladding system simply tells them um that they've got either to comply with the linear route to compliance uh which is 12.6 or 12.7 or a full-scale
02:13:44 which is 12.6 or 12.7 or a full-scale test there's nothing there to say that even if they do that it still it might not meet this functional requirements is it
02:13:54 is it is there
02:13:56 is there i would
02:13:57 i would i still suggest that you need to think about any combustible materials in that wall environment and that's what 12.5 is attempting to achieve but this is
02:14:09 attempting to achieve but this is guidance isn't it mr bird it is statutory guide and so telling people to think about something as general as the dangers presented by combustible materials is going to provoke an answer in a designer well i know about that how
02:14:21 in a designer well i know about that how do i comply and then you look in and you see how you comply isn't that what the point of the guidance was it is otherwise what's the point no no i agree it is yeah and therefore you're all important your
02:14:33 therefore you're all important your sheet anchor all important sheet anchor of the second sentence of 12 13.7 that used to tell you that satisfying diagram 40 might well not have been enough because you need to go and check it against the
02:14:44 need to go and check it against the particular height use and position of the building is gone yes
02:14:49 yes i can see how that might be considered but you would always have to revert back to the functional requirements but this doesn't tell you that you should but you but you for meeting the building
02:15:00 but you for meeting the building regulations you always need to meet the functional requirements the effect of this isn't it is to say
02:15:09 is to say putting oneself in the position of a cladding subcontractor for example uh the use of combustible materials in the cladding system and extensive cavities may present such a risk in tall buildings
02:15:19 buildings i know that right what am i allowed to do okay 12.6 external services of all should meet the provisions in diagram 40. yes here is my panel it's got class
02:15:31 40. yes here is my panel it's got class naught i've met the provisions in diagram 40. can i use it you then carry on and read where relevant the guidance in 12.7 where it talks about
02:15:42 where it talks about insulation material and then subsequent to this updated and filler material you would have to flow through the guidance that would then take you through your
02:15:53 that would then take you through your consideration of all of the external walking yeah we'll come back to filler in a moment whether or not it does catch the core i'm not on that point i'm just asking you to explain to me how an ordinary user of this document would
02:16:05 ordinary user of this document would understand that satisfaction of diagram 40 isn't necessarily enough by virtue of what you have to achieve in the
02:16:16 what you have to achieve in the functional and similar i understand in terms of levels of competence and understanding but again it's not a single root of a designer
02:16:26 designer or a builder in this case going i've met that that's all i've got to do from their reading i'd suggest you need to carry on but with the interaction of building control
02:16:37 with the interaction of building control as well
02:16:38 as well which would be the checking of a building control application because this is notifiable building work that between them they would ensure that they cover that what they were undertaking would ultimately show
02:16:49 undertaking would ultimately show compliance with the building regulations mr bird isn't there an unhappy tension built into this whole set of guidance you you are using the guidance
02:17:00 guidance to tell people how they can expect to comply with the functional requirements for the more common situations all right but the overriding
02:17:11 but the overriding point that you say is to be obtained from the guidance is you've got to look at the functional requirement in other words
02:17:18 words it's effectively putting into the guidance a statement that says even if you comply with the guidance you may not have complied with the functional requirements and that's not really what the guidance is
02:17:30 really what the guidance is there to do is it it
02:17:34 as we've already discussed and forgive me from i'm julia repeating myself the guidance is there for some of the more common situations it is not deemed to satisfy
02:17:46 situations it is not deemed to satisfy and therefore by virtue of following it you may show compliance and it does say that in the approved documents and therefore wanting to be helpful
02:17:58 wanting to be helpful this guidance is offered in in that spirit
02:18:01 spirit but there is still and as i was taught as building control just following the adb is not necessarily enough that's not to say that's not how some people have now
02:18:12 that's not how some people have now started to perceive that you i would always revert if there was a question
02:18:18 question to the functional requirements for any part of the party or any part of the building regulations because the status of the approved documents are exactly that they are statutory guidance for the more common
02:18:29 statutory guidance for the more common situations but if followed ten may not show compliance so in a performance-based system there's always that expectation that that should happen sir
02:18:40 that should happen sir i just wonder whether it would be more helpful to the people who are trying to use this
02:18:46 use this to state in absolutely explicit terms that even if you follow this guidance you may not get home it
02:18:55 it from recollection forgive me so is that not said at the front of the approved document
02:19:02 but i believe something along those lines
02:19:05 lines are broadly there sir all right thank you yes well
02:19:09 well i invite you to come back to my question
02:19:15 which is do you accept that the
02:19:21 that the uh
02:19:23 do you accept that the intention underlying the second sentence of what was 13.7
02:19:32 was diluted out of all existence and replaced by a much more general and willier statement in the second sentence of para 12.5
02:19:43 12.5 i don't believe that was the intention sir but if that's how it is now being read then
02:19:50 i'll have to you know from your perspective from what you're saying then i can see why that might be the case and in a bid to make perhaps makes this perhaps more accessible and to simplify it
02:20:02 and to simplify it uh you made a generic statement which completely removes the thrust of the important warning contained in that second sentence in what was 13.7
02:20:13 what was 13.7 that wasn't the intention but it was the effect wasn't it do you accept that
02:20:20 could we potentially have a look at what became
02:20:23 became in the left hand draft or latest draft diagram 40 please sir uh
02:20:31 sir uh yes i think so we need to um turn the page please
02:20:37 yep page 130.
02:20:46 thank you sir if we could go back to the text let's go back to 129 yes please
02:20:58 then i i could see how that could be considered in that way yes thank you now i'd like to go back if i can to uh filler yes um
02:21:13 can we go to
02:21:15 clg1302070
02:21:27 and now what this is i shall tell you uh is
02:21:32 is the last
02:21:35 the last modification of this document dated to the 22nd of november 2006 in other words the same date as version 15 we've just been looking at take it from
02:21:46 we've just been looking at take it from me that that is the case
02:21:49 have you seen this version before do you think
02:21:55 and i i'll let me let me see if i can assist it's different in respect of 12.7 because it now contains the word insulation product filler material etc
02:22:06 filler material etc okay so as i set out in my witness statement
02:22:11 statement potentially this followed a discussion between myself and brian martin that there was concern that we hadn't suitably addressed the comment recognition from
02:22:24 the comment recognition from the nhbc
02:22:26 the nhbc and
02:22:27 and potentially the edge fire as well and so i think there was
02:22:32 there was what the date of this document sir this is the 22nd of november 2006. so it's a year after yeah so it's quite late in the this is after consultation yes towards it production
02:22:43 towards it production as is as is normal given that the enormity and size of these documents that therefore i envisaged that the discussion that to which i refer in my
02:22:54 discussion that to which i refer in my witness statement with brian about adding the word filler material would have happened and this might be that very text that was developed
02:23:06 that very text that was developed and the word added right
02:23:10 right so around this time 22nd of november 2006. i i remember a discussion with brian the fact that filler wasn't in
02:23:22 the fact that filler wasn't in the version that went out for consultation so it was always going to be
02:23:26 be post consultation yeah but it obviously happened obviously quite late as part of the refinement of the approved documents now um you can see here what's been
02:23:38 now um you can see here what's been added
02:23:39 added uh the words uh well the the title is now insulation materials stroke products yes and what's been added is the words uh
02:23:50 uh filler material etc yes yes this is the first time i think i'm writing asking you that that we see the word filler in any proposed drafting of this text
02:24:02 drafting of this text um
02:24:04 from what you described in the dates yes sir do you remember seeing this document at that time in other words the addition of the word filler material etc but not yet bearing the brackets which
02:24:17 the brackets which exclude certain products
02:24:20 i can't recall i i just say there was
02:24:26 there was a lead
02:24:28 a lead draft which you just showed me draft 15 and therefore this must have been developed
02:24:36 developed what's the date of this document sir uh 22nd of november let's put both up yes um can we have keep this on the screen uh but let's have draft 15 we looked at before clg one triple zero two zero
02:24:49 before clg one triple zero two zero eight two
02:24:58 so yes
02:25:00 yes exactly and in that i think we need to turn to page one two nine
02:25:09 i showed you that yes the version on the uh
02:25:16 uh right hand side bought the date of the 22nd
02:25:19 22nd november 2006 version 15. take it from me
02:25:23 me the the version on the left-hand side we're now looking at which is an uh another amendment bears the same date from the um the metadata i believe i'll correct that that's wrong
02:25:35 correct that that's wrong um but here you see if you compare them um on the right hand side it says insulation materials as a title yes on the left hand side it now says insulation materials stroke products
02:25:48 insulation materials stroke products on the right hand side it says in a building with a story 80 meters or above ground level any insulation material used in the external wall construction etc yes on the left-hand side it now says any insulation product
02:26:01 says any insulation product filler material etc used in the external wall construction do you remember seeing those changes on the left-hand side from the version on the right-hand side at
02:26:12 the version on the right-hand side at the time i believe this one on the left came followed from the discussion that i had with brian martin to which i refer to
02:26:23 refer to in
02:26:24 in my witness statement right
02:26:27 then let's go let's move on we may need to go back to these two documents but let's go to clg one triple zero two one nine six
02:26:52 now this is uh an email run and i'd like to show you the the foot of page one and over to page two um on page one at the bottom there's an
02:27:03 um on page one at the bottom there's an email from somebody called steve bergner yes on friday the 15th of december 2006 to
02:27:10 to uh
02:27:11 uh tempo gdl and john saunders also gdl um and copy to you yes and indeed others uh and
02:27:20 and who is steve bergner he was our interface so he was our intelligent client for typesetting documents
02:27:28 documents and and publication and preaching of documents right and he and the subject is um
02:27:33 is um read first thing on monday 18th please adb
02:27:36 adb as you can see and then if we turn the page after he says hi could you please email a pdf of the dclg approved document b volume 2 through to neil richardson and natalie payne first thing monday morning et
02:27:48 payne first thing monday morning et cetera please copy and ashley bird on this occasion and then he says this the changes made to this document on friday
02:27:55 friday were minimal so this should be straightforward the client however wants a last check rather more changes were made to volume one we've received this safely thanks
02:28:07 one we've received this safely thanks and then if you go up the email chain please to page one
02:28:15 uh we can see an email from you on the 18th of december three days later uh neil just to confirm we are now content with volume two can you please incorporate the front and back covers
02:28:26 incorporate the front and back covers and turn into a form suitable for uploading to the web yes now um let's look then at and this is this is as you see just a month or so after the two documents of the 22nd of
02:28:37 after the two documents of the 22nd of november we've been looking at yes and it approves it for publication if we then look at the version that you approve for publication that is at clg one triple zero
02:28:49 that is at clg one triple zero two two double zero let's have that please and if we turn in it to page 96 we can see the formulation
02:29:00 we can see the formulation uh we are now familiar with that i showed you before insulation materials stroke products yes 12.7 in a building with a story 18 meters or more above ground level any
02:29:12 meters or more above ground level any insulation product filler material and then
02:29:16 and then it says
02:29:18 it says not including gaskets sealants and similar etc used in the external wall construction should be of limited combustibility see appendix a did you
02:29:29 did you discuss
02:29:30 discuss any changes with brian martin or anybody else to this text between the last version that we saw on the 22nd of november which contained the words
02:29:42 of november which contained the words insulation product filler material etc yeah
02:29:45 yeah and you're approving this version for print on the 18th of december 2006 a month or so later i can only presume we did have a discussion and this was further uh
02:29:59 and this was further uh refinement added to the approved document now who did you have that discussion with it would have been brian anybody else
02:30:08 we might have had a discussion within the wider team
02:30:14 anybody outside government
02:30:18 um
02:30:22 i can't recall but it wasn't untypical that we would as we as we get close to publishing an approved document
02:30:33 approved document it becomes quite apparent that it will be subject to refinement and tidying up and that refinement could potentially include issues relating to further assist with interpretation
02:30:47 further assist with interpretation but
02:30:50 i don't know if it had any discussions with people outside of the department but thereafter editions of
02:31:02 editions of drafts were provided and made available to wherever we could the the brac working party so i don't know if anything further went there but i can't recall
02:31:13 further went there but i can't recall sir
02:31:18 do you know of any or whether these changes
02:31:23 produced any new documents
02:31:27 the reason i ask the question is we've not been able to find any documents and nor has the department because we've asked again which show the document trail and the changes from the versions i showed you
02:31:40 changes from the versions i showed you on the 22nd of november right to this to this version the insertion of the words not including gaskets sealants and similar i can only presume therefore it was added as part
02:31:51 presume therefore it was added as part of
02:31:52 of further refinements and and checking and proofreading as it was happening um within the department as part of this process right now were those was that
02:32:04 process right now were those was that edition
02:32:05 edition one of the changes minor changes to which steve bergner referred in his email of the 15th of december friday the 15th of december 2006.
02:32:16 december 2006. i
02:32:17 i i i wouldn't know i can't recall what would have what i say would have functionally physically how would these
02:32:28 functionally physically how would these changes have been made was this brian martin at a computer or scribbling with a burrow or was it you how did those words get in physically into the text it could be any of those mechanisms so they
02:32:41 could be any of those mechanisms so they could as i say we would have discussed something like this
02:32:45 this they would then perhaps be put on a manuscript that were then provided back to
02:32:52 the company that were typesetting or i believe that's the document you showed me
02:32:58 me um
02:33:01 um dated towards the end of november
02:33:05 november where the
02:33:06 where the filler was first used it could have been taken and manipulated on on um on a document a digital document and then also provided back to the typesetter who had control
02:33:18 back to the typesetter who had control of the master
02:33:25 from recollection at times we would all have had the ability to read through the document because
02:33:37 the document because just the importance of getting it correct
02:33:40 correct that there would be one lead typically one lead paper copy and because i typically work in manuscript i would have read through it marked it up tracy cole who was
02:33:53 up tracy cole who was my policy lead on part b sam greenwood potentially working with us and brian but it could have been an amalgam of manuscript
02:34:05 manuscript and there might have been um a submission where if it was easier to just offer some text
02:34:14 some text in a word document one presumes that could have gone in as well was it held in word on a laptop or on a hard drive somewhere or was this held
02:34:25 hard drive somewhere or was this held in some more remote but multiply accessible location like it was typically sent to us so the document would come back from the typesetters volume one and volume two
02:34:36 typesetters volume one and volume two and that would have been available
02:34:39 available i think
02:34:40 i think but
02:34:42 but but but from recollection no because steve bergner used to always walk around with hard paper copies so
02:34:52 i think they would have been marked a manuscript right and who coined the words in brackets who was responsible for coming up with those words for recollection i thought that
02:35:03 for recollection i thought that would have been something discussed in that that meeting to which i refer between brian and myself so adding the words filler um
02:35:14 um those words there as well and
02:35:18 and also the
02:35:19 also the the title
02:35:20 the title adding the words forward slash products so from recollection i think we would have discussed that as
02:35:28 as brian and i i can't remember if anybody else was there in terms of to help further refine and and understand being mindful we'd had the comments from the public consultation from nhbc
02:35:40 the public consultation from nhbc talking about filler and we still would have had at the back of our mind as well the edge fire
02:35:49 do you remember a discussion about narrowing down the scope of the phrase filler material etc narrowing it down to narrowing it down so that it didn't
02:36:00 narrowing it down so that it didn't include things like gaskets and sealants i think we would have discussed that yes do you remember it from recollection i can only remember
02:36:11 from recollection i can only remember filler and the title but i'd envisage that we would have we would have discussed it so does that tell us that there was a perception between you and brian martin at the very least that the phrase filler material etc was too
02:36:23 the phrase filler material etc was too wide
02:36:24 wide and and there were certain things that needed to be excluded from it i think
02:36:30 i think when you make up a construction product or a system there are many component parts and
02:36:38 and like we're trying to do here was actually say our concern in this case would be thermal insulation combustible but also filler type material because you can't perform
02:36:50 because you can't perform and undertake a robust weather with a tight design without using gaskets and sealants similar which are typically combustible in their own right but they are small
02:36:59 are small they're small components that if you if you could say they had to be non-combustible there might not be a limited compatibility there might not be any alternatives you could use
02:37:10 any alternatives you could use right now whose idea was it to insert the word
02:37:14 the word filler or filler material i believe that was from discussions that brian and i had um whose idea was it though was it his or was it your idea
02:37:25 or was it your idea from recollection as part of the refinement of the approved document brianwood and sam greenwood would have been working through
02:37:35 through making sure we've covered all the points raised covered off 240 plus responses etc and made sure that the document had responded
02:37:46 that the document had responded to all aspects of public consultation so again i should imagine brian approached me saying we haven't suitably covered off the filler situation from an hbc
02:38:00 off the filler situation from an hbc and the edge so it might have been brian approaching me and having us having that discussion but the word filler was that did that enter the conversation the discussion
02:38:11 the discussion from
02:38:12 from a report about the report about the edge fire from the bre or the nhbc consultation response from regulation it was used in both it
02:38:23 from regulation it was used in both it was
02:38:25 was it was did was that a was that was the fact that it was used in both
02:38:32 in both did that bear on your thinking on the choice of the word i believe it would have standing back and looking at 12.7 in the version that was sent to press and was published
02:38:44 was sent to press and was published what did you intend 12.7 to mean by including
02:38:48 including the words insulation product filler material not including gasket sealants and similar etc so the intention was we wanted to be provide greater clarity over
02:39:00 provide greater clarity over the control of insulation products generally that's why we stepped away from just referring to
02:39:09 vent insulation in ventilated cavities there must have been concern however that
02:39:17 that again are we sure we're making clear to the reader that there are these other products and
02:39:25 and and actually even just polystyrene products which aren't being utilized for their thermal properties they're being utilized for inclusion in building works for decorative paneling and because they
02:39:36 for decorative paneling and because they weren't there to afford a thermal performance people were thinking they're not controlled because they're not there as an insulation product and so
02:39:46 and so considering as i set out in my witness statement what was being said by the nhbc and you rightly drew to my attention that actually
02:39:58 attention that actually some people don't realize that these materials are controlled
02:40:05 the as i say there was the term filler there but it was still being there used potentially as an insulation product bearing in mind the
02:40:14 the report from the edge fire i believe it was felt that that would be provide greater clarity as to what you'd refer to products that might be utilized in these types of
02:40:27 might be utilized in these types of panels and similar that
02:40:29 that are there
02:40:31 are there for rigidity or similar but you need to consider them did you suggest to brian martin or did he suggest to you that you should
02:40:42 that you should ask you should inquire whether that term was readily understood in the construction industry to have a well-known particular meaning the word filler i can't recall if we had that discussion
02:40:53 that discussion did you take any steps to ensure that the word filler was generally understood in the construction industry in the sense in which you intended it um at this point no
02:41:06 um at this point no i can't i don't believe so but again
02:41:10 but again you know we tend to write approved documents we try to write approved documents in a way that you would use common words that might have a common intention or understanding and therefore a filler in this respect is something
02:41:22 a filler in this respect is something that typically feels so void or similar and therefore it was felt that that would be
02:41:28 would be again from recollection the choice of words we used no doubt the fact it was used by an hbc and
02:41:37 and i think it was referred to in the age of fire
02:41:40 fire would have would have assisted i suppose maybe brought us to that point but more generally when we then rolled out the approved document b from recollection this did form part of
02:41:53 from recollection this did form part of a wider slide on section 12 where we attempted to cover the changes made here and specifically that did include a reference to filler
02:42:04 reference to filler now we haven't seen anywhere here in this document a definition of the word filler given that you didn't consult industry about what commonly might be understood by that word why not
02:42:17 might be understood by that word why not why not define filler with the benefit of hindsight and whilst and while i'm sat here and why i'm sat here now
02:42:25 here now that's a very fair observation sir and where we are we we should have provided some form of um
02:42:34 um description further to just the term filler but at the time
02:42:39 the time what gave you the confidence that the word filler would be so well it understood in the industry in the sense you intended it but it didn't need a definition because i think i believe we felt
02:42:50 believe we felt as as i said a moment ago is that we'll tend to try and use sort of terms whereby
02:42:59 whereby it would naturally be apparent that that is what we're referring to a filler fills a void um
02:43:06 um and therefore it was felt that that was the intention in relation to use of the word in this case but it could also as you say a filler fills a void but
02:43:17 but there are different kinds of filler products or materials such as can spray yes
02:43:23 yes yes i i agree but the but talking about here in terms of insulation materials and products specifically it was felt
02:43:34 it was felt that filler would provide uh sufficient description as to what we were referring to but but i'm sorry sorry i'm sorry no but i
02:43:45 i'm sorry sorry i'm sorry no but i i believe you raised a fair point and with the benefit of hindsight we should have provided a definition you say a filler is something that fills a void
02:43:56 a void um
02:43:57 um but isn't it right that the core of a composite rain screen panel is not a
02:44:04 is not a it's not filling a void is it
02:44:11 in terms of
02:44:14 what because it's formed by bringing together the materials well it's a composite panel as we know comprising uh two sheets of aluminium skin around a polyethylene or
02:44:26 skin around a polyethylene or polyurethane core yes yes yes but the core isn't acting as a filler it's not filling a void between two separate elements it's part of a composite single product isn't it i understand
02:44:37 i understand why you say that but i can only sit here and offer you uh how i can recall the discussion going and what the intention was and categorically filler was
02:44:49 and categorically filler was the term that we utilized for capturing you know those types of materials that could be utilized in a building in this case between
02:45:01 in this case between a panel type material or similar and we thought
02:45:04 thought from recollection that that was the most befitting way to describe it but why put it in
02:45:10 it in a section devoted to what is called insulation materials or products because
02:45:18 because from my perspective as well the intention was to relate to insulation materials and products and i again
02:45:29 and i again and with the benefit of hindsight it perhaps isn't the clearest but the intention wasn't to just talk about insulation because
02:45:40 because and i suppose that's the case as well and
02:45:43 and in relation to to the edge it wasn't it was an insulation material but it wasn't being used for insulation purposes and so
02:45:51 and so the subheading there was an intention that it it would address insulation materials
02:45:57 materials and products what kind of products insulation products or any products potentially any product but i have to be quite clear that you know what was in our mind at the
02:46:08 you know what was in our mind at the time
02:46:09 time was
02:46:11 was from the nhbc and from um
02:46:13 um [Music]
02:46:15 [Music] the edge was polystyrene but there would have been consideration there of ultimately it could be anything that's utilized in a decorative panel in that way
02:46:26 that way which
02:46:27 which could
02:46:28 could actually be a problem if it was combustible and that was why we used the term filler but why do it that way why not say
02:46:35 not say all composite rain screen panels must be composed throughout the materials of limited combustibility
02:46:42 that would have solved it in hindsight sets here i can see how it looks that way yes but what i'm interested in is how you got yourself into such a muddle over this why not just say what you meant rather than
02:46:53 just say what you meant rather than slowly letting this uh gather confusion um and letting it end up in a in a section that on its face appears to be devoted to insulation and of course as i
02:47:04 devoted to insulation and of course as i say i i i respect that the heading could have been better uh afforded but it is a heading there's still there's still the need to read the provision beneath it that is 12.7
02:47:16 provision beneath it that is 12.7 we could have done it in a multitude of ways i i can i can see how that might be the case but the words below it say any insulation product all right filler material yes well that's not that's not
02:47:27 material yes well that's not that's not referring to any insulation product and and any core of any composite rain screen panel regardless of its purpose or regardless of its makeup is it and what the intel well i
02:47:40 makeup is it and what the intel well i can only speak as to the intention behind of what we proposed from that discussion of what we envisaged phillip would be and it would was to be what i've just described
02:47:53 so to be clear your understanding of the words used was that the words filler material not including gasket sealants and similar etc was to
02:48:05 etc was to apply to the core of an external cladding panel yes
02:48:12 of all types potentially yes in all circumstances over 18 meters in indi as described there yes
02:48:23 did you understand the words filler material
02:48:27 material not including gasket sealants and similar et cetera to apply to any other parts of an external wall system in addition to the core of an external padding panel sorry sir can you ask a question again
02:48:38 sorry sir can you ask a question again did you understand those words insulation product filler material not including gasket sealants and similar etc to apply to any other parts of the external wool buildup as well as the core of an external
02:48:51 as well as the core of an external cladding panel it would have primarily have been in relation to the external panel um
02:49:00 um that would have been the the the original intention did you understand did you intend the scope of this new wording to extend to the external surfaces of the cladding panels as well as to the core
02:49:16 sorry so i don't understand its application to the surface sorry are you talking about a product
02:49:23 product on the outside face of a system yes yes you did yes on what basis did you form that view because we were experiencing or the
02:49:34 because we were experiencing or the example we had from the edge fire was that these were on the outside face of the building and around the detailing where again the insulation thermal insulation in this case was
02:49:46 thermal insulation in this case was being used as a stiffener it wasn't there providing its thermal performance for the building envelope
02:49:55 envelope and therefore actually the intention was to capture it using the term filler sorry you may have misunderstood my question sorry i'm talking about the external surface yes did you understand that the provisions
02:50:07 did you understand that the provisions of the 12.7 extended the requirement of limited combustibility not only to the core of a composite external rain screen panel but to its skin also no diagram 40 would still have been
02:50:19 no diagram 40 would still have been relevant that's what i was interested in did you at some stage come to the view that the external surface of cladding panels
02:50:26 panels rather than only the core were caught by 12.7 and should also be of limiting combustibility no right
02:50:33 right so in your mind was it clear from 12.7
02:50:38 from 12.7 that it applied and applied only uh
02:50:43 uh to
02:50:43 to insulation properly so called and to the core of a combustible sorry the the core of a a composite external panel that would be my understanding but not its skin
02:50:55 its skin not its external surface no but that would still be subject to following the guidance for diagram 40. now
02:51:03 now we may come back to that in a moment but we can see as you've told us the word filler wasn't defined and you didn't consult on its meaning why didn't you consult on its meaning
02:51:14 why didn't you consult on its meaning by virtue of we went out to consultation with the draft that you kindly showed us earlier
02:51:22 earlier and by virtue of the nhbc offering its comments
02:51:26 comments and
02:51:27 and further consideration and refinement this was in effect a response to the comments that were received
02:51:36 received given that you told us over the last two days that making changes to the approved documents required a consultation yes why didn't you think that the change to 12.7
02:51:48 that the change to 12.7 to address this particular problem did not also require consultation given that the word filler was one used
02:51:59 the word filler was one used on two occasions only and not and not one that you understood to be generally understood in the market unfortunately um that that would amount to the perfect world but when you're dealing with
02:52:10 world but when you're dealing with somewhat like 300 pages of the two versions of approved document b there's always a degree of refinement to the documents following public consultation if we then
02:52:21 following public consultation if we then had to launch into another public consultation because we'd further refined it um so in response to the consultation i'm not being flippant so it would potentially be in a continual state of
02:52:32 potentially be in a continual state of consultation that i understand um but why not adopt a slightly more limited and pragmatic approach for example go back to the nhbc and say to them thank you for your
02:52:43 and say to them thank you for your consultation response we're most interested in it you use the word filler can you assure us that that word is understood in the industry to cover or denote
02:52:55 or denote the core of a composite rain screen panel we could have done that so why didn't you because where we the discussion that brian and i had
02:53:06 the discussion that brian and i had was that we wanted to best capture these types of materials used in this sort of way
02:53:12 way and we felt from discussion that the term filler captured that and that's why it found its way in to the eventual approved document b notwithstanding as i think you've
02:53:24 notwithstanding as i think you've answered already the title insulation product material stroke products and notwithstanding that the expression immediately follows the word any insulation product notwithstanding the title and as i say
02:53:35 notwithstanding the title and as i say you know i can only apologize for that that
02:53:38 that was not the intention it was to cover insulation materials and products but i'd always suggest that you know it is a subheading and it should have been better than we have before us here but
02:53:50 better than we have before us here but you would always go in and read the provision
02:53:56 how confident are you that both you and brian martin would have considered that this this
02:54:03 this this provision applied to the core of an acm panel
02:54:07 panel when it was inserted as it seems to have been
02:54:10 been in late november or mid-december 20 2006. the the whole point of adding that term was definitively to deal with that situation right
02:54:23 with that situation right was it intended to restrict all material in the external wall
02:54:29 wall to materials of limited combustibility in effect yes but but you know i need to be very clear the original driver came about from the edge fire which was a polystyrene
02:54:41 fire which was a polystyrene and the nhpc referred to a polystyrene as well
02:54:45 as well so that would have been the driver but the intention ultimately would be to think about all such material because if you weren't thinking that
02:54:56 if you weren't thinking that a plastic space insulation was combustible we want to attempt to make sure that you you realize that it should be could relate to any
02:55:07 it should be could relate to any material filler if it wasn't of a material of limited combustibility let me
02:55:15 let me let's see if we can replace there's a long and i think rather complex answer you told us that you by the words by the changes to 12.7 you intended to
02:55:26 by the changes to 12.7 you intended to catch the core of a composite rain screen panel and require that to be of limited combustibility yeah or panels even and also decorative panels as well but yeah yeah all right
02:55:38 panels as well but yeah yeah all right we've got the core point i'm now asking you
02:55:41 you whether it was intended to go further and to restrict all material in the external wall build up including external facings
02:55:52 including external facings to materials of limited combustibility no
02:55:55 no no no so do you say that this was not intended to be a catch-all
02:56:02 cover all materials in the external wall build-up it's not a catch-all right
02:56:11 did you discuss with brian martin at the time
02:56:16 that question in other words whether the external skin external facings of a composite panel above 18 meters
02:56:27 above 18 meters was caught by 12.7 or not i can't recall that we had that discussion
02:56:35 do you recall whether brian martin said anything to lead you to believe at the time that he thought that 12.7
02:56:42 that 12.7 was requiring
02:56:46 not only the core of a composite panel but its external facings as well to be of limited combustibility
02:56:57 i i really can't recall i
02:57:01 can't recall sorry
02:57:10 mr chairman is that a convenient moment yes i think it is thank you very much well mr bird it's time we had another break
02:57:17 break get some lunch this time so we'll stop now we'll resume tease at two o'clock and uh the usual injunction please don't talk to anyone about your evidence when you're out of the room thank you sir
02:57:28 you're out of the room thank you sir thank you very much two o'clock cheers
02:57:52 you