Grenfell Tower Inquiry - Kingspan Evidence - Tuesday 1st December 2020 (2/2)
00:00:08 would you ask dr rocha to come back in please okay
00:00:19 last name
00:00:26 all right dr rochas yes yes carry on yes thank you yes yes thank you yes we were in an email chain relating to the concerns that have been raised by kingspan offside if we
00:00:37 been raised by kingspan offside if we can go back to that
00:00:42 kin403714
00:00:48 and if we can look closely at that email you send at the top of that page there now i'd ask you about that first paragraph but i now want to just look at the second paragraph you say if
00:01:01 look at the second paragraph you say if necessary i suppose we could send old formulation material for the testing if you think this has a better chance and they are pressing but this is undesirable for several reasons
00:01:12 undesirable for several reasons and i'd rather delay and get the new fr product made as soon as hexian can supply material which we are waiting on do you see that there yes i do what were the reasons which would make it
00:01:23 the reasons which would make it undesirable to send old formulation foam to kingspan offsite for their testing
00:01:30 testing i think i covered them earlier it's several reasons i mean originally
00:01:38 um gwyn davis had queried i think the um the performance of the old old material so what it wasn't certain it would it would
00:01:48 would uh work in the in this system uh changing over to uh the old material would mean the whole production line would have to well the whole production line for k-15 at least
00:02:00 whole production line for k-15 at least would have to change over um and therefore if unless uh either was saying that that was definitely the route to go uh i'd i would rather delay for this
00:02:12 uh i'd i would rather delay for this particular fire test sequence get the the new fr product
00:02:18 product yes and was one of those reasons also that it was not the product kingspan were in fact manufacturing and selling at the time i think that follows from what you've just said about you'd have to transfer over the whole at least the
00:02:29 to transfer over the whole at least the whole k15
00:02:32 whole k15 process to the old tech that would that would be extremely burdensome wouldn't it and costly it would be it would be logistically uh just
00:02:42 just quite difficult to do but it would be possible i mean if either was saying uh yes that's the way then then we could have done it can we agree that you're not in this
00:02:53 can we agree that you're not in this email saying to your colleagues i'm really concerned that we're selling something
00:02:59 something that hasn't passed these tests i'm not saying that but again it's it's a system being tested so i i still don't know if it's the system
00:03:10 system that's giving the problem or the product so far as you are aware after this did anyone ever tell kingspan off-site
00:03:18 off-site anything about the fact that the k-15 they had been testing was a different k-15 from the one which with which kingspan had had some success i don't know that i know there were
00:03:29 i don't know that i know there were meetings with off-site i think with aidan wilkinson after this but um i don't think i was involved in them no
00:03:40 you said in your witness statement and we looked at it earlier uh this morning that in your experience kingspan always gave straight and clear advice from which you consider kingspan was respected within the industry
00:03:53 respected within the industry did you think it was giving straight and clear advice to recommend that you said that it was a potentially the problems were in the same batch and might suffer from a similar problem
00:04:04 similar problem back to kingspan offside i think this was
00:04:07 was this was in terms of um
00:04:12 internally uh coming up with a uh a reason to to pause and and say well what's what's up with the with the fire test with this
00:04:23 the with the fire test with this particular uh fire test um and um that that was probably the best way to do it at that time but as i say there were separate discussions with off-site so i
00:04:35 separate discussions with off-site so i don't know what was discussed
00:04:39 can we agree that the only tests that you could rely on at this stage even remotely to support kingspan being used over 18 meters was the 2005
00:04:50 used over 18 meters was the 2005 test that had been done on old technology it was the 2005 test that we were relying on yes i just want to put at this stage i just
00:05:01 i just want to put at this stage i just want to put some passages to you from mr meredith's oral evidence that he gave to this inquiry and to get your response to those if we can go first to day 75
00:05:12 those if we can go first to day 75 page 179
00:05:22 and if we can pick it up at line um 14 [Music]
00:05:27 [Music] and and this is where we've been discussing um the kingspan off-site emails so i say at 14 just putting this email to one side for the moment and just thinking
00:05:38 side for the moment and just thinking generally did mr rochford ever raise any concerns with you about supplying customers with new technology k15 given the fire risk it posed and then he says this i don't think as
00:05:50 and then he says this i don't think as far as i
00:05:51 far as i recollect malcolm didn't raise issues with me
00:05:54 with me it would be me raising issues with him i would always go to him with my problems not vice versa so i can't recollect unfortunately do you see that there i see his response yes and and do you
00:06:07 i see his response yes and and do you agree with that that it was it was him raising issues with you and problems
00:06:12 problems about k-15 with you rather than you ever going to him and saying if we've got problems with k-15 what should we do about it do you agree no i don't agree i think clearly you can
00:06:24 no i don't agree i think clearly you can see that i'm saying that look um to either if you if the old process is the product you think we need to supply for this then then let's do it well we we've talked about that email
00:06:36 well we we've talked about that email and um but that is that is talking to either i
00:06:39 either i and i would have said the same in person as well
00:06:43 as well so yes and we've discussed whether or not that email might actually be read as you providing old process k-15 for the testing
00:06:50 testing took king's van off-site yes no we wouldn't have done that it would have been
00:06:54 been right can we look at day 75 page 1 5 7 now pick it up at line eight
00:07:07 so this was earlier in his questioning when we've been discussing his report about how the phenolic burned if you pick it up at line eight i say
00:07:18 if you pick it up at line eight i say did philip heath and malcolm rochefort share your concern about the fire performance of the new technology k15 at this time
00:07:25 this time and he says like i say i think this might have been the time that i was criticized for not being very positive about
00:07:30 about our products or sorry the kingspan products
00:07:34 products do you see that there yes were you ever made aware that um mr meredith was criticized for not being positive enough about kingsband products
00:07:43 products no i wasn't aware of that and that didn't come ever from you as technical director no i wouldn't i appreciated the openness of either i mean he wasn't uh
00:07:54 either i mean he wasn't uh he wasn't most stable of characters but he was he was he was very dedicated he did an excellent job on the whole and uh
00:08:02 uh i'd much appreciated it and then it carries on so i'll put the question at 14. so does it follow that you didn't think your managers were concerned or concerned in the same way as you and then he says i don't think they were
00:08:14 and then he says i don't think they were concerned in the same way as me no and then i say yes and then he said i felt a tremendous responsibility for this because the buck stopped with the technical department to make sure that it was suitable for
00:08:25 to make sure that it was suitable for the marketplace and we had to do the testing
00:08:28 testing do you see that there yes would you agree that you weren't concerned in the same way that he was about the fire performance of k-15 i think we were concerned about the results from the from the fire test from the system tests
00:08:41 from the fire test from the system tests um
00:08:42 um and i think we were looking at k15 as one of the possible causes of that problem right so i think we have to look at it in an objective way and if we
00:08:54 at it in an objective way and if we carry on
00:08:54 carry on at 24 line 24 i ask after you wrote this and obviously this report was delivered to the technical team did you feel at the
00:09:02 the time that your concerns about the fire performance of new technology k-15 were being taken seriously by philip heath and malcolm rochford and he says this answer i felt like i wasn't ever heard
00:09:13 wasn't ever heard actually when it came to issues like this
00:09:16 this and then at line six did you actually have conversations with them as well as writing this in which he said i'm really concerned about how k15 performs given the testing we've just done how it performs in fire
00:09:27 done how it performs in fire did you have those conversations with them we were always there was always a new solution on the horizon we could try this or we could do this so i was constantly being you know there was something round the corner that
00:09:39 was something round the corner that could help us move forward so i guess i was always hoping that that would be the end of it really do you see that there i see that yeah now just going back to that earlier part at line
00:09:49 at line four he says he felt he wasn't ever heard
00:09:52 heard when it came to issues like this are you prepared to accept looking at it now that you
00:09:58 that you didn't hear him properly about the concerns he was expressing no i i think we did hear i think it was it was one of the factors we had to take into account
00:10:10 into account and is it right that in reality everyone was always just looking to the new solution on the horizon the next possible test that might validate the use of k-15 on tall
00:10:21 validate the use of k-15 on tall buildings is that the reality of how it was at the time i don't know if it was a general if that was a general
00:10:28 general issue i think my propensity uh because of my job was as a chemist was was to look for possible chemical solutions that would be
00:10:39 solutions that would be the sort of thing i would do so that that would be the way my mind would work technical director was it not part of your responsibility
00:10:50 your responsibility to make sure that you weren't selling something which was being misdescribed from a technical point of view was that not part of your responsibility not just to look for the next solution
00:11:01 next solution but to check that what you were selling was safe
00:11:04 was safe i think i think we we had in general in terms of
00:11:07 terms of the fire testing etc carried out tests i think this um particular system test was raising concerns and we were looking at it and saying well how
00:11:19 were looking at it and saying well how how can we um how can we solve this issue
00:11:26 and then if we carry on um it's line 17 but do you actually have a specific recollection of raising concerns with them he says answer i raised concerns on numerous occasions when it came to new technology
00:11:38 when it came to new technology and then about its fire performance yeah you didn't think you would listen to is that what you're saying i might have been listened to but they certainly didn't
00:11:47 didn't respond to it do you see that there and then i go on you said earlier that you thought it was around this time that you were being criticized for being too negative who was it who criticized you for being too
00:11:59 was it who criticized you for being too negative
00:12:00 negative it would have been the managing director so who was that malcolm and he says peter wilson okay now were you ever made aware that peter wilson was criticizing iva meredith for being too negative
00:12:13 iva meredith for being too negative about k-15's fire performance no it wasn't
00:12:19 mr heath also said in his evidence yesterday that mr meredith's concerns were conveyed to you we can see that in writing yes but i asked him that and he confirmed that
00:12:30 asked him that and he confirmed that they were conveyed to you and can you explain why you didn't take those concerns seriously at the time sorry i think i think we did take them seriously i think we were looking we're doing a lot of work to see if we
00:12:42 we're doing a lot of work to see if we could um
00:12:43 could um solve those those problems did you ever take steps to check that in fact you were only ever selling k-15 on high-rise buildings for those with
00:12:55 on high-rise buildings for those with masonry substrates did you ever check that for yourself i don't think i did i would have relied on the on the sales and ts to make sure that happen
00:13:06 and ts to make sure that happen why not once you realize that k-15s performed so badly in steel frame systems that's your evidence that it was the system that was so concerning
00:13:17 concerning why not check that what you're selling is only ever for masonry substrates i would have trusted the system and and
00:13:28 i would have trusted the system and and the and the people involved in it
00:13:36 i want to go on now to ask you about the labc
00:13:40 labc system approval certificate that was issued in 2009 and you make clear just for the transcript it's paragraph 8.4 of your
00:13:51 transcript it's paragraph 8.4 of your statement page 36 that you had no direct involvement in any interaction with the labc
00:13:56 labc in 2009 in relation to that certificate that's right isn't it that's correct yes and who was responsible so far as you were aware for obtaining that document that labc
00:14:08 obtaining that document that labc system certification as far as i know it was philip heath [Music]
00:14:13 [Music] when did you first see the final issued document
00:14:18 it was issued in may 2009 did you see it straight away do you remember i don't know that i actually saw the document um i mean presumably at some stage i would have
00:14:29 presumably at some stage i would have looked at it but i don't recall looking through the document what did you understand to be the purpose of kingspan obtaining this labc certificate um i understood the purpose was uh
00:14:44 um i understood the purpose was uh as a way of ensuring that uh k15 could be used on facades above 18 meters yes and generally on facades over 18 meters that's right isn't it not just on masonry systems
00:14:56 isn't it not just on masonry systems i don't think i don't think it says that i mean i've looked at it subsequently i don't think it says that does it don't think it says what that it can generally be used on i think it's it's all
00:15:07 it's it's all in terms of non-combustible well let's look at an email that you're sent about this kin3020714
00:15:20 sent about this kin3020714 and i want to go to the first email in the chain three emails down on page one it's an email from mr heath
00:15:28 and you are cc'd into it do you see that at the top of the page yes 7th of may 2009 and he says this great news please find attached local authority building
00:15:39 attached local authority building control approval for k-15 rain screen board
00:15:42 board this is what is labc approval under agreement by all local authorities in england and wales design approvals for building types and building systems can be issued by one local authority
00:15:53 can be issued by one local authority and accepted by all other local authorities providing there are no changes in design implementation construction or site-specific variables this approval covers compliance with the building regulations
00:16:05 building regulations a register of approval designs is kept by labc etc and then benefits he says having a building type housing commercial or industrial or a complete building element a system approved by labc means that it can be
00:16:18 approved by labc means that it can be used without the full plans approval process happening repetitively around the country at each site this saves time and money for developers designers engineers contractors and builders
00:16:28 builders and then he says this the highlight of this certificate and supporting documentation is the requirement under b4 of adb external fire spread since k-15 can be considered a material of limited combustibility
00:16:40 of limited combustibility it is suitable in all situations shown on diagram 40 of approved document b volume 2 including those parts of a building more than 18 metres above ground
00:16:49 ground in the latter circumstances the cladding system and the substrate to which the insulation is applied must also meet the requirements for limited combustibility where the substrate is a metal framed wall system rather than masonry or
00:17:00 wall system rather than masonry or concrete
00:17:01 concrete non-combustible lining board must be specified to the external face of the metal frame wall e.g calcium silicate board or similar performing and then he says no this statement does not differ from anything
00:17:13 not differ from anything that kingspan states and then he goes on if we can go to the next part
00:17:19 next part k-15 remains the only installation board that successfully met the requirements of the bba and labc system approval all the relevant documents surrounding the approval certificate are attached special thanks to andrew pack for his
00:17:31 special thanks to andrew pack for his inconsistent endeavors do you see that there
00:17:33 there yes now going back to the answer you gave
00:17:37 gave earlier and if we just look at the extract he's put if we go back a page into there it is saying that you can use k15
00:17:49 that you can use k15 on all situations shown on diagram 40. it then says the the cladding system and the substrate to which the insulation is applied must also meet the requirement for limited combustibility
00:18:00 for limited combustibility and where the substrate is a metal-framed wall system rather than masonry
00:18:04 masonry non-combustible lining board must be specified
00:18:07 specified do you see that there yes now what test evidence
00:18:11 evidence did you have that you were aware of that supported
00:18:16 supported that text in that certificate i i wasn't aware of um what tester was i think i asked phillip what he'd what he's done to get the
00:18:29 what he'd what he's done to get the uh approval yes we'll look at that in a minute
00:18:32 minute um looking at at it now what test evidence could there have been to support the use of k-15 in a metal framed wall system
00:18:43 framed wall system provided to use a non-combustible lining board where's that test evidence i don't know i'm i i would have looked at this and i wouldn't i wouldn't have understood it probably in the way that i understand it now
00:18:54 in the way that i understand it now i i wouldn't have understood it then um so i think that would have passed me by i'd have just said well that makes sense um if it's if there's an online
00:19:08 um if it's if there's an online non-compatible lining board um is is internal instead of a masonry or concrete wall that would have made sense to me at the time but even though you had no test
00:19:19 time but even though you had no test evidence to support that i i wasn't that aware of of what the um in terms of what the still frame test was
00:19:31 the still frame test was in the sense that i wouldn't be wouldn't have been aware of what was on the inside
00:19:37 inside but we've looked at documents that show that you were fully aware in 2007 and 2008 that there were tests to 8414
00:19:45 to 8414 part two the steel frame structure and you've been at pains to emphasize that you recognize that was a fail those were failures in that particular system in those systems yes in the light of
00:19:56 in those systems yes in the light of that
00:19:58 that how could you be satisfied that it was appropriate to say that you can use k15 in a metal framed wall system when you knew that system that's being described there had not been tested
00:20:11 described there had not been tested and certainly hadn't passed i i didn't know that
00:20:14 know that that described what was actually tested and i still don't know actually if that described what was tested because it does say non-combustible lining board must be specified to the external face of the metal frame wall so i assumed
00:20:27 frame wall so i assumed that that this was a requirement that labc
00:20:31 labc had put in or were happy with that enabled that type of construction would you agree that clearly this certificate was a cause for celebration
00:20:42 certificate was a cause for celebration within kingspan well yes philippe says great news exclamation mark sir and looking at the part that's in bold material of limited combustibility what
00:20:54 material of limited combustibility what did you understand that to me as i said my complete understanding of material limited combustibility was limited um but clearly phil had considered it important
00:21:06 clearly phil had considered it important because he highlighted it so i i would have assumed that that was
00:21:13 correct and i mean since then i've looked at it and i i understand that there's there's more than one route you can go and that would be a requirement uh that
00:21:24 and that would be a requirement uh that was met by another test but at the time i would have taken that as as being correct you said your understanding was limited
00:21:35 you said your understanding was limited but
00:21:36 but at the time did you consider well what test evidence was that based on
00:21:44 on um well i did ask phil what tests he'd used yes we'll come to that in a moment and and that was an important question for you to ask wasn't it what test evidence is this based on
00:21:57 what test evidence is this based on let's look at that are we going to leave this document now um
00:22:02 um we're going to come to another email string where we've still got that there but if
00:22:06 but if mr chair if you want to ask anything more about it just like to ask dr rochard i mean would you consider k-15 to be a material of limited combustibility now i wouldn't because i know then i
00:22:19 now i wouldn't because i know then i i wouldn't have it wouldn't have struck me as odd should i just say that because as far as i was concerned my mindset was it's phenolic it's it's the best performing um polymeric insulin thermostat
00:22:32 um polymeric insulin thermostat set around maybe maybe that's what it could be so i it could have been referring to the to the material as far as i was concerned at that stage i mean you you didn't know it was combustible because you yes
00:22:44 it was combustible because you yes yes very early on but that that um distinction between limited combustibility if if it had said for example since k-15 can can be considered a
00:22:55 can can be considered a an a2 euro class material yes i would have said
00:22:59 have said hang on it isn't that yes um but zero limited capacity wouldn't have stood out to me and subsequently i would have understood that it had to do some tests
00:23:11 that it had to do some tests in order to to be considered i'm just wondering whether at the time you would have described it yourself
00:23:19 yourself to anyone else as a material of limited combustibility i don't think it's a term i would generally use um i would try to be more specific about what
00:23:28 what tests the past yeah thank you yes it's strange
00:23:32 strange yes as technical director were you not curious to understand precisely what was meant by
00:23:38 meant by material of limited combustibility no i i mean i would have taken the whole paragraph and thought yeah great that's good labc
00:23:49 thought yeah great that's good labc as far as i was concerned
00:23:53 a reputable authority considered the product was suitable above 18 meters therefore that's good news if we can
00:24:04 that's good news if we can look at um the top of this email chain on this page
00:24:18 on this page is there an email above this yeah so we can see that about an hour later on the same day 1610
00:24:29 on the same day 1610 you email just mr heath and you say out of curiosity which fire test results did we use to get this regards malcolm did you see that there yes
00:24:40 did you see that there yes i think we've agreed that that was a very important question wasn't it it with retrospect it is a very important question i was i was curious as what he'd use yeah the fact that it was an hour later i don't
00:24:51 fact that it was an hour later i don't know what
00:24:52 know what whether that's significant or not because we were in different places i could have been doing other things and then we see mr heath's response to you at the top of that page
00:25:03 you at the top of that page later that day
00:25:06 and he says this he says we can be very convincing when we need to be we threw every bit of fire test data we could at him we probably blocked his server in the
00:25:17 we probably blocked his server in the end i think the labc convinced themselves cool therm is the best thing since sliced bread we didn't even have to get any real ale down him exclamation mark phil do you see that there yes i do yeah
00:25:31 would you agree that that email conveys the impression that he was surprised at how convincing he'd been with the labc
00:25:40 labc not necessarily it i i think i was aware that he and andrew pack
00:25:47 pack were working on this um purely from the the email from phil um and i know andrew is a very uh detailed guy and would would know his
00:26:00 uh detailed guy and would would know his stuff
00:26:00 stuff back to front so if andrew was involved along with phil i would have thought all the
00:26:07 the that the necessary information was provided to the labc
00:26:14 were you surprised yourself at the sections relating to the use of k-15 in buildings over 18 meters in height no that that was what the
00:26:25 no that that was what the certificate clearly it states there in phil's email but you've been telling us that you knew that you still needed to keep on testing
00:26:37 that you still needed to keep on testing to to find an eight for one for part two test that you could pass yes yes that's correct because you knew that
00:26:45 that because we'd failed in those system tests yes and it was clearly there was still a problem there that needed sorting
00:26:50 sorting yes and so you knew that didn't you that the only bit of fire test data you had was the 2005 test at this point yes that was all that was in kingspan's
00:27:02 was all that was in kingspan's file no i did i didn't know that i i assumed there were other fire tests that did he used which are the fire tests
00:27:10 tests i don't know um that was my assumption because
00:27:14 because the fire tests you've been told about sorry let me finish my question in 2007 and 2008 were all failures you've been told you can't get the euro class you've been told you can't get the national class naught
00:27:25 national class naught and you've been told about four failures to eight four one four so how did you think that there was other testing which had justified this result
00:27:34 result sorry we did have euro class we had euro class c s one d naught you were told that you couldn't achieve so dr roche would answer the question we had uh euro class s1c um what i was referring to there
00:27:48 s1c um what i was referring to there sorry if i can clarify was that you'd been told that the euro class he was struggling to get the same euro class
00:27:54 class do you remember we saw that in iva's doctor that was one common from either from either and i i don't know that that was reality or not or one test that i either did on an unknown
00:28:05 one test that i either did on an unknown product that gave that result so i had no proof one without
00:28:10 without i don't know what other tests they were doing at the time at this time
00:28:16 but the way phil phrases that he says we threw every bit of fire test data we could at him so that to me says there's an awful lot of other
00:28:27 other fire test data has gone into it i don't know what that was but that was that was the way he phrased the answer
00:28:36 so should we understand that it was your view at the time that a lot of fire testing was going on of which you weren't aware yeah that's possible uh because um
00:28:47 that's possible uh because um was it your understanding at the time there was a lot of fire testing going on of which you hadn't been informed that's also possible it's it's quite possible because
00:28:58 possible because the technical service department did their own
00:29:02 their own testing and
00:29:06 they also had access to tests with the product being tested in i'd know apart from european tests there were tests singapore tests there were chinese tests there was australian tests i think
00:29:18 tests there was australian tests i think so there was a lot of a lot of other information out there i don't know how convincing it would have been but
00:29:24 been but it's possible that there were other tests it was advertise data right thank you sorry strange that's okay isn't it right that as the person in control of the budget you would have had to sign off on the
00:29:36 you would have had to sign off on the costs of any other testing not if it was done in another department i wouldn't which other department are you talking about it could have been done in um production department operations
00:29:49 um production department operations it could have been done at one of our subsidiaries abroad i i don't know dr richard are you saying this is
00:29:57 this is actually what you thought at the time that there must be other fire test information that i'm not aware of
00:30:04 aware of that doesn't appear in any of the monthly reports or the other technical feedback that i'm getting so i don't need to worry about it because there must be that other body of test data is that
00:30:15 of test data is that what you actually thought at the time that is what i actually thought at the time yes
00:30:21 time yes did you ever get a proper response from mr heath
00:30:24 mr heath this response doesn't actually tell you what test data you used it doesn't answer your question what you ask which fire test results did we use to get this did you ever get a proper response to
00:30:36 did you ever get a proper response to that question i don't think i got anything in writing whether phil came along at some point and i don't know where phil was physically and where i was physically during this interchange so
00:30:48 you're the technical director you can see that this is a great moment in the the lifetime of k15 why didn't you ask for a proper answer to that question
00:30:59 to that question what fire test data did we use to get that why didn't you follow up on it well i i trusted the the department um and i had no reason not to trust them
00:31:13 um and i had no reason not to trust them phillip heath was very experienced guy andrew pack was extremely experienced as well so that was a situation at the time can we go now to a different email from
00:31:25 can we go now to a different email from the 11th of may a little bit later than this
00:31:30 kin405382 with the subject phenolic fire focus group
00:31:37 do you see this so this is an email a few days later on the 11th of may 2009 and you're cc'd in here do you see that yes
00:31:46 yes and it's um attaches the labc system approval certificate we can see that and mr heath says following the success of receiving the attached labc
00:31:57 of receiving the attached labc accreditation that now satisfies the requirements for k-15 being installed above 18 meters we should cease any further fire test for ventilated rain screens do you see that there yes
00:32:13 did that make sense to you that the labc accreditation now satisfies the requirements for k-15 being installed above 18 meters
00:32:25 no it didn't surprise me at the time oh sorry didn't um uh can you just rephrase the question yeah did that make sense to you that he's saying that the labc
00:32:36 that he's saying that the labc accreditation now satisfies the requirements for k-15 being installed above 18 meters well yes it did because i i believe that the lapc's certification
00:32:48 i believe that the lapc's certification was was correct so but but how did that make sense you said that you knew about large scale 8414 testing yes and you you'd been aware that there'd
00:32:59 and you you'd been aware that there'd been failed tests to try and meet that test standard failed system tests yes i don't know the details how the details of the system
00:33:10 system compared with the details as as put down in the labc certificate so my assumption would have been that
00:33:19 been that if provided that labc advice is followed then that is acceptable right and mr heath is saying now that we've got that certificate we should cease any
00:33:31 got that certificate we should cease any further fire test for ventilated rain screens
00:33:34 screens did you agree with that that it was right to stop testing at this point given what you've got in the labc certificate i can see why you're saying it because of the
00:33:45 it because of the the cost of the tests um i thought we should
00:33:48 should carry on work and i think we did in the focus
00:33:52 focus fire focus groups uh to understand that and add other things as well um about the product to see if we can at some point in the future repeat tests
00:34:04 at some point in the future repeat tests if it was appropriate so it do i get this right that actually at the time you thought you should carry on
00:34:11 on what work on eight four one four large scale testing well no i i could see that we had the labc certification and therefore it wasn't
00:34:22 certification and therefore it wasn't it wasn't a necessity to do the eight four one
00:34:25 four one four part two or part one testing but um clearly we need to get to the bottom of of
00:34:36 we need to get to the bottom of of why it was performing differently and that was the work that i was keen to carry on doing can you explain why the labc certificate meant it wasn't necessary to do the 8414
00:34:49 meant it wasn't necessary to do the 8414 testing can you explain why you were of that understanding from the explanation given by by philip peace
00:34:58 peace but on the basis of what test evidence well that as i said i i had us assumed that there was a lot of test evidence given um a lot of details given to the labc to
00:35:12 um a lot of details given to the labc to achieve this certificate i see and then he goes on at in excess of 15k per test both the sales and business development teams should be adept enough to use their toolkit to the full
00:35:24 toolkit to the full the pressure is on other component suppliers of this method of construction to obtain similar statements or prove their non-combustible statements do you see that there yes and then he goes on this saving will allow other
00:35:35 goes on this saving will allow other applications and the call them brand to achieve a similar focus to that given to k-15 over recent years and look at how the sales in this have grown
00:35:45 grown therefore the focus on this group should be on the other cool theme applications where we do not have the complete sales toolkit
00:35:51 toolkit we should also be considering fire test smoke test etc that may not be relevant for either construction or the end use application provided it has a good marketing story these should be tabled
00:36:03 marketing story these should be tabled now that last sentence did you think that was appropriate for mr heath to be saying in this email that you should consider fire test smoke tests that may not be relevant for either construction or end-use
00:36:14 for either construction or end-use application provided it's got a good marketing story they should be tabled well i can see i can see
00:36:21 can see it looks like it's just doing it for marketing reasons from from my point of view
00:36:25 view any tests that um showed the phenolic product
00:36:29 product in a positive light were worth pursuing because you never know whether they might
00:36:33 might when they might be useful uh in the future and if it's yes i mean marketing were making and selling products so you'd obviously try and do things and
00:36:44 you'd obviously try and do things and then see if you try and do things that that could potentially give you a new market but you'd also look at what tests you've got and what other markets you can get into
00:36:55 into it's a natural commercial activity
00:36:59 did you think it was appropriate to be providing
00:37:03 providing test relevant test evidence that might not be relevant provided it's got a good marketing story did you endorse that approach as technical director
00:37:13 no i think what he's saying there maybe i've misread it but what he's saying there um it may not be relevant for the over construction and use application
00:37:24 construction and use application uh what
00:37:27 uh what what can we do to show that phenolic is a better
00:37:31 a better material in terms of its fire performance and insulation performance um compared to other insulin materials that was a a natural thing to try and do
00:37:42 that was a a natural thing to try and do for the cool firm brand i see just standing back from this email and thinking about this email in the great news email would you agree that you knew full well at this time that this was a get out of
00:37:55 at this time that this was a get out of jail card
00:37:56 jail card it bought kingspan time because it was not managing to pass the 8414 part two that's the reality isn't it no i didn't think that i thought this was
00:38:07 think that i thought this was uh an alternative route they'd gone for accreditation of um eight four one four uh part two or above 18 meters
00:38:19 uh part two or above 18 meters and therefore was valid in its own right so
00:38:23 so um that was that was my approach to it and what was that alternative route i don't know i i mean i certainly didn't know at the time i just um
00:38:34 time i just um assumed that the labc had been uh convinced
00:38:37 convinced and as a reputable body that they the the the certificate was correct did you think that that that other body of test evidence that you hadn't seen included tests at 8414
00:38:50 you hadn't seen included tests at 8414 that was shown to the labc did you assume that at the time i don't know i i don't know what i assumed at the time in terms of what those tests were
00:39:04 and did you agree with the decision to stop testing
00:39:08 i can see from a cost point of view it made sense if we didn't need to do the tests because i think i think that 15 k was probably an
00:39:19 i think that 15 k was probably an underestimate for what the tests cost um it was also taking a lot of resource
00:39:25 resource so if we actually didn't need to do the tests then it was sensible to apply that resource elsewhere if we can look now
00:39:32 look now at some meeting minutes and kin3020737
00:39:45 this is the first meeting of the fire focus group on phenolic do you see that there
00:39:50 there yes and your present either meredith takes the minutes yes do you see that then if we look on page one
00:40:03 we can see we read under background it says the meeting was called to organize agree and understand the current fire testing requirements and mandatory product development of our new technology cool firm
00:40:14 technology cool firm there are several fire performance requirements that are crucial for sales of phenolic however in some areas on development phenolic products we are falling just short of the mark this
00:40:25 falling just short of the mark this group was originally pulled together as we believe we must have the bs 8414 parts one and two far test for masonry and steel frame prior fire propagation test on cool thumb k15
00:40:37 fire propagation test on cool thumb k15 then it says this following the recent release of the k-15 bba and the labc land tech approval this urgent requirement has been relaxed as the documents are working to cover the regulatory desires for
00:40:49 the regulatory desires for specific system approval other areas of concern relate to the surface spread fire performance of the product that we are concerned may have reduced this can be seen in
00:41:00 may have reduced this can be seen in recent 476 part 7 tests and the most recent attempt at you ul for the new technology cool duct tape that's
00:41:09 that's underwriters laboratory that you yeah yeah so can you see there it's clearly being recorded in a meeting that you're present at that the urgent requirement for that 8414 testing has been relaxed
00:41:22 8414 testing has been relaxed as the documents are working to cover the regulatory desires for specific system approval do you see that yes what did what did you understand that to me when you read it
00:41:34 me when you read it how could those documents be covering the regulatory desires for specific system approval if you hadn't had any
00:41:41 had any passes to 8414 i would have assumed it was it was correct that there was an alternative route to to get this specific system approval
00:41:52 specific system approval i see
00:41:58 the sentence um we still need to look at developing a product that will be able to pass a bs 8414 part 2 test confirms that kingspan did not have any
00:42:09 confirms that kingspan did not have any version of k-15 in may 2005 which is part of a system could pass a large-scale fire test to bs 8414 that's right isn't it
00:42:21 can you just re repeat that question yes the sentence we still need to look at developing a product that will be able to pass a bs 8414 test
00:42:32 a bs 8414 test where does it say that sorry
00:42:37 sorry maybe that's further down
00:42:41 yes i'm so sorry i'm sorry an item two i beg your pardon still on on page one oh right okay sorry it's there if under cool them k-15 facade test it says
00:42:54 under cool them k-15 facade test it says following discussions it was agreed that we still need to look at developing a product
00:42:58 product that will be able to pass a bs 8414 part 2 test
00:43:02 2 test as a backup to the labc documentation do you see that there yes so does that confirm that kingspan didn't have any version of at this time may 2009 which is part of a
00:43:14 at this time may 2009 which is part of a system
00:43:15 system could pass the large-scale fire test to part two of eight four one four well we knew that we'd be done probably by this time four um eight four one four part two system
00:43:26 um eight four one four part two system test with
00:43:27 test with with other suppliers um so uh the fact that it would be desirable to get a ps8414 part two test
00:43:38 desirable to get a ps8414 part two test um
00:43:40 um made sense
00:43:44 i see in fact it's right isn't it and we'll come to this later that no further 8414 testing actually was carried out again until 2014
00:43:54 2014 that's correct yes yeah
00:43:58 sorry can i just take one step back as far as i know that's correct there might have been some indicatives that i didn't know about for example when in one of the chains of emails uh quinn
00:44:11 in one of the chains of emails uh quinn asked the question about did an old process fail the test and and iva says yes it did indicated to me there must have been a test that i wasn't aware of so
00:44:22 test that i wasn't aware of so there could have been other tests out there right
00:44:27 now you were asked by the inquiry if you had at any stage be made aware of any complaints about kingspan in relation to k15 and if we go to your response in your
00:44:38 and if we go to your response in your witness statement this is at paragraph 4.15 on page 17.
00:44:47 you say there that you're aware that during the period july 13 to november 13 an issue did arise in respect of concerns about the fire performance of k-15 raised by wind tech he described themselves as facade
00:44:59 he described themselves as facade engineering consultants do you see that there
00:45:02 there yes and i want to move on to some questions about those issues with wintec if we can go to kin405683
00:45:13 if we can go to kin405683 and i want to look on page two about two-thirds of the way down the page
00:45:20 there's an email there from gareth mills do you see there and it's um cc to you 24th of july 2013. do you see that there
00:45:34 and the title of the email is downing developments k15 jobs 18 meter wind tech issues
00:45:40 issues do you see that yep and then he says that we may need to re-look at the issues we are having with regards to some of the k-15 jobs i've highlighted in recent weeks
00:45:51 in recent weeks specifically for the two downing development jobs i've been in contact with andy russell of the bre to aid with the assessment that they were doing as per discussions last week
00:46:01 last week that he has advised key clad today that due to the limited test data we have they are not able to complete the assessment and said we either need a bs 8414 part 2 result
00:46:12 8414 part 2 result apparently would not have to exactly match the proposed construction provided it was a bs 8414 part 2 rain screen result or a limited combustibility or better test result
00:46:23 result which would if available negate the need for the assessment and then following getting this information via anthony martin of key clad
00:46:32 clad um john lazal the key clad md has phoned up not very happy and has asked if either tony or malcolm can ring him in the morning to discuss the resolutions
00:46:43 the resolutions do you see that there yes
00:46:48 [Music] now
00:46:52 did you know what discussions he's referring to do you see in that second paragraph in the second line he says as per our discussions last week specifically for the two darling developed jobs i've been in contact with
00:47:03 developed jobs i've been in contact with andy russell of the bre to aid with the assessment they are doing as per our discussions last week had you been involved in any discussions i don't think so i think this is this is to tony uh and iva so yeah i know i'm copied in but
00:47:17 and iva so yeah i know i'm copied in but i don't think i was involved you don't recall those [Applause] i think this is i think he's copied me because
00:47:26 because uh the key cloud md wants to talk to someone senior about it i i would assume that's
00:47:31 that's yes yes that that appears and then going down to page three looking at the rest of his email
00:47:40 um he sets out what the system was um on that wall construction plasterboard steel stud filled with rock wool versa panel etc
00:47:51 panel etc and then he gives some details of horizontal and vertical cavity barriers and then he says this in the penultimate paragraph
00:47:59 paragraph if anyone has any advice on how to progress key cloud wants us to do a further bs 8414 test although this may not be practical so any advice would be appreciated do you see that there yes
00:48:12 do you see that there yes and we've seen he's asked that either tony miller chap or you call the managing director of key clad um now moving up the chain in the middle of page two we can see that you respond
00:48:24 page two we can see that you respond the following morning on the 25th of july
00:48:29 and you say gareth i'm in meetings all morning but should be able to call him about 1pm
00:48:34 about 1pm please let him know either please forward or link me to our bs 8414 pass result
00:48:40 result do you see that there
00:48:44 why did you step in at this point and not leave it to tony miller to deal with i assume tony was was busy um i the guy is after
00:48:57 um i the guy is after talking to someone senior whether i had a conversation with tony or not i don't know but
00:49:01 know but uh that would be the only reason incidentally i can't remember if i did talk to him or if i don't i'll come to that i'll come to that if your involvement in fire testing was only at a high level what did you hope
00:49:13 only at a high level what did you hope to contribute to this particular discussion with them i was only involved because as far as i understand that the key clad and md had asked to talk to one of us so
00:49:24 asked to talk to one of us so that would be the only reason and when you say please forward or link me to our bs 8414 pass results that could only be the test from may 2005 yes
00:49:34 2005 yes i assume so yes on the masonry system yes which you knew predated the change to new technology k15 yes um yes well i think i would have known
00:49:47 um yes well i think i would have known by the yeah yes
00:49:51 oh i'm sorry apparently the transcript stopped
00:49:57 okay sorry i think there's been a problem with the system oh do we need to take a break okay how long do you think it might take five minutes we have a break now then
00:50:08 five minutes we have a break now then and we might as well take the afternoon break early yes that's sensible um we always have a break in the afternoon doctor rocks but we don't normally have it as early as this but his own existence in the circumstances we'll take it now
00:50:19 in the circumstances we'll take it now and we'll come back at 10 past three please okay and no discussing your evidence
00:50:24 evidence all right thank you very much
00:50:33 right ten past three
01:05:18 good now first question as far as we know is everything working good thank you very much well we've now had our break so we're ready to keep cracking on would you ask dr rochefort to come in
01:05:34 please
01:05:44 all right dr worship well ready to carry on i hope
01:05:47 on i hope yes thank you very much yes it's great yes thank you we were looking at an email chain which is relevant to concerns that have been raised by wintec in 2013. if we could go back to that chain kin
01:05:59 chain kin 405683 and if i can pick it up at the top of page two
01:06:08 so we can see that joel clark has sent you
01:06:12 you the following link uh the following will link you to our bs 8414 test report do you see that there yeah i sent you a link
01:06:22 and then the next email up in the chain is from you it starts at the bottom of page one and on to page two if we just pick it up just look at the start of it so we can see you've sent it to joel clark
01:06:35 see you've sent it to joel clark cc and gareth mills tony miller chap iva meredith
01:06:39 meredith and then if we look at what you've said at the top of page two you say thanks i'm checking but what does the part 2 test involve regards malcolm do you see that
01:06:50 involve regards malcolm do you see that there
01:06:52 there yes sorry did you not know in 2013 what the bs 8414 part 2 test involved
01:07:01 involved i think in terms of detail i didn't no did you know it was a test on a steel frame structure i think i probably would have known that right
01:07:12 right but i'm sorry what i was going to say was certainly after the meeting with wintec i definitely knew it but i think i probably would have known it at this point yeah
01:07:24 at this point yeah i mean we've looked at a lot of notes from
01:07:27 from 2007 2008 when the 8414 part 2 test tests are taking place on the steel frame systems so do you agree that by this time you
01:07:39 so do you agree that by this time you would have understood that it would have involved a steel frame system even if you didn't know a bit more about the detail of it yes i think that that's a better clarification thank you yeah and then is in his email back to
01:07:50 yeah and then is in his email back to you about halfway down page one sent at um 13 35 we go to that now
01:07:58 um joel clark says hi malcolm attached the primary difference is substrate part two specifically for steel frame structures and then he says i don't think there is a major difference in the test
01:08:09 a major difference in the test configuration and method just that this deals specifically with steel frame buildings and then he says part two is i believe now explicitly referenced in part b of the building regulations and then he
01:08:21 of the building regulations and then he says our 84141 test was undertaken on steel frame with non-combustible substrate prior to part two being issued as i understand it
01:08:32 part two being issued as i understand it do you see that there yes now did you pick up at the time that mr clark a senior technical advisor was telling you
01:08:43 telling you that it was a test on a steel frame the 8414 part one test did that make any sense to you it probably shouldn't have made any sense but i'm in the middle of
01:08:56 sense but i'm in the middle of i presumably trying to prep for a uh telephone conversation and joe was sending me some information so i would have assumed that there was a steel frame involved
01:09:08 that there was a steel frame involved with the part with that eight four one four part one test but um i agree in retrospect it doesn't seem to make any any sense but would you agree if you read the test
01:09:19 would you agree if you read the test report that was sent to you by mr clark you would have understood that that 2005 test
01:09:24 test was carried out on a masonry substrate
01:09:29 presumably i would have done you've been telling us up to today that your understanding was that k-15 could only be used on buildings provided it was with a masonry substrate that's right isn't it
01:09:43 masonry substrate that's right isn't it with a non-combustible uh substrate that was that was my understanding with a masonry substrate i think is what you said earlier on today i said masonry or cementitious yeah
01:09:55 i said masonry or cementitious yeah non-combustible substrate if we go to the very top of the email chain we can see another email from you and
01:10:06 we can see another email from you and you say this just checked our no our test bre 220876 was on a block work substrate however it does appear that a bs 8414 part 2
01:10:17 part 2 only came out in 2005 and our test was completed in 2005 so it's possible that it was the only test available at the time bs84 part 1 came out in 2002
01:10:29 bs84 part 1 came out in 2002 and then you say in ivor's absence could you or gareth please check when we could reschedule a bs 8414 part two
01:10:37 part two and the limited combustibility test what standard is this question mark so we have this information to hand presumably the latter will be quicker do
01:10:48 presumably the latter will be quicker do you see that there yes so is it right that at this time you wanted to schedule a limited combustibility test for k-15 uh yes and i clearly didn't know what it was
01:10:59 know what it was so that's why i'm asking i think i think i must have read the report
01:11:07 and were you unaware at the time that k-15 could not ever passed such a test or or tests to get limited combustibility it could never achieve a1 or a2
01:11:18 achieve a1 or a2 or the right test under 8414. sorry 476 part 11 could it i i certainly would have known it couldn't have been an a1 or a2 um
01:11:30 have been an a1 or a2 um i don't think i was familiar with the 476 part 11.
01:11:38 right
01:11:42 now looking at the correspondence with joel clark and gareth mills do you consider that you were in fact in a position to assist with the queries that had been raised by wintec
01:11:56 probably not because i don't think i was very well briefed on it but i assumed this was a question of talking to a customer and finding out what exactly the problem was what was the outcome of your discussions
01:12:08 what was the outcome of your discussions with key clad can you remember i think i do recall that i spoke to someone when i was in seoul in south korea and whether this
01:12:20 seoul in south korea and whether this was that
01:12:21 was that that occasion um it might have been um i can't even remember his name what did you tell them did you tell them it was okay to use k-15
01:12:31 k-15 no i i i would have i think it's from my vague recollection of the south korea
01:12:38 korea phone call it was um he was asking about tests
01:12:42 tests um and i was trying to clarify that and would have got back to whoever it was was was dealing with it right
01:12:53 now if we look at your witness statement at this point the um paragraph 4.16 on page 17.
01:13:05 um paragraph 4.16 on page 17. you you say this you say wintec were concerned that kingspan did not have an 8414 part two test on k-15 that is to say a test with a steel frame substrate as opposed to a masonry substrate
01:13:16 substrate this matter had been escalated to me and to resolve it i liaised internally with the technical projects team to confirm the basis upon which to respond i met wintec personnel and was involved
01:13:28 i met wintec personnel and was involved in some correspondence with those involved at windtech in order to try and resolve those concerns by referring them to the bba certificate and labc documentation that we had at
01:13:39 and labc documentation that we had at that time
01:13:41 that time following this exchange with wintec and others in the industry i recall that we conducted a program of further 8414 part 2 testing do you see that there
01:13:49 there yes i do yeah can you help us how did you try and resolve their concerns by reference to the bba certificate and the labc documentation
01:14:01 documentation i think that would have been what was available to me at the time um i'm not sure
01:14:10 why i was talking to wintec without advice from tony or phil it would have been tony at this time uh whether tony was not available or not i don't know but uh would you agree that there was
01:14:22 uh would you agree that there was nothing referred to in the bba certificate or the labc documentation which referred to a successful pass to 8414 part two on a steel framed substrate i believe that that that was
01:14:35 substrate i believe that that that was the case
01:14:36 the case um and following the meeting with wind tech i think that that was made clear to me and is it right that in october 2013 you met with paul savage and stuart taylor of
01:14:47 paul savage and stuart taylor of windtech
01:14:48 windtech along with the uk managing director of kingspan peter wilson uh yes why did kingspan's managing director peter wilson attend the meeting with you
01:14:58 with you i think because it was a um a major customer and a major uh specifier wintec were facade engineering consultants by the time you attended that meeting had you
01:15:10 time you attended that meeting had you learned that k15 was not a product of limited combustibility i again you're using a term that i i wasn't very familiar with and i honestly can't remember what my
01:15:21 and i honestly can't remember what my understanding of that would have been at the time
01:15:24 the time [Music]
01:15:25 [Music] what are your recollections of that meeting in terms of what was said about k-15
01:15:29 k-15 suitability for use above 80 meters i can't remember details but i did take some
01:15:35 some notes in my diary i think from that meeting i don't know if you've had a copy of that have you have we before
01:15:43 we'll check i'm not aware that we've had a call oh okay
01:15:48 okay we'll check what do those notes say i mean you've obviously looked at them they're they're notes to myself so they don't make a lot of sense but it just says
01:15:57 says um no i i honestly can't remember the details you need to look at look at the details they're not extensive notes they're just okay
01:16:06 okay and and i was i was told that you've been sent the diary extract so can i ask you where the diary is no the diary
01:16:15 diary is has been completely um photocopied the whole lot and i understood and then it's been looked at in detail
01:16:26 and then it's been looked at in detail and certain relevant sections have been copied as i understood the council um right we'll we'll make our own
01:16:37 um right we'll we'll make our own inquiries but just in case we needed uh any any further help do you have the diary
01:16:43 diary i have the diary yeah i i'm a bit of a hoarder i i keep the oldest and it has been it's looked it took a long time to go through everything um yeah so do you have any other notebooks
01:16:53 notebooks or diaries or any records no that was the only thing and it it's it's something i i just do out of habit i i will take this perhaps you would ensure that you don't part with it absolutely no no i i definitely didn't
01:17:05 absolutely no no i i definitely didn't but
01:17:06 but i i was under the impression that you had got all these maybe we haven't but um i just wanted to be clear of where we are again we've had a lot of very late disclosure from kingspan that we've been
01:17:18 disclosure from kingspan that we've been trying to
01:17:19 trying to look through as a matter of urgency so we will follow up on that um you're referring your witness statement to an exchange of correspondence following that meeting with wintec can we go to those emails it's at
01:17:33 can we go to those emails it's at kin403823
01:17:35 kin403823 and i want to look on page two to your email to wintech sent on the 31st of october
01:17:41 october 2013 at 13 25.
01:17:46 do you see that there and you say thank you for seeing us this morning so it's to paul savage and stuart taylor and it's cece and peter wilson and mark harris
01:17:56 harris and you say thank you for seeing us this morning to discuss for our facade installation systems we were pleased to hear you would like to do more work involving kingspan's insulation systems
01:18:07 kingspan's insulation systems and then you say as mentioned we are confident that our k15 rain screen board is suitable for facade use above 18 meters
01:18:15 meters given the correct design and installation and i enclose our bba and labc
01:18:19 labc certification to this effect as you are aware we have been successfully assessed by the bba and labc on the basis of our bs 8414 part 1 test
01:18:31 on the basis of our bs 8414 part 1 test conducted at the bre and have not seen the necessity of an extensive test program
01:18:36 program to bs 8414 part 2 considering the apparent contradictory advice in the scope of
01:18:43 scope of eight four one four part two see scope of parts one and two attached and then you go on however i note your concern that the bre are reluctant to assess
01:18:52 assess for certain constructions to br 135 on the basis of our existing test result and we'll discuss this matter with them tony baker as you suggest as discussed we will target resolving
01:19:03 as discussed we will target resolving this issue within six months if further testing is required by then or sooner if not i hope do you see that there yes yes now going back to the start of that paragraph you say as mentioned we are
01:19:15 paragraph you say as mentioned we are confident that our k15 range screen board is suitable for facade use above 18 meters given correct design and installation and i enclosed those certificates you don't say there
01:19:27 those certificates you don't say there do you it's only suitable on a masonry substrate
01:19:31 substrate no i i was using the advice from the bba and labc certificates and you don't explain that um you go on
01:19:42 and you don't explain that um you go on and you talk about your um eight four one four part one test you've been successfully assessed by the bba and labc on the basis of that 8414 part one test conducted at the bre
01:19:53 part one test conducted at the bre and have not seen the necessity of an extensive test program you don't explain to them that you've changed
01:20:00 changed the composition of k-15 to new technology k-15 since that time do you i don't know and you don't explain do you that there had been
01:20:11 had been a test program to 8414 part 2 in 2007 and 2008 which resulted in a number of
01:20:19 number of very significant failures do you they were systems um they were commercial systems from other companies and it wouldn't be appropriate to to
01:20:30 appropriate to to divulge information about them
01:20:35 so that would be the reason for that in what design or installation circumstances did you in october 2013 consider k-15 to be suitable
01:20:45 suitable for facade use over 18 meters i would have used the bba and labc certification so that's why i was
01:20:53 i was emailing it to them yes but as you've stated there that's on the basis of the 8414 part one test
01:21:01 test done in 2005. yes yes so how how were you relying on that in it in a steel frame situation part
01:21:12 in it in a steel frame situation part two situation and given you've now changed the k-15 that you're actually producing and selling
01:21:20 selling well as far as the certification was concerned that that was my understanding that that gave us the ability to do it um with the um the old technology new technology change
01:21:32 the old technology new technology change uh
01:21:33 uh as we've discussed yes there was a change my view was that the um the product itself was not vastly different in terms of its um its construction anyway but
01:21:46 its construction anyway but at this time
01:21:50 i'm not sure what my understanding of that what was tested in 2005 was actually um
01:21:59 by then sorry i mean i hadn't been looking at it for quite a few years and by then i don't think i was as clear about what what that was sorry the test was carried out at the
01:22:12 sorry the test was carried out at the time when we were changing the technologies why are you giving this advice if you're not that clear in your own mind this is you know that serious concerns have been raised about the use of k-15 above 18 meters
01:22:24 above 18 meters it's been escalated up to you peter wilson is now involved how can you be giving this advice if you're not completely sure the basis on which you're giving it i'm not giving advice i'm just i'm just
01:22:35 i'm not giving advice i'm just i'm just giving them information that that's they're the they're the experts in this i'm just giving them information and um to be honest this wasn't a normal activity i would undertake
01:22:46 activity i would undertake i don't i i've been um i've been involved in this because the the issue was escalated so following that uh meeting that we had on
01:22:59 following that uh meeting that we had on the 31st of october um then i would have been aware that they needed a eight four one four part two test with respect you're not just giving
01:23:10 test with respect you're not just giving information here you're saying in that first line of that second paragraph we are confident that our k-15 range screen board is suitable for facade use over 18 meters
01:23:21 meters given the correct design and installation yes and you enclose the bba and labc certificate to this effect yes and you say you've been successfully assessed by those organizations on the
01:23:32 assessed by those organizations on the basis of the 8414 part one test yes so on the basis of that one test you're giving this advice well that was my understanding at the time i mean with hindsight can i ask you
01:23:46 with hindsight can i ask you just to help me with this you um you refer to the correct design and installation what what systems
01:23:54 systems did you understand uh k15 could be used as part of my understanding was that it could be used against a non-combustible substrate yes
01:24:07 a non-combustible substrate yes with a non-combustible cladding material that was my understanding that was the limit of its scope of use as far as you understood as far as i understood yes
01:24:19 understood yes yes right thank you and when you say non-combustible substrate do you mean non-combustible substrate on a steel frame i i don't think i would have been
01:24:30 i i don't think i would have been considering that actually either way if someone told me that that was acceptable i would have but that has been acceptable that's what said in the labc certificate we looked at that earlier it says you can use it in a steel frame
01:24:42 it says you can use it in a steel frame system with a non-combustible substrate do you recall yeah well that's why i would have that's why i would have assumed yes but non-combustible what test evidence was there that k-15 could be used on a
01:24:56 that k-15 could be used on a non-combustible substrate like a calcium silicate board which is what's said in the labc certificate with a steel frame system where was the test evidence to support that i had assumed that the test evidence
01:25:07 i had assumed that the test evidence that this
01:25:08 that this 8414 part one test that was done gave the um ability to be able to use that against any non-combustible substrate that would have been my understanding of it
01:25:19 understanding of it and even though you've changed the technology of k-15 since and all you've had since on eight four one four is a series of failures on the on systems with other people we
01:25:31 on the on systems with other people we did four tests and i think there were four failures that's correct now
01:25:39 you go on to say from the end of that sixth line you say we saw it however i note your concern that the bre are reluctant to assess for certain constructions to bl-135 on the basis of our existing
01:25:51 basis of our existing test result what was the concern that the bre
01:25:55 the bre reluctant to assess for certain constructions what were those certain constructions i i can't recall but presumably that was steel frame and then you say as discussed we'll target resolving this issue within six
01:26:07 target resolving this issue within six months if further testing is required by then
01:26:12 did you accept at the time that wind tech's concerns were valid ones to be raising i think that they'd obviously convinced me and presumably peter wilson in the meeting and
01:26:24 meeting and i see mark harris i think was also involved in the meeting that um they were serious concerns so i think
01:26:31 think um possibly prior to this they they might have been seen as
01:26:41 causing trouble but a bit bit of an irritant rather than anything else i think following this meeting you could see that they're serious see that they've got a valid point and therefore
01:26:52 therefore we need to be working on it when you say prior to this they might have been seen as causing trouble by who who had thought i just think from probably from the sales team now if we remove to
01:27:04 team now if we remove to win text response now which is the next email up in the chain sent by paul savage the same day 22 11 we go up to the top
01:27:16 11 we go up to the top there we see his response and in essence i'll read it out to you paul savage urges kingspan to either have k-15 reclassified or conduct further fire testing
01:27:30 or conduct further fire testing um he does say um although i do appreciate that the scope of this specific standard is stated to exclude range screens and external render systems
01:27:41 external render systems which is what i pointed out to him in my email right so he says with regard to your comment in respect to not undertake an 8414 test although i do appreciate that the scope of this
01:27:52 do appreciate that the scope of this specific standard is stated to exclude rain screens and in external render systems i would ask how you intend to validate the use of k15 in conjunction with a steel frame system
01:28:03 conjunction with a steel frame system cement board build up as there appeared to be no test standard to cover this do you see that there
01:28:11 so what was the point you were making about the scope of 841 for part two had you tried to say that that was limited in some way yeah i think i'd i'd read that probably
01:28:22 i think i'd i'd read that probably for the first time for a number of years anyway i'd read the 841. part one and two um i think either just after his meeting or prior to the meeting
01:28:31 meeting and it clearly stated in this in the scope
01:28:35 scope that it was it excluded rain screens and external render systems so it was it was odd that that that the standard said that and i was i was pointing that out to paul savage and
01:28:47 was pointing that out to paul savage and stuart
01:28:48 stuart i see but he's going on isn't he and he's saying although he appreciates that he's asking how you intend to validate the use of k15 in conjunction with a steel frame system cement board buildup
01:29:00 system cement board buildup as that appeared to be no test standard to cover this so he's saying well even if you're right about that how are you going to validate that
01:29:07 that because there would be no test standard yeah i think he makes a good a good point
01:29:12 point yeah and then he says part b of the building regulation still requires that either a material of limited combustibility is used or a test to bs 8414 or bl-135
01:29:23 or a test to bs 8414 or bl-135 assessment is undertaken when used in instances over 18 meters high do you see that there
01:29:29 there yeah or an equivalent assessment body a sufficient bank of test data to provide yeah vr135 desktops when he's talking about a material being either of limited combustibility or used in the 8414 test by this time did you
01:29:41 in the 8414 test by this time did you understand what a material of limited combustibility meant i don't think i did in fact i think on my diary notes um which i'm sure you'll find it's it would be for this date 31st of october
01:29:52 would be for this date 31st of october well i'm being told they're not disclosed to us that that's oh um that was my understanding of what they were
01:29:58 they were well it could be if we asked for them could they yes i'm sure they could be um and i don't sorry if they are disclosed they've not been disclosed to core
01:30:09 they've not been disclosed to core participants sorry they've been disclosed to us but they haven't yet been disclosed to others right okay okay well let's just press on with this for a
01:30:20 let's just press on with this for a moment but i i there's actually a note to myself about check
01:30:25 check limit check limited combustibility so obviously i i wasn't clear about that and what date is that note made it's made on this day 31st of october 2013.
01:30:34 2013. right it's it's handwritten notes for the meeting and that's the first time you thought to check what limited combustibility meant is it well it's being raised with me and um i'm obviously reading his response i
01:30:46 um i'm obviously reading his response i presume
01:30:46 presume well no they must have said this in the meeting because i think they meet the notes are from the meeting and then he goes on generally wind tech is contractually obliged to ensure our clients building facades comply with building regulations
01:30:57 building regulations without documented proof we cannot do this for your k-15 board and then he says i do hope that you're planning to proceed with testing following your discussions with bre
01:31:09 following your discussions with bre as we stated bre have relayed to wintec that their view is that the test kingspan have already undertaken simply justifies that the construction tested complies with the requirements of bs-84
01:31:19 bs-84 part one only and that this single test cannot be used to infer that all other forms of ins construction including k-15 boards are also accepted do you see that and then if we go down
01:31:33 do you see that and then if we go down to the next paragraph he says until such a reclassification is confirmed all the provision of satisfactory test data is made available wintec cannot alter our position on the
01:31:44 wintec cannot alter our position on the use of this material for facades over 18 meters high and we'll have no alternative but to recommend to our clients that your k-15 board
01:31:52 board is not considered for such applications unless supported with appropriate project specific testing or a br 135 assessment and then he says during our meeting i understood that
01:32:03 during our meeting i understood that there is now a commitment from kingspan to undertake such tests and to provide the test data within a six-month period and then he says following completion of this period
01:32:16 if the situation remains unresolved wind tech will have no alternative but to make public our concerns to the industry at large this stance may not always be appreciated by our clients nevertheless we do take fire safety very seriously
01:32:28 we do take fire safety very seriously and of course have a deity of care to public safety with regard to the inconsistencies within 8414 other documents noted and poorly drafted clauses in it means adb i trust that the underlying
01:32:39 it means adb i trust that the underlying requirement of preventing the spread of fire
01:32:41 fire up building facades is clear and that kingspan will behave in a responsible manner to properly resolve the doubt over the use of k-15 and not be distracted by such inconsistencies do you see that there yes absolutely
01:32:53 do you see that there yes absolutely yeah now is this the reason kingspan then began a further program of testing in january 2004 2014 to bs 8414 part two that that's my understanding
01:33:05 part two that that's my understanding that this was yes so it's the threat of exposure to the wider industry that prompted that restarting of 8414 part two tests do you agree
01:33:17 part two tests do you agree no i think it's more a realization if if you like it at senior level that there was an issue here around the certification
01:33:28 here around the certification well dr rochford what i'm going to put to you is that you always knew there was an issue
01:33:32 an issue around the certification but the labc certificate had brought you time but when that expired and when consultants like wind tech started
01:33:43 consultants like wind tech started raising their concerns kingsman were forced into the position of having to start that program of testing again do you agree no
01:33:55 so why hadn't kingspan been testing to bs 8414 part 2 prior to this point what we had a few years earlier obviously um along with with other customers i
01:34:08 um along with with other customers i as far as i was concerned at this time you can see from my email i believed that the labc and bba certification was enough but we've just discussed that the only
01:34:19 but we've just discussed that the only thing that had to underpin it was a 2005 test that was on old technology k-15 i know with hindsight but at the time that was my that was actually what i believed
01:34:29 believed but can you accept that with hindsight that was wholly inappropriate to take that position to take what position sorry that it was appropriate to rely on that one single 8414 test from 2005
01:34:42 single 8414 test from 2005 on old technology k15 in a masonry situation
01:34:47 situation i i think it was it was with hindsight it was inappropriate to rely on um yes uh i do agree with that
01:34:58 yes uh i do agree with that but at the time my belief was that the certification from labc and bba gave us enough uh that satisfied the requirement yeah
01:35:09 that satisfied the requirement yeah you respond to paul savage the following day top of your email at page one and you say
01:35:18 dear paul i think you may have misinterpreted my response sorry if i didn't make it clear i will be discussing with the bre what is required and go with their recommendations i understand from either that tony bacon longer works in that area he recommended
01:35:30 longer works in that area he recommended i discuss the matter with his successor and then you say kingsman always acts in a responsible manner do you see that there yes do you stand by that comment is that your evidence
01:35:41 by that comment is that your evidence against band did always act in a responsible manner that was that was my my belief why not tell wintec about the new technology k15 and that
01:35:52 about the new technology k15 and that you'd had no relevant fire test results since developing that new product because i that was my belief i believe that the
01:36:01 that the uh labc and bba certification uh was enough um but now he's drawn it to my attention um we want to do the further 8414
01:36:15 um we want to do the further 8414 part 2 testing
01:36:21 what consideration did you give to the issues of public safety that wintec had raised
01:36:27 raised well obviously do you take it seriously yes how did you satisfy yourself at that stage
01:36:33 stage in 2013 that safe advice clear and accurate advice was being given about the use of k-15 on buildings over 18 meters
01:36:44 again as as far as i was concerned that the
01:36:47 the advice being given was to um skilled people and giving them the information that we had available so
01:36:58 available so as far as i was concerned they each system that was was um designed and put into use was appropriately designed
01:37:09 you said that you were you now were aware that you needed to do more tests um after this um exchange with wintec did you do anything about the fact that
01:37:20 did you do anything about the fact that no one had thought to draw this position to your attention before october 2013. uh no i don't think i did uh i think that the conversation with wintec
01:37:33 that the conversation with wintec probably started with it in july 2013 didn't it
01:37:36 didn't it in terms of the the key clad
01:37:40 did you do anything about the fact that no one had thought to draw this position to your attention before wintec did i mean it doesn't matter when they did but dude because sorry sorry i didn't mean to
01:37:52 because sorry sorry i didn't mean to interrupt um no because my understanding was that um the labc and bba certification was was sufficient um and clearly
01:38:04 was sufficient um and clearly wintec had a problem with that uh they weren't going to recommend our products it made sense to to to
01:38:11 to to do the 8414 part 2 testing so is it fair to say that the position was this you didn't fully understand on what basis the labc certificate was based but you were nevertheless happy
01:38:23 nevertheless happy to rely upon it when it came to exchanges like this for this particular exchange i was because i wasn't i i definitely wasn't um talking to someone who was
01:38:35 who was unaware of the situation these were experts in in the area so i knew that anything i said would be analyzed extremely carefully by by wind tech i would not normally get involved in in
01:38:48 i would not normally get involved in in these kind of discussions with customers or specifiers it wasn't it wasn't my area of expertise
01:38:57 but sorry i'm going to put that to you again was the position this that you didn't fully understand on what basis the labc certificate was based but you were nevertheless happy to rely on it when it came to exchanges like
01:39:08 on it when it came to exchanges like this with wintec because i believe the labc certificate was correct even though you didn't fully understand on what evidence it was based as i said before i trusted the technical
01:39:20 as i said before i trusted the technical team to
01:39:21 team to advise me correctly on that okay let's move on now to the tests of 8414 part 2 which were carried out by kingspan in 2014. would you accept that this
01:39:34 2014. would you accept that this exchange with wintec had placed kingspan under some pressure to provide evidence from testing to 8414 part 2 on systems incorporating k15
01:39:45 part 2 on systems incorporating k15 i think it had certainly focused our attention
01:39:50 were you also aware in late 2013 of some pressure on exactly the same topic from the nhbc
01:39:59 i know that there were some discussions with nhbc i don't know how aware i was of as a detail of those discussions
01:40:07 did you know that there was some pressure being exerted by the nhbc on exactly the same lines as that being imposed by wintec i i don't know that it was on
01:40:18 wintec i i don't know that it was on exactly the same lines but i i was aware that there was discussion with the nhbc yes and were you aware that the nhbc had raised concerns about the use of k-15 on buildings over 18 meters well i was
01:40:30 on buildings over 18 meters well i was aware of that from the exchange with wintec they pointed it out
01:40:36 out now you've explained in your witness statement that following the meeting and the exchanges with wintec in late 2013 kingspan decided to embark on a program of testing to 8414 part two on systems incorporating k-15
01:40:48 incorporating k-15 sorry where is this um see i haven't got a reference for that but you explain in your statement that there was
01:40:55 there was this program of testing in 2014 can we look at a spreadsheet which has been produced for the inquiry by kingspan
01:41:05 kingspan if we go to kin three zeros two two three five seven
01:41:14 so what happened is the inquiry began asking questions of kingspan about exactly what k-15 product had been tested during each test to bs 8414
01:41:27 during each test to bs 8414 and this is the schedule dated the 31st of january 2020 that kingspan then provided have you seen this spreadsheet previously i've seen it previous to this hearing
01:41:39 i've seen it previous to this hearing i hadn't seen it
01:41:44 i don't think i'd seen this during my time at kingsman we can see that the columns along the top give us the test date the sponsor the details of the system tested
01:41:55 the details of the system tested etcetera and then in the sixth column the properties of the tested insulation product do you see that there yes and in the seventh column it also gives details of whether the
01:42:06 it also gives details of whether the tested insulation product was the same as k-15 being offered for sale by kingspan at the time yes and do you agree that that was an important
01:42:15 important um question whether what was being tested was the same as what was being sold
01:42:19 sold yes
01:42:23 and in your witness statement for the transcript this is paragraph 11.23 on page 51.
01:42:31 page 51. you say that you would have expected any reliance on an 8414 report to make clear if the product was materially different from that which was being sold is that right it sounds right which
01:42:43 is that right it sounds right which where was the sorry it's um paragraph 11.23
01:42:46 11.23 in your witness statement page 51 in the last two lines yes yes i would have expected any
01:42:58 yes yes i would have expected any reliance on an eight for one for two report to make clear if the product was materially different and you mean clearly different to that which was being sold yes yes
01:43:13 and would it be right that if a trial product was being tested to 8414 and therefore was being specifically manufactured for the purpose of testing all those within kingspan who were involved in the
01:43:24 within kingspan who were involved in the production of that sample and the testing itself would be aware that that was the case yes i would think so yeah yeah and you as technical director in terms of
01:43:35 you as technical director in terms of the very least budget planning would have been aware of the costs associated with such testing is that right
01:43:40 right i would have broadly the the budgets were planned um at the beginning of the year or before the beginning of the year yeah and uh some allocated for testing which would cover a number of tests yeah and where
01:43:51 cover a number of tests yeah and where you were where in 2014 that there was some budget allocated to producing trial samples of k-15 for the purposes of testing yes yeah now
01:44:04 yes yeah now in this spreadsheet um
01:44:08 we can if we go back to that spreadsheet sorry kin30s22357
01:44:17 if we go on to page three we see the first of the four 2014 tests 7th of january 2014. do you see that there yes and we can see that the system
01:44:29 yes and we can see that the system tested in the third column is eight millimeter trespa fr high pressure laminate do you see that there hpl and the properties of the insulation
01:44:40 and the properties of the insulation tested are said to be unknown do you see that there yes can you recall what the insulating product tested in that january 14 test was no i think it might have been
01:44:55 um i'm just trying to think i think this might have been a
01:45:00 well it would be speculation it could have been a blowing agent i know we were looking at solstice product at the time yes the solstice comes in i think in the next um in the next two tests but i can't
01:45:13 um in the next two tests but i can't recall what it was let's go to an internal presentation now
01:45:20 kin3021945 which appears to be an internal presentation prepared by mr meredith in may 2015
01:45:28 may 2015 called the facade insulation solution did you see that there and if we can go to page 17 there's a timeline of testing to date
01:45:39 17 there's a timeline of testing to date do you see that there yes and the january 14 test is the third one up from the bottom yep and can you see it says there um kingspan the thickness is 80 millimeters
01:45:53 kingspan the thickness is 80 millimeters and it says k15 25 micron unperforated on the formula facer do you see that yes does that um help with your recollection that that
01:46:04 um help with your recollection that that was um
01:46:05 was um carried out on standard k-15 foam as sold but with a non-standard unperforated foil facer
01:46:14 if if that was what it was then obviously it's correct i i can't we can't recall from the time what was tested
01:46:22 tested i know a number of things were tested yeah
01:46:25 yeah we can just look at some email correspondence from the time between you tony milicep mr davis and iva meredith this is at kin3021095
01:46:37 if we go to the end of the document at the end of the email chain at the bottom of page two is from mr meredith there on the 9th of january 2014
01:46:48 january 2014 1735.
01:46:52 do you see that there where he says if you look to the back page is that the one you mean yes if you look to the back page you'll see where the 15-minute reference comes from
01:47:03 15-minute reference comes from do you see that there yes and then
01:47:12 i think there's an is there a note at the bottom of this page that says the entire message is not included do you see that there but there seems to be some discussion going on about that january 2014 test it's just two days
01:47:25 january 2014 test it's just two days after that test right and and just above mr meredith's email and all we have of it is that you send an email saying that implies we
01:47:36 you send an email saying that implies we only just failed regards malcolm do you see that yes why did you say that well i if i see the subject of iva's email below he's got the subject 15 minutes so
01:47:49 he's got the subject 15 minutes so i assume he's drawing something to my attention well mine tony's gwins and lindsay's about the
01:47:57 the performance of the system at 15 minutes yeah and my comment there suggests um that having a
01:48:09 suggests um that having a look at the whatever he sent um it would have been in less than an hour um my conclusion was that
01:48:20 that it looks like um we only just failed to i
01:48:23 i i assume i was looking at the 600 degree um limit to whatever that i've forgotten the height now but yeah the height that's at it yeah mr meredith then responds to you on
01:48:35 yeah mr meredith then responds to you on the 13th of january if you look at the bottom of page one
01:48:42 and he says you can see in the first line he says from the external temperatures it does look very close do you see that there
01:48:50 there the temperatures in the cavity were a little higher but still close to the 15 minute window and then he says ideally we need to pass with a 10 window for assessment anything too close will be impede will
01:49:01 anything too close will be impede will impede the bre's ability to provide practical test assessments do you see that there and then what he does he he says at the bottom of that page it's
01:49:12 he says at the bottom of that page it's with the above in mind and after an extensive review of the test video and data
01:49:16 data we're looking to propose consider the following and what he does is give a detailed list of modifications which could be made to try and achieve a pass
01:49:27 pass do you see that there and there are six listed yes and one of the things he says there at five is adopt modified k-15 solstice referred discussions in
01:49:38 solstice referred discussions in meeting do you see that and then as soon as this is made if i can get samples for o2 index and calorimetry of any variants of the solstice board we should try and
01:49:49 of the solstice board we should try and get them twix over quickly to see if there's any difference in initial flammability calorific output do you see that there yes yes now can you help us as to what previous discussions he's referring to there about
01:50:00 there about k-15 solstice uh no it must have been one of the options looked at for improved performance in this test i assume
01:50:10 assume and what is k-15 solstice i think we we were looking at a blowing agent in those days and and the hope was that that would become the blowing agent i think for k-15 in the future
01:50:21 think for k-15 in the future yeah and that was called solstice it it was a new generation um blowing agent uh it was um i i can't remember exactly but uh hydro
01:50:33 i i can't remember exactly but uh hydro fluoro olefin i think so which meant it was unstable in the atmosphere and would break down quite quickly
01:50:38 quickly yeah but the advantage was it gave a um an improved lambda valley improved installation value and also i believe it was slightly less flammable as well
01:50:50 as well yeah so it had better environmental credentials in terms of its ozone depletion no they were no better um that the the hfcs and hcfcs were phased out because they
01:51:02 and hcfcs were phased out because they had ozone depletion potential yeah so anything introduced after that including ipc ipm uh pentanes didn't have any ozone depletion potential and it was a liquid blowing agent is
01:51:14 and it was a liquid blowing agent is that right yes these these were fluoridated hydrocarbons that uh were engineers so they didn't have an ozone depletion potential yeah and so
01:51:25 depletion potential yeah and so it's right isn't it that mr meredith was proposing that case kingspan used solstice blown k15 in the next test
01:51:32 next test to 8414 but first he wanted to test samples of that at xovo is that right that seems to be what he's discussing here and then if we move up the chain on page one you respond as follows
01:51:46 uh in the middle of that page so in that evening 2129 you say either agree with all
01:51:53 with all except move to solstice as rest are merely tweaks to the test suggest any recipient calls me back to discuss rather than email correspondence which will get too complicated regards
01:52:04 which will get too complicated regards malcolm do you see that there yes
01:52:09 and is it is it right that you did not agree with the move to solstice blown k-15
01:52:15 k-15 i think for this test i was keen to try and get something that was the same as the product that was on on the market which would have been the
01:52:26 on the market which would have been the um
01:52:26 um presumably the one that was tested and the move to solstice well there were a number of implications one it wouldn't have been the one product on the market and um which meant that we would have to
01:52:37 and um which meant that we would have to introduce a completely new product then yes salsas blown and it was very early days if i remember correctly with our investigations into solstice so
01:52:48 our investigations into solstice so i don't think i was certain that it would be viable you might test something that actually doesn't you can't commercially supply yeah
01:52:57 why did you want to call back rather than a discussion over email correspondence well i think it's obviously ivor's put a number of
01:53:06 number of um possibilities including solstice so it was it was well let's let's talk about what what is possible and what what isn't possible and the trouble is these
01:53:18 possible and the trouble is these email um chains go on and on forever and yeah if we move up the chain towards the top of page one there are two emails between mr miller chap and mr meredith into which
01:53:30 miller chap and mr meredith into which you're not copy just to be clear yeah and the first is from mr miller chapter ivan meredith and he says malcolm's response was cryptic let me know his thoughts over the solstice element
01:53:41 element and then at the top of the email chain mr meredith responds will do he's in meetings today also i edited your comments as i thought he would be concerned over us putting too much in black and white
01:53:52 much in black and white do you see that there yes
01:53:58 now were you concerned about putting too much in black and white on this issue i don't know what he was referring to in terms of the comments um
01:54:10 edit your comments i have no idea what those comments were and when we're not we can't see them so i don't know can i just show you a passage in mr meredith's oral evidence now
01:54:21 meredith's oral evidence now at day 76 page one two two picking up at line four
01:54:36 picking up at line four so um at line four i say okay and did you ever get a clearer picture as to why he didn't want to discuss this in email correspondence he says it will get too complicated
01:54:47 he says it will get too complicated there but did you ever become aware that there was another reason for and then he said malcolm was always very reserved about what we put in writing
01:54:54 writing i think i was told off a few times for maybe too illustrative in emails really and then i asked why was he more reserved about what you put in writing and then he says he'd been through he'd
01:55:06 and then he says he'd been through he'd been through a large legal case with rockwool i think yes and you know he knew how these things could potentially be taken out of context and come back to bite you basically
01:55:16 basically and then the question was that when there was an action by kingspan against rockwell in relation to how it represented its products yeah yeah yeah that was the case yeah he'd been through that
01:55:27 he'd been through that yeah and he was what worried about committing things to email and then he says i think that might be what he's referring to here yeah do you see that there yes
01:55:42 and then if we just go over the page to the next page
01:55:51 um if we go above this i ask him about the tony miller chap and then i say so does that go back to and then he says that verifies what i
01:56:02 and then he says that verifies what i was saying before yeah yes that you were aware that mark and rochefort did didn't like you putting too much in writing about this and then we've got witness nods because he was nervous about this
01:56:13 he was nervous about this about if this ever came out yes potentially yes yes i agree do you see that there yes now is that right that you'd been through the experience of being involved
01:56:24 through the experience of being involved in
01:56:25 in the case uh a civil case kingston against
01:56:28 against rockwool i'd been in that and i've been in a case in um in the states as well um and had that made you nervous about committing um
01:56:39 committing um matters in writing i think i think what he says there is correct i was a bit nervous about what you put down in in emails but um it was on this particular occasion i
01:56:50 it was on this particular occasion i wasn't sure what they could have said that would have been um would have given me problems it was more a question of uh let's get to um the bottom of this
01:57:01 uh let's get to um the bottom of this particular issue that we're talking about which was the next the testing regime was one of the reasons you were nervous because that email chain was illustrating that k15 had not yet passed an 8414 part
01:57:14 that k15 had not yet passed an 8414 part 2 test and you were looking at research and development products to try and pass
01:57:21 i was looking at research and development products to try and pass that that's that's correct that's one of the things we were doing was definitely that um but that wasn't wouldn't have been why i was
01:57:32 why i was nervous about it on that particular occasion though if we can go back to kingspan spreadsheet now at kin3022357 and i want to look at the next test to
01:57:43 and i want to look at the next test to 8.14 part 2. this is in the middle of page 3. this is on the 19th of march 2014.
01:57:51 and it would appear that this test was um not classified to br135 do you remember that vaguely yes
01:58:04 and in this instance kingspan have confirmed
01:58:08 confirmed we're in that column the six column along properties of the tested insulation product that this test was not carried out on the k-15 which was being sold but on a trial product do you see that yes and the properties
01:58:21 do you see that yes and the properties of that tested insulation are listed as thickness 80 millimeters foil unperforated 50 micron or 100 micron foil do you see that there yes whereas the standard k15 had a 25 micron foil
01:58:34 the standard k15 had a 25 micron foil face it didn't correct yes and it also says core r33 r330 uf1 calcium carbonate and polyol blend
01:58:45 blend added alternative blowing agent do you see that there yes and was that the solstice alternative blowing agent i assume it was like that's what was being looked at at the times i was
01:58:56 being looked at at the times i was saying it was a blend of sources of some sort
01:59:01 yeah and presumably the fact that the k-15 foam used in that test was made using a different blowing agent was not a surprise to you given the correspondence you'd had with mr
01:59:13 correspondence you'd had with mr meredith
01:59:14 meredith about that very correct in fact the fact that they were looking at that i mean it was a it was a logical thing to do to look at different formulations that might give you a different result in in a system test this test is not
01:59:27 in a system test this test is not mentioned in your witness statement can you help us as to why that why that is i
01:59:34 um was i even
01:59:38 i don't know why it isn't mentioned but i don't know that i was particularly aware of this i know i knew that there had been some tests
01:59:49 had been some tests did i mention the january one as well i can't remember we'll check we'll check that i mean i'm writing his witness statement five years after i've left the company so yeah i'm relying on looking through a
02:00:00 so yeah i'm relying on looking through a load of old documents let's look at some correspondence after the test kin30s21907
02:00:11 and if we can scroll to the email at the bottom of the chain second email on page three we can see on the 25th of march stephen howard of the bre is informing mr
02:00:22 howard of the bre is informing mr meredith in respect of the test and he says that um in the first line i discussed the test with phil and the current status is that you do not have a clear past do you see that there
02:00:33 clear past do you see that there yes and then on the same day um mr meredith
02:00:37 meredith forwards that message to you tony milichap and a number of others that's the bottom of page two top of page three
02:00:47 right right at the bottom there yep
02:00:53 and then um going up then to mr meredith's email at the top of page two on the 31st of march 2013 at 13 23 he says this he says initial feedback
02:01:04 23 he says this he says initial feedback from the bre is that this test did not meet the requirements of br135 third edition this is my name is the end of this as we'll be challenging this opinion and doing everything possible to get something usable out of the testing
02:01:16 usable out of the testing whether this be an assessment for a different cladding or a shorter build do you see that there yes yeah this the test
02:01:23 test says in the next paragraph is being dismantled this week so hopefully we can demonstrate very little flame spread on the k-15 and this will support the counter argument that we are preparing
02:01:34 counter argument that we are preparing yes and he says as as mentioned we've got a meeting with tennos arab ifc trespa plan to analyze what we've learned so far in the next paragraph and then he says this i spoke to malcolm on friday about
02:01:45 this i spoke to malcolm on friday about this and he advised we should proceed with the non-combustible terracotta cladding
02:01:50 cladding following this news from the bre are we all still in agreement in respect of this do you see that there yes and do you remember speaking to him about saying well let's do the terracotta cladding next i
02:02:01 do the terracotta cladding next i don't remember speaking to him but on the other hand this is quite a credible you know it's incredible statement yes it would have been it would have been the way i was thinking in other words if
02:02:13 the way i was thinking in other words if if the trespa was a narrow failure yeah um then the logical thing was to
02:02:19 was to look at the um the terracotta the terracotta yeah which is what we see you end up doing and then in july in the third test in 2014 which we'll come to that's the terracotta test
02:02:30 come to that's the terracotta test and then he says i shall know by the end of the week when i will need the insulation for the next test by however the question remains about the insulation we choose to use is it possible to share the calorimeter
02:02:41 is it possible to share the calorimeter results of the solstice versus standard versus phosphoric that we performed at ftt last week do you see that there yeah does this support our views on the flammability calorific content of the
02:02:52 flammability calorific content of the different
02:02:53 different phenolic foams this would be good to look at alongside the video do you see that there yes
02:03:02 and at this point do you agree that you are one of the people who are directing the the testing strategy
02:03:09 strategy you're discussing with mr meredith what you should test next having had this fail yeah i think at this stage we're all we're all looking at uh
02:03:20 at uh what what we should be testing and did you understand the basis on which the result of this test was going to be challenged i assume i don't understand i i
02:03:34 i assume i don't understand i i cannot now recall what the detail was but i assume from the earlier comments that i
02:03:39 that i had made this was the one that that narrowly failed so i don't i don't know um uh exactly what was going to be challenged and did you know what he
02:03:50 challenged and did you know what he meant by doing everything possible to get something usable out of the test that's the second line first paragraph uh yes i don't know
02:04:01 uh yes i don't know what exactly he meant from that now
02:04:04 are you aware that the test data from this test was used despite the fact that the tested system wasn't classified to br 135 it was used in a number of desktop assessments
02:04:15 assessments for systems incorporating k15 were you aware of that i don't think i was aware of that no
02:04:22 presumably uh it wasn't claimed that it it passed the br135 was it well there was a dispute between kingspan and the bre
02:04:34 about whether it had passed and a complaint was lodged about it um if we go up the chain a little further up page on page one at the bottom half of the page there's an email
02:04:46 bottom half of the page there's an email from gwyn davis sent on the 31st of march 2014 at 13 1346 he starts off saying surely we risk making fools of ourselves trying to quarrel with them
02:04:57 quarrel with them based on an earlier edition of the br135 i feel we need to understand why they are terminate terming this or fail and how they've come to this decision and then discuss internally the counter
02:05:08 and then discuss internally the counter to this and meet with phil and stephen do you remember that what kings fan were trying to say is well because the old br135 standard didn't make it clear that the full 60 minute test duration was
02:05:19 the full 60 minute test duration was relevant to the the past fail that somehow you could go back to that old standard
02:05:26 standard i think that now you mention it i think that that does sound familiar yes yeah and then at the top of this chain tony miller chap says this same day 1401 he says oh let's not
02:05:40 same day 1401 he says oh let's not forget
02:05:41 forget we are carefully pushing for bre for the result typically this is not issued without the full report after four to five weeks in the short term we are just trying to understand our options whilst waiting
02:05:52 understand our options whilst waiting for the full data and trying to sow some seeds to influence that result what did you understand him to mean by that so some seeds to influence that result
02:06:02 result sorry i've just missed that sorry it was said
02:06:05 said oh yes in the first paragraph second line yeah first paragraph and into the third line
02:06:13 do you remember being aware of him saying that
02:06:18 i assume he it's it's one of the bits of information he wants to use to the bre in trying to convince them that that it would be appropriate to
02:06:29 that that it would be appropriate to issue a br135 on it yeah he then goes on in that same paragraph
02:06:34 paragraph in the last sentence to say this in the event we do not get what we aim for stronger tactics will be employed do you see that there
02:06:45 see that there yes what did you understand him to mean by that stronger tactics will be employed well i think he goes on to say i will current concurrently employ our solicitor to ensure they're fully briefed to support a challenge or defend any
02:06:57 to support a challenge or defend any against any ongoing contracts so that those are the stronger taxes i assume that's what he means yeah to get to get lawyers involved and defend yes
02:07:08 defend yes i see did you consider that to be an acceptable response to the bre at the time i assume that either
02:07:19 assume that either and tony felt aggrieved that they had performed
02:07:22 performed a test which on the older version of the br 135 would have passed uh and that because the br 135 had been
02:07:33 and that because the br 135 had been reissued uh it now failed so they felt aggrieved at that and they were looking at ways at which they could be challenged like it's understandable why they would be doing it
02:07:44 be doing it yeah did you ever object to that at the time
02:07:47 time i didn't no
02:07:51 was there any discussion in early 2014 and following these tests in january and march about the risk to public safety in promoting k-15 for use over 18 meters
02:08:02 in promoting k-15 for use over 18 meters were you ever involved in such discussions no not not with public safety again at this point my assumption is still at the labc
02:08:12 the labc and bba certification is can we go now to kin403862 this is an email from you to mr miller chap
02:08:31 it's from it's from you to peter wilson mr meredith mr miller chap do you see that there on the 28th of april yes
02:08:44 yes i think i'm framing a letter to send to
02:08:48 to wintec because we'd said we'd be doing something in six months and it was to say well look we basically we have done something i don't think it's claiming that yes well let's look at what you say so
02:09:00 yes well let's look at what you say so you say
02:09:01 you say um dear paul so this this appears to be a draft email back to win tech as you've said
02:09:06 said it's been a while since we communicated and i thought i should give you a quick update
02:09:10 update further to our meeting last october we have been conducting some further testing with the bre on bs 8414 part 2 using call firm k-15 as you're probably aware tests take
02:09:21 aware tests take quite a long time to set up and complete with the bre partly because they appear to be quite busy with large-scale fire testing at the moment and then you say this the test we recently conducted incorporating a
02:09:32 recently conducted incorporating a trespa 18 millimeter cladding system met the criteria for approval under br135 and xb particularly with respect to the b2 requirement where the level 2
02:09:43 requirement where the level 2 thermocouples did not exceed 600 degrees within 15 minutes of the start time and the test was run to completion we're currently in discussion with the bre and have had further testing planned
02:09:54 bre and have had further testing planned now that must be a reference to the test carried out on the 19th of march 2014. is that right i think it must be yes it can't be the january 14 test because that was an eight
02:10:05 14 test because that was an eight millimeter trespa panel i don't i don't think it is um now you knew by the 28th of april 2014 didn't you that the bre had confirmed
02:10:16 didn't you that the bre had confirmed there was no clear pass that's right isn't it
02:10:19 isn't it i don't know that i'd no i don't know that i didn't know that actually well you knew that from the email chain we've just looked at from the 31st of march 2014 where stephen howard told kingspan they do not have a clear
02:10:30 told kingspan they do not have a clear past do you remember that was forwarded to you
02:10:32 to you yes i know i i understand that but i also understood that tony was challenging that so that was the situation as far as i was concerned and
02:10:44 concerned and okay we could argue with the reasons he's challenging it he's using an old br135 um
02:10:51 br135 um but it seemed to me he did have some justification for challenging it and i think
02:10:55 think what i was doing here was um updating wintec
02:11:00 wintec really saying look we're not doing nothing we're still working on it uh and and this is this is a situation and i do say we're currently in discussion bre and have further testing planned and
02:11:11 bre and have further testing planned and in
02:11:11 in active construction that's also correct yes but
02:11:14 yes but you said you knew that it was being challenged and in those circumstances how did you come to write the words at the beginning of that second paragraph the cladding system met the criteria for approval
02:11:26 system met the criteria for approval under br135 you knew that that wasn't the position the bre had taken didn't you obviously that wording comes from someone suggested that wording to me but it would have been based on the earlier
02:11:38 it would have been based on the earlier br 135
02:11:40 br 135 um standard i i assume um incidentally this is just a draft email
02:11:47 email and i i don't even know it was ever sent was it
02:11:50 was it well that may be the case but i just want to ask you when you drafted this why you put in the words met the criteria for approval under br135 when
02:12:01 criteria for approval under br135 when you knew that there was a dispute going on and that the bre's position was that it was a fail well i think that was our position that it had met the criteria um as you can see tony was even
02:12:14 criteria um as you can see tony was even considering um a legal challenge on it so that was our position that it had met the criteria so why didn't you say that to to wintec why didn't you say we've just done a test
02:12:25 done a test it was close we're challenging the results the bre don't think it's a pass but
02:12:30 but we're challenging that why not say that that was the accurate position wasn't it i think that that could have done it wasn't i was running this past a number of people
02:12:40 of people and asking for advice on how it would be worded
02:12:43 worded i see and you can't help us as to whether this email was actually sent i i don't know if it was ever seen okay
02:12:51 moving on then to the july 2014 test um if we can go back to that spreadsheet
02:13:01 three five kin3022357 in the last row on page
02:13:05 page three
02:13:07 three [Music]
02:13:11 we can see it tells us 7th of july 2014 kingspan insulation limited and then we can see it was a terracotta tile you see under system tested
02:13:22 you see under system tested yes third column and we can see it was a pass this time do you see that there yes and then we can see in the six column properties of the tested insulation product
02:13:32 product it says trial product thickness 80 millimeters foil perforated and unperforated 50 micron
02:13:44 unperforated 50 micron yes and then if we go over the page 50 micron foil and then the core we've got the same description of the core as with the march test including alternative blowing agent do
02:13:57 including alternative blowing agent do you see that there yes and would that have been again the solstice blown blowing agent i i believe it was a solstice blind yeah yeah i know there was some dispute over whether it was a 50 micron or 25 micron
02:14:09 whether it was a 50 micron or 25 micron because i think gwyn thought it was a 25 micron and and he was the one supplying the sample but
02:14:18 that one i don't know that um did you ever get to the bottom of that no i don't think that they got to bottom up but presumably by the time this um table was produced uh kingspan was convinced that it was a 50 micron
02:14:30 convinced that it was a 50 micron i assume because they put that in yes that's back if we go back um to the bottom of the table that we were just reading from they've and it says perforated and unperforated
02:14:41 unperforated yes what was your understanding about whether or not it was a perforated or unperforated or indeed whether on one side it was perforated on the other it was not well i think i can't i
02:14:53 well i think i can't i don't know i never saw the samples but um at some stage we were producing uh a k-15 product that was perforated on one side and unperforated on the other side
02:15:03 side so i do know that had been done in the past
02:15:06 past yeah but again this was a trial product and i think i think you tell us that in your witness statement if we look at paragraph 11.23 of your statement on page 50
02:15:16 page 50 yep yes
02:15:21 11.23
02:15:26 you say um you became aware of some discussion and you say the in the third line down on the right hand side i had been under the impression that the successful part two tests had been conducted on a
02:15:39 part two tests had been conducted on a development k15 product using a 50 micron phaser yes that's correct so it's a development trial product yes yes and it wasn't the product that was being sold therefore
02:15:50 being sold therefore no
02:16:01 if we then go to some emails um
02:16:08 in november 2014. if we could go to kin 3021904 and look at the top of page one
02:16:23 i think that's where we're seeing where you've got that and your in your statement do you see that there either i was also strongly under the impression that the latest successful part 2 test used 50 micron phaser do you see that
02:16:35 used 50 micron phaser do you see that there yes you discussed this face to face
02:16:38 face with gwyn in the office and we also discuss at the next fire focus group meeting
02:16:42 meeting but limit email corres conversation do you see that there why did you say that to mr meredith in this email but limit email correspondence well if
02:16:54 but limit email correspondence well if you look at the previous the previous couple of pages i think it is you've got iva saying it was 50ml me chipping in i thought was 50 mil adrian saying he thought it was 50 mil and gwyn store that it was 25 mil
02:17:06 50 mil and gwyn store that it was 25 mil and it seemed to me that that was not resolvable on um an email ping pong system so it was better that either spoke directly to gwyn and and
02:17:17 either spoke directly to gwyn and and that's why i'm saying face to face and you know we don't want any more of this i see yes
02:17:24 i see yes going on and and i just want to move now to my final topic which is about king spans dealing with the nhbc which is a short topic
02:17:35 is a short topic um you deal with the subject of the nhbc in response to the inquiry's questions in section 10 of your witness statement which starts on page 42. if we could go to paragraph 10.2
02:17:47 if we could go to paragraph 10.2 on page 42.
02:17:54 you say at the top there as far as i can recall kingspan regarded the nhbc as playing a critical role in the sale of certain
02:18:01 certain insulation products to construction areas
02:18:04 areas it was seen as critical to ensure that the nhbc was content with kingspan's products in order to maximize sale of those products into construction areas in which nxbc played a role do you see that there
02:18:15 played a role do you see that there yes did that include k-15 i assume it would include k-15 yes and you go on to say later in your statement that your recollection is that you weren't involved in any meetings with the nhbc is that right
02:18:28 any meetings with the nhbc is that right that's my recollection yeah
02:18:31 and you've also said uh over on page 43 of your statement paragraph 10.4 that you were not involved in any internal meetings about the nhbc and the use of k-15 is that right
02:18:45 use of k-15 is that right as far as i recruit i was not involved in any meetings relating to k-15 and ambus and the hbc though i did receive email correspondence from my america regarding
02:18:56 correspondence from my america regarding a meeting
02:18:56 a meeting he held with the nhbc in august 2014. yeah
02:19:01 yeah if we can just look at an email from august 2014 which i think is what you're referring to there kin3020736
02:19:17 this is an email from mr meredith 21st of august 2014. we can see the subject is comment required by monday 5pm please k15 update do you see that there
02:19:30 please k15 update do you see that there in the subject oh yes it's the heading isn't it and you're one of the recipients of this email yes and then and he says um in the first paragraph as
02:19:41 and he says um in the first paragraph as the key stakeholders for the current cool them k15 fire certification issues i've taken five to update you all on the current situation since our last meeting do you see that there yes and so
02:19:54 yes and so is that right did you regard yourself at the time as one of the key stakeholders for the current call firm k-15 fire certification issues uh yes i would have been and i'm just
02:20:06 uh yes i would have been and i'm just looking at the list there's probably everyone there might have been a few others as well but
02:20:12 under that heading that first heading nhbc
02:20:15 nhbc bca do you see that there at point one of his emails he writes this a meeting has been held with the nhbc who are still pushing for someone to provide a job specific test data yeah to provide
02:20:28 specific test data yeah to provide job-specific test data they are still sanctioning the use of k-15 as long as they get a bespoke letter off kingspan which technical projects are turning around in 48 hours on
02:20:40 turning around in 48 hours on receipt of the drawings and confirmation of the fire barrier dimensions [Applause] and then he says they have also given us an extra three months to get some further assessments on the test data to meet their needs
02:20:52 meet their needs and then he says we have also requested two week notification if they decide to change their stance do you see that there
02:20:59 there yes did you authorize those bespoke letters which were being turned around in 48 hours at that time no i i wouldn't have seen them many i would i wouldn't be aware of
02:21:10 them many i would i wouldn't be aware of the detail in those at all who was signing off on those as far as you understood it um
02:21:30 as long as they get a bespoke letter of kill which technical projects are turning around let's see the drawings or if it says bespoke letter it must be someone in the technical in
02:21:41 it must be someone in the technical in our technical department is providing it with them
02:21:44 with them um so it presumably would have been tony milicep or either yeah did you ever check any of those letters yourself i don't think so no right
02:21:55 i don't think so no right and then if we can look at point six at the bottom of page two of this email it's a long email
02:22:05 he writes this he says we've issued a couple of standard letters to the larger contractors praters lakesmere etcetera and confirming our good news confirming pending reports and a more general letter confirming
02:22:17 and a more general letter confirming test success these are being used by technical and sales for job-specific queries which we are targeting handling within 48 hours of receipt tony malcolm i've not written to stuart
02:22:29 tony malcolm i've not written to stuart taylor at wintec has this been done do you see that there i do yeah do you know why this was being done issuing standard letters to the larger construct
02:22:39 construct contractors confirming good news and a more general letter about test success
02:22:45 success do you know why that was being done i don't know but i know there was quite a lot of discussion at the time about um
02:22:53 about um introducing the solstice blowing agent as a as a new product uh so i'm assuming this is about the uh the new version
02:23:05 uh the new version of the product which would have solstice blowing agent involved yes you and mr meredith knew at the time that the july 2014 test had been carried out on a trial product
02:23:16 trial product but that was not on the k15 which was being sold by kingspan and actually used on projects was it not at this point no no but i think that was tested in april
02:23:29 no but i think that was tested in april 2015 wasn't it
02:23:32 but you were the technical director at this at this time and you can see that reliance is being placed on that test success which was on a trial product can you explain how
02:23:44 trial product can you explain how you were comfortable with that i think that
02:23:48 that i assumed maybe wrongly that they're talking about a new product would be
02:23:55 will be produced based on this on this blowing agent configuration yes but you can see that they're sending letters including
02:24:06 they're sending letters including technical and sales job-specific query letters which they're handling within 48 hours of receipt so they're turning around these letters recommending k15 within 48 hours
02:24:18 recommending k15 within 48 hours how were you comfortable with that when you knew that the only success you'd had at that time was on a trial product and not the k-15 you were selling well again i i think i would have been
02:24:30 well again i i think i would have been relying on the fact that the labc certification was was covering us by this time sorry by this time the lab had you finished what you wanted to say um
02:24:43 but in this particular case um
02:24:49 it doesn't say what these letters are going to contain in them so i'm not quite sure what they are was speculating when i said it might be about the solstice product i don't know what it what these letters were about
02:25:02 were about sorry i shouldn't have interrupted you but by this time the labc certificate saying that k-15 was a limited combustibility product was long expired so you couldn't be relying on that could you not if it was expired i couldn't be
02:25:15 you not if it was expired i couldn't be no
02:25:15 no no so are you saying that you simply weren't aware that k15 was being recommended on projects at that time and that
02:25:28 on projects at that time and that somehow what was being said here is that you might be recommending a future solstice blown product i that that could be what was implied by that um
02:25:39 that um by that paragraph but i don't know did you ever check i don't think i did know
02:25:45 know why not you're the technical director why do you not check that you're not selling k15 on the basis of test data that's irrelevant because it's based on
02:25:57 that's irrelevant because it's based on a trial product i didn't and
02:26:04 maybe that was a mistake but i would have looked at the whole i think i would have been looking at this email rather long email from um iva and i would have been
02:26:15 um iva and i would have been highlighting to myself things that were of interest i would have seen the comment at the bottom tony michael i've not written to stewart tater at wintec as it's been done and i probably would
02:26:26 as it's been done and i probably would have concentrated on that as an action a potential action for me
02:26:33 would you accept that this was deliberate and planned reliance by kingspan
02:26:37 kingspan on a test of a trial product to support the use of a completely different product
02:26:43 product i don't think that was the intention no because the the standard product was tested the following april and and it passed on the terracotta cladding system right are you prepared to accept that
02:26:56 right are you prepared to accept that during the whole of your time as technical director of the company kingspan had no test evidence which related to the k-15 product actually being sold to market which could support the use of that
02:27:07 which could support the use of that product on buildings over 18 meters in height
02:27:11 height i not prepared to accept it that that was done knowingly um i think if you look back and you say well the
02:27:22 well the old technology was completely different to the new technology and that was the original test that was based on you could make an argument for that but that wasn't it wasn't unknowingly and the
02:27:33 it wasn't unknowingly and the certification i took in good faith i assumed that was that was correct
02:27:42 mr chairman i've come to the end of my questions i'm sorry i'm slightly over 4 30. um
02:27:49 4 30. um if we could have the customary break we may have to at that point um just reserve our position on recalling this witness while we checked the notes um
02:28:00 while we checked the notes um that he referred to but i think we have to see where we get to with that i don't think that should stop us releasing this witness today we're getting a bit ahead of ourselves let's deal with any questions first
02:28:11 let's deal with any questions first roger when we get to this point councils uh think she's finished asking all the questions but we always have a short break both to allow her to check and to allow those
02:28:22 allow her to check and to allow those who aren't present in the room but are following these earrings to suggest other questions that perhaps
02:28:28 perhaps put to you so we're going to break now until quarter to five okay and then we'll see whether there are any more questions that we need to ask you is that right yes and
02:28:39 we need to ask you is that right yes and uh please don't talk to anyone about your evidence while you're out thank you
02:28:50 right of course to fight please
02:42:11 would you ask dr rocha to come back in
02:42:24 please
02:42:30 all right dr roshan we'll see if there any more questions for you it's great question uh yeah it's just a couple um
02:42:38 couple um the metsec tests that were done back in 2008
02:42:41 2008 that we were discussing with k15 the failures
02:42:45 failures um when we were discussing what conclusions you formed about the performance of k-15 was it a factor in your thinking at the time
02:42:54 time that there'd also been a metsec test with rockwool which had failed to bs 8414 i i think it was a factor
02:43:05 i i think it was a factor that um it would have been one of one of several things can you explain how that was relevant how you thought that was a factor i think what what it would have shown was that the um
02:43:18 was that the um the system even with a a non-uh combustible insulin also failed were you ever aware that there was also
02:43:30 were you ever aware that there was also a pass with a metsec rockwool system in uh no i i wasn't but um
02:43:41 i wouldn't necessarily have been aware of that were you aware that mr meredith was present at the metsec um rock will fail in 2008 one of those
02:43:54 rock will fail in 2008 one of those tests
02:43:56 tests i didn't know that he was necessarily present but i know either spent quite a lot of time down at garson so it's possible we've gone through quite a lot in the
02:44:07 we've gone through quite a lot in the last day well today dr watchford um if you had your time again what would you do differently i would probably ask more questions
02:44:18 questions um that would be my um biggest regret about it i think
02:44:26 yes right thank you mr chairman there's just the
02:44:30 just the remaining matter of the recent disclosure um just to be clear that um we've checked and it would appear that together with a lot of other information we've had from kingspan
02:44:42 we've had from kingspan very late we have been inundated with late disclosure from kingspan on the 17th of november those notes were provided although it wasn't clearly marked that these were dr rochford's notes
02:44:53 notes um we're obviously in your hands as to what you do i think some teams would like him not to be released and that's team two's position of the bsrs until they've had a chance to consider that
02:45:04 consider that um have you or those who sit behind you had a chance to look at those notes we've had a brief look and we can't say anything of any we can't see anything terribly significant at the moment in terms of
02:45:15 significant at the moment in terms of changing
02:45:16 changing um the evidence war in terms of questions we'd want to put but what we could do is let dr rochford go today
02:45:23 today and then if there are further questions to put to him once everybody's seen those documents we can then if necessary recall him or put those further questions to him in another way all right thank you very much well dr
02:45:36 all right thank you very much well dr rocha
02:45:37 rocha those are all the questions we have for you and i think the first thing for me to say is
02:45:40 to say is thank you very much for coming to give your evidence um it's been a long day for you i'm sorry it's taken long we thought but we're very grateful and it's been very helpful to hear from you now about your diary yes you've got it
02:45:52 now about your diary yes you've got it somewhere safe at home i take it i have although it has been it has been scanned all the relevant well yes but it's nice to know where the original oh you know it's going to ask you to look after it carefully now what we're going to do about that as you've
02:46:04 we're going to do about that as you've heard it has been disclosed to us um council have had a look at it they are satisfied that it does not contain anything
02:46:11 anything that will assist us or will give rise to any further questions but as you know there are other people who are interested in this inquiry and they've not yet had a chance to look at it yes so
02:46:23 at it yes so what i'm going to say is that although i'm going to release you now which means you're
02:46:27 you're you obviously not just you go home but you're free to talk about uh the inquiry if you if you want to um i would ask you please not to talk to people about your
02:46:39 people about your contents of your diary right and i think uh if it transpires that there are further questions arising out of the diary when we've had a better chance to look at it or if other people suggest questions
02:46:51 or if other people suggest questions that ought to be asked when they've had a chance to look at it it might be necessary to ask you to come back and deal with those questions i understand that yes we'll let you know in good time if that turns out to be the case i should say there's quite a bit of
02:47:02 i should say there's quite a bit of personal information in those diaries but we shall be troubling you with that hopefully not but uh for the time being uh thank you very much for coming and you're free to go thank you thank you very much
02:47:23 good well that must be the end for today it is
02:47:26 it is and we'll have another witness tomorrow we have another kings fan witness tomorrow uh mr tony militapp right thank you so we'll rise now and we'll resume at 10 o'clock tomorrow morning
02:47:37 tomorrow morning thank you very much