Grenfell Tower Inquiry - London Fire Brigade Evidence - Wednesday 22nd September 2021 (1/2)
00:20:43 good morning everyone welcome to today's hearing
00:20:47 hearing we're going to begin today by hearing further evidence from mr peter groves of the lfb
00:20:53 the lfb so could i ask please mr groves to be brought back in
00:21:09 good morning mr grace good morning ready to carry on i am indeed thank you thank you very much well when you're ready mr canelo thank you good morning mr crows good morning um yesterday
00:21:20 mr crows good morning um yesterday afternoon when we broke we were discussing communications and that's a topic to which i'd like to return this morning now we have a copy of station based radio equipment training package at lfb
00:21:32 radio equipment training package at lfb double zero one double two eight four six
00:21:36 six excuse me
00:21:39 there we go and if we can turn to page two
00:21:44 two we can see the four objectives of this station based training session are set out there
00:21:49 out there namely
00:21:50 namely list the range of radio equipment used operationally within the lfb describe the function of the radio equipment
00:21:58 equipment select radio equipment appropriate for use in operational scenarios demonstrate the assembly and use of barry that's b-a-r-i-e radio equipment
00:22:09 barry that's b-a-r-i-e radio equipment the package then goes on to describe key items of communications equipment and for example can we turn to page 14
00:22:21 where it describes barry equipment if we go to page 20
00:22:31 there is a description of radio repeater capability and if we turn over to page 21
00:22:40 it sets out the availability of repeaters
00:22:43 repeaters but that is the totality of the guidance and advice given on the topic of radio repeaters
00:22:52 i've only taken you to a number of those slides but if you'd like to see more of them please say so but would you accept on the basis of your previous knowledge and what i've shown you this morning that the package
00:23:03 shown you this morning that the package contained only a basic description of the lfb's communications equipment yes i'd agree with that what it doesn't do is instruct crews about the difficulties
00:23:16 is instruct crews about the difficulties that may be encountered in relation to communications when fighting fires in high-rise buildings would that be something you also accept based on what i've seen yes
00:23:27 based on what i've seen yes and indeed those were the problems that had in fact been encountered at lachnal would you agree with that i agree and so the package itself doesn't meet or address the communications issues they're
00:23:38 communications issues they're experienced at lachnal is that a fair proposition i think that's fair thank you
00:23:44 you and would you accept that this package also
00:23:47 also does not provide guidance or teach crews about
00:23:51 about wholesale loss of communications and what to do when faced with that eventuality would you agree with that i'd agree with that based on what i've seen yes
00:24:00 seen yes can we turn now to the senior officer package which can be found at lfb double zero one two eight double four
00:24:11 and if we can turn to page three we should see the objectives of the package which are again fourfold first to describe the functions and use of the analog handheld radio radio
00:24:24 of the analog handheld radio radio repeater and digital main scheme radio secondly describes situations where interagency voice communications and procedures can be used and how it would be implemented
00:24:36 be implemented thirdly identify and find solutions for radio communication issues and finally apply your knowledge of how radio equipment can be used to an exercise scenario
00:24:47 exercise scenario now if i can give you a flavor of the slides again first of all if we could turn to page 23
00:24:56 if that could be expanded we see here a slide which says under the heading communication issues and solutions a text which says this large and complex buildings or underground structures may adversely
00:25:09 underground structures may adversely affect radio communications would you accept that that is not an adequate or complete way of instructing senior officers about the way in which high-rise materials such as concrete and
00:25:21 high-rise materials such as concrete and metal can destruct radio signals for example it doesn't specifically say that so i agree with you if we can go on and look at a number of other slides can we go back and in the
00:25:33 go back and in the slideshow to page 17
00:25:40 and here we go here we have rather an explanation of the functionality of a repeater and leaky feeders i'll just let you read the text
00:25:56 would you accept there's no distinction made there between radio repeaters and telemetry repeaters i'd accept that yes and so on the basis of this package would you accept that there was a
00:26:07 would you accept that there was a failure to train senior officers at least on that important distinction based on what you've sent me yes i agree with that
00:26:17 with that can we go to a separate document now which is a witness statement of greg ashman
00:26:22 ashman his statement can be found at lfb00102269
00:26:35 and if we can turn to page three and paragraph 12.
00:26:41 and what he says there i should say greg ashman i'm assuming is a name known to you he's an employee of the lfb yeah he's known to me yes did you have many dealings with him during your time as head of training
00:26:53 as head of training very limited what he says in paragraph 12 is this in a number of witness statements provided by lfb personnel to the mps that's the metropolitan police service
00:27:04 that's the metropolitan police service the assertion is made that ray j repeaters were deployed at the grenfell tower fire however there is no evidence which the lfb has been able to derive from the cctv review
00:27:15 cctv review to substantiate these assertions the personnel who provided these statements have mistaken telemetry repeaters for radio repeaters now my question is a short one was it
00:27:26 now my question is a short one was it those events and the subsequent discovery that tcap0039
00:27:32 tcap0039 had not been delivered to staff before the fire
00:27:35 the fire that resulted in the delivery of radio related training packages to staff in february 2019. sorry i can't i can't answer that i don't know do you know who would be able to answer
00:27:47 do you know who would be able to answer that question uh potentially would be the head of ops policy i believe you'll see mr cowell at some point another one for mr carrup
00:27:58 at some point another one for mr carrup yes
00:28:00 yes and i think i'm right in saying he would have been imposed in february 2019 yes
00:28:06 yes yes
00:28:07 yes now in light of that answer i've come to a swifter end to my prepared questions than i'd anticipated which uh apologies um those circumstances sir might i have the
00:28:18 those circumstances sir might i have the usual uh ten minutes um to review the state of place if there are any further matters yes well um mr groves i'm sorry we brought you in just for ten minutes worth of questioning it's okay could
00:28:30 worth of questioning it's okay could possibly have done that yesterday but we didn't know of course well it may be more
00:28:35 more of course there may be more questions but anyway here you are and um mr
00:28:41 mr kenya has been very economical and serve you so
00:28:44 you so we've reached the point at which we would normally have a short break so that
00:28:49 that mr kanir can check that he has actually asked you all the questions that he should have asked you and to enable others who aren't present here in the room to suggest further questions to be should be put to you
00:29:00 should be put to you do you think 10 minutes is enough mr canoe i think so right well what we'll do then we'll um break for 10 minutes we'll come back at 20 past 10
00:29:10 past 10 and we'll see then whether there are any more questions that we need to ask you and
00:29:16 and in the meantime please don't talk to anyone about your evidence if you'd like to go with the usher she'll look after you thank you
00:29:33 right so mr clear well i will we'll say 20 past if it turns out that you need more time someone can send us a message thank you very much
00:47:52 yes would you ask mr graves to come back in please
00:48:06 all right mr graves well i'm sorry we kept you waiting a bit longer than i suggested but we are now ready to find out whether there are more questions for you okay yes a few further questions for you mr groves um
00:48:17 groves um in evidence yesterday we discussed the nature of lfb's relationship with babcock
00:48:23 babcock and you mentioned that whilst initially babcock had been
00:48:29 proactive they later became passive now can i discuss with you first of all what was their extent of their initial proactivity and how did it manifest itself
00:48:40 and how did it manifest itself so at the start of the contract as i explained yesterday that you're going from a position where there was no training provider
00:48:51 there was no training provider to them coming in and having to produce their own training resource model their own trainers their own venues utilizing lfb equipment
00:49:02 utilizing lfb equipment so they were very um proactive within the first year to half year in the sense of getting themselves mobilized the design function took slightly longer
00:49:15 the design function took slightly longer to take place and i think there was a period where things
00:49:21 things became very sort of client and contractor relationship and so things were not moving as swiftly as
00:49:32 swiftly as both parties would would have liked now you referred to an evidence yesterday to encouraging babcock to deal more
00:49:42 deal more proactively and positively to knockbacks they received yes can you give the panel an idea of the type of knockbacks that babcock received presumably from the lfb you're talking about yes i mean one that comes to mind is around the use of
00:49:54 that comes to mind is around the use of driver simulators so the lfb sorry babcock have invested quite a bit of time and effort in designing a driving simulator approach
00:50:07 designing a driving simulator approach and had invested quite a bit of money in developing these simulators the lfb was not keen the commissioning department was not keen on sole use of
00:50:19 department was not keen on sole use of simulators understandably what they wanted was a theoretical input a practical input and simulated evidence
00:50:29 evidence uh
00:50:31 uh babcock i think um
00:50:35 i was going to say rolled over perhaps that's not the right terminology to use but um let's just say that they accepted the lfb's position a bit too quickly and
00:50:46 the lfb's position a bit too quickly and i think that they should have pushed back against that and were there a number of other instances where that dynamic was manifested no because um i think after that they
00:50:57 think after that they they became quite um reactive rather than proactive towards the end of my time with the lfb we had
00:51:08 we had spoken to them about using virtual reality training more and
00:51:13 and at the point that i was leaving they would be far more proactive in the world of using alternative training methodologies one point which has been raised is the
00:51:24 one point which has been raised is the it's really the question what importance do ui the training department uh place on simulation training given the lfb's frontline service nature i think simulator training is really important
00:51:36 simulator training is really important but it's not the the most important type of training in effect for each training solution that you look at you should look at on three different levels
00:51:48 look at on three different levels one would be is what's the theoretical input
00:51:51 input and invariably you would do that by means of a computer-based training solution
00:51:56 solution from there you would then look to see how can we simulate that and we're so to enable people to use the knowledge that they've acquired and put that in a safe environment
00:52:07 that in a safe environment and then ultimately put them into a real life situation where they can practice the theory and what they've done in the simulated environment thank you um also in evidence you
00:52:19 thank you um also in evidence you referred to numerous conversations with the babcock contract director yes um to make processes uh work better and more efficiently um who was the contract director with whom
00:52:30 who was the contract director with whom you were having discussions okay there were actually three up to the time of the uh incident so there was uh david
00:52:40 david anger
00:52:41 anger mark metcalfe and tony mchugh thank you can i turn now to other aspects of training and in your
00:52:52 other aspects of training and in your report on instant management data july 2013 and we don't need to go to it unless you'd like to see it it states that since there are now fewer fire incidents there is less opportunity
00:53:04 fire incidents there is less opportunity to undertake instant command roles just flowing on from the types of training that's useful so incident management training is important to ensure individual officers maintain skills in
00:53:15 individual officers maintain skills in that particular area now the question is why was the corollary not that more in-person i.e practical training was therefore required yes i think that's something that
00:53:27 yes i think that's something that i think that's a fair question and i think subsequently that's where the lfb moved to a position where they moved a more practical element within the instant command exercise and that's certainly
00:53:38 certainly it's
00:53:39 it's instant command courses and that's certainly what they've done in the latest suite of training thank you now in meeting minutes of the operational directorates coordination board on the
00:53:50 directorates coordination board on the 16th of june 2015 this is something we looked at yesterday it states that under the 10th of march 2004 in 2014 action point this
00:54:01 2004 in 2014 action point this ict need to improve links to stations for video as there is inconsistency in performance there is no budget for improvements the key question here is did a lack of
00:54:13 the key question here is did a lack of funds hamper effectiveness of training
00:54:20 i i wouldn't say in that situation i think what was more the problem was around governance
00:54:28 you mean by that so that so funds were available but they weren't always necessarily available within the training budget so there might be need to request additional budgets from like a
00:54:40 request additional budgets from like a transformation budget also if you were looking to increase the training budget and it was over a certain figure 150
00:54:51 over a certain figure 150 you had to go to the deputy mayor for approval so funds were there but they weren't always easily accessible thank you
00:55:00 thank you now again we don't need to go to it unless you would be grateful or need that assistance in your second witness statement to the inquiry you discussed the pilot process associated with tcap0124
00:55:12 tcap0124 and that was for people listening enhanced incident command training following lachnal recommendations the pilot was delivered on a number of occasions between 2014 and 2016 as we discussed yesterday
00:55:23 discussed yesterday in existing training courses and brigade and babcock representatives attended those courses and provided feedback
00:55:31 feedback now in those feedback forms one issue is consistently mentioned is that it wasn't clear what the training was trying to achieve um was that first of all a
00:55:42 achieve um was that first of all a concern which you shared if so what was done to address that concern um i have no recollection of that i'm afraid
00:55:53 if we go to lfb double zero one zero quadruple two
00:56:05 and there's five forms here i don't know whether you want to if we can just scan through them at a pace that allows you to read them
00:56:14 we turn over the page
00:56:25 and turn over the page please
00:56:37 if you indicate do you want to turn over the page again oh sorry yeah
00:56:42 yeah do you want me to look at a specific
00:56:45 specific comment um no well it's a general it's a general comment if you have no recollection of the concern if we go back a page skipped too quickly
00:56:59 and you see the so general comments you see box 4 detail and content the information supplied
00:57:16 it might be thought that the overall point that was being made was it wasn't clear what the training was trying to achieve
00:57:24 having briefly refresh your memory uh do you have any recollections of that being a pronounced concern or a concern that prompted further discussion at the time when you reviewed the feedback forms that
00:57:36 forms that i don't recall this bring being brought to my attention no and you don't remember any further discussions on that no i don't
00:57:53 i turn to one final matter and that is the people services review which was carried out in 2017 i think i'm right in saying and we can
00:58:04 i'm right in saying and we can go to the document lfb zero
00:58:08 zero eight three eight four five forward slash twenty seven
00:58:22 i'm trying to find because we haven't been given the assistance of a precise reference
00:58:28 reference but
00:58:29 but what i'm
00:58:30 what i'm the relevant extract is that the what it says is the bad contract is effectively delivering a central training program particularly in volume of attendance but it queried with the training
00:58:41 but it queried with the training assurance capability as its staff are professional and skilled to judge the generic quality of training and work effectively to hold the training provider to the right standards of facilities and trainer delivery however
00:58:52 facilities and trainer delivery however because they are not subject matter experts they are not always best placed to judge the content of some operational courses
00:59:00 courses this is something that will need to be resolved moving forwards to genuinely assure the quality of what the external training provider is delivering now that's at the bottom of that page
00:59:12 now that's at the bottom of that page the question is this that it would appear that in this people's service review which i think was carried out between april and december 2017 yep yeah um
00:59:22 um appears to be the first time that these issues have been understood is that a fair observation no that's not fair observation there were budget um growth bids put in
00:59:34 there were budget um growth bids put in previously to increase the size of the team
00:59:37 team and an explanation that ideally what you would like is a subject matter
00:59:43 matter expert in each of the training curricular areas
00:59:48 thank you um
00:59:50 um mr groves that is it i i'm pleased to say i hope um it's probably better to deal with these matters this morning rather than half or yesterday evening so i've asked for your in forgiveness and indulgence in that
01:00:02 in forgiveness and indulgence in that regard and that of the panel uh but the final thing i'd like to say is thank you very much for attending to give evidence and
01:00:08 and it's much appreciated thank you yes mr grove as well it's right that i should thank you on behalf of all the members of the panel for coming here to give your evidence it's been really useful to hear what you have to tell us
01:00:20 useful to hear what you have to tell us and so we're very grateful and and now it's all over you can go thank you very much thank you very much
01:00:34 thank you mr cleaner now um we do the next witness was originally asked to be available to give evidence tomorrow
01:00:42 tomorrow but i'm pleased to say that she's available today she may not be actually here at the moment but she is going to be uh able to start giving her evidence a little bit later
01:00:53 giving her evidence a little bit later this morning i think the best course because we need to do a little bit of housekeeping in any event don't we we do perhaps would be to have a a a bit of a break now and come back say
01:01:06 a a bit of a break now and come back say 11 15 by which time i think the witness will be here will have had a chance to
01:01:11 chance to settle in
01:01:12 settle in and um
01:01:15 and um then we can take our evidence the witness is here good but quarter past 11 probably gives enough time for her to settle down for people to make necessary arrangements the next witness right thank you very much thanks
01:01:26 witness right thank you very much thanks sir well with that in mind then we'll break now and we'll resume at 11 15. thank you very much
01:34:44 uh yes mr millett no we have another witness we do mr chairman uh i now call miss rita dexter please thank you
01:35:07 good morning mr dexter you're going to affirm i understand is that right yes well then the words should appear oh right you'll be given a hard copy that's fine could you read them out please i do solemnly sincerely and truly
01:35:19 i do solemnly sincerely and truly declare and affirm that the evidence i shall give shall be the truth the whole truth and nothing but the truth thank you very much no do sit down make yourself comfortable [Music]
01:35:30 [Music] there's some water there if you would like it
01:35:39 and
01:35:50 right when you're ready then yes mr millet mr chairman thank you mr dexter can i begin by thanking you very much for attending the inquiry today and for the next day also
01:36:02 today and for the next day also to help us with your evidence we're very grateful to you my questions are intended to be short and simple sometimes they are anything but and so if you don't understand the
01:36:14 and so if you don't understand the question or you would like me to repeat it
01:36:17 it then i can do that or i can put the question in a different way we are going to take scheduled breaks but if you feel you need a break at any other time then please just signal and we can we can take a break
01:36:28 we can we can take a break uh i should also ask you please to keep your voice up nice and clear so that those to your right can get down on the transcript very clearly what you're saying
01:36:39 saying also please don't nod or shake your head a yes or no it has to be because otherwise it won't get recorded now you've provided two witness statements to the inquiry you'll find them on the desk in front of you in hard
01:36:51 them on the desk in front of you in hard copy form
01:36:53 copy form but they will also appear on the screen in front of you so that others can see the contents of those statements and so will the documents to which we're going to go together
01:37:04 going to go together now your first witness statement was dated the 25th of january 2019 and if you go please to that it's at lfb3032363
01:37:19 is that your first witness statement of that date
01:37:22 that date yes it is and can you please go to page 15.
01:37:37 there's a signature there is that your signature it is uh and at page 16 if we just pick up the date of the uh 8th of february 2019 there
01:37:49 of the uh 8th of february 2019 there now can we please look at the second witness statement at lfb 3040773
01:38:00 is that your second witness statement of the 11th of march 2019 it is and again we see a signature under the statement of truth there is that your signature it is
01:38:10 is uh and there is an exhibit um rmd 9 to that witness statement i'll show it to you that is lfb3040774
01:38:21 can we please have that up
01:38:25 that is a 25-page submission that you made is this right unsolicited to the grenfell tower inquiry on the 15th of november 2017. that's correct and it was in respect of the inquiry's terms of
01:38:37 in respect of the inquiry's terms of reference yes
01:38:42 uh yes
01:38:44 yes i made a submission in response to the request for submissions in respect of the terms of reference for the inquiry
01:38:56 reference for the inquiry and i think i subsequently made a further submission which was once the terms of reference had been established is that this submission i think it's this is the latter rather than the former yes i see
01:39:07 former yes i see do you recognize it as your own yes yes have you read your witness statements and this november 2017 submission recently yes can you confirm that the contents of your statement statements
01:39:20 contents of your statement statements and this november 2017 submission are true to the best of your knowledge and belief yes and are you happy for them to stand all as your written evidence to the inquiry
01:39:31 as your written evidence to the inquiry i am
01:39:33 i am now your statements have a number of documents exhibited to them in addition to this rnd9 can i ask you have you recently reviewed those exhibits i have you have and have you discussed your
01:39:44 you have and have you discussed your evidence with anybody before coming here today with my legal team right now just by way of
01:39:51 by way of foretaste i should just tell you in a very broad la outline the topics that we're going to consider together the first is your professional background then we'll look at the role
01:40:03 background then we'll look at the role you performed at the lfb and then we'll be looking in detail at the operational directorates coordination board or the odcb and in particular the diopt or diot
01:40:16 and in particular the diopt or diot steps
01:40:18 steps and then we'll move on to fire safety as a general topic and look at some detail about that and the lachenal house working group in particular now
01:40:28 now can i start then with the first of those topics which is the professional background that you have in your witness statement you say if we can go to lfb3032363
01:40:41 this is your first statement you say
01:40:45 you say if we go to page two please paragraph five there
01:40:52 there that um before joining the lfb in 2001 you say i was deputy chief executive of a london borough council was that barnet
01:41:03 was that barnet yes uh and i uh you joined the lfb in 2001 as director of corporate services i think i did yes now other than the role of deputy commissioner did you ever
01:41:15 of deputy commissioner did you ever occupy any other role within the lfb uh director of corporate services other than that oh i'm sorry i was first director of corporate services and subsequently deputy commissioner right
01:41:26 subsequently deputy commissioner right so you went straight from one to the other yes and i think you were appointed to the role of deputy commissioner on the 10th of november 2009. that's correct and is it right that you held that position until the 31st of march 2015. yes and at
01:41:39 until the 31st of march 2015. yes and at that time you were made redundant i think correct yes yes now you say it at paragraph 5 of your statement which is on the screen in front of you in the fifth line that you were the first non-operational
01:41:51 that you were the first non-operational deputy commissioner of the lfb now by that do you mean that you didn't have any previous firefighting experience i do uh now in your 2017 uh submission
01:42:03 uh now in your 2017 uh submission if we just hand turn that up please lfb3040774
01:42:10 can we please look at the first paragraph on page one of that you say there
01:42:17 in the last three lines i was appointed for my strategic management strengths and in the light of my experience outside the fire service which was expected to enhance performance within the brigade because i would bring new
01:42:29 the brigade because i would bring new experience and perspectives what
01:42:33 what new experience and perspectives did the brigade want you to bring to the role
01:42:40 specifically i think working with outside bodies so for example the london boroughs so um a great deal of what the fire service
01:42:52 um a great deal of what the fire service in london needs to achieve is the product of working with others so the london boroughs the care quality commission and others
01:43:04 members were also members as in elected members so my appointment was as the result of a process
01:43:15 the result of a process led
01:43:16 led and determined by elected members of the authority but members wanted to see i think one of them described it as a an intelligence-led approach so during my time in london fire brigade there was a
01:43:31 time in london fire brigade there was a increasing emphasis on the importance of information and the use of that information in order to improve
01:43:39 improve uh performance so those are two examples that immediately come to mind but i guess also possibly my wider management experience so you
01:43:51 my wider management experience so you know the fact of not having spent all of my career in in the fire service but having worked first in birmingham city council then in the department of the environment and then in
01:44:02 the environment and then in in barnett council the experience which i'd gained in those organizations and the roles that i'd held
01:44:09 held were regarded as a strength and as providing me with experience which would be beneficial to the work of the brigade and in what ways were you
01:44:20 the brigade and in what ways were you expected to as you say here enhance the performance within the brigade
01:44:26 brigade just in brief
01:44:30 well for example in respect of community safety to increase the time spent on community fire safety activity as undertaken at fire stations
01:44:42 fire stations but also to improve the range and quality of relationships with outside bodies i've already mentioned the
01:44:52 care quality commission but there were others
01:44:56 others others too
01:44:58 to improve our performance uh as it were by reference to um individual incidents so in the case of
01:45:09 incidents so in the case of uh individual fire deaths in domestic dwellings where uh elderly or vulnerable people were involved i think one of the things one of the
01:45:20 think one of the things one of the things that i very specifically did was introduce
01:45:26 introduce measures and strategies for addressing those events in a more focused and forceful way and in particular feeding that back to the boroughs and
01:45:37 feeding that back to the boroughs and care providers so instead of as it were incidents being treated individually we began to bring together
01:45:48 we began to bring together as it were pictures or trends based on individual incidents including the fire deaths of elderly people and learn and implement some strategic lessons
01:45:59 lessons as a result of those when you joined the lfb in 2001 having joined did you become aware of the particular problem or problems that you had been appointed to solve was
01:46:12 you had been appointed to solve was there a particular problem that your appointment was supposed to address um no i wouldn't say that was the case when i joined in 2001 it was a new
01:46:23 when i joined in 2001 it was a new structure
01:46:25 structure so it wasn't the case that i was taking over the role from somebody else for example who might have been thought to have
01:46:31 have for example underperformed that's not what what was happening it was an entirely new structure with a rearrangement of functions within the brigade
01:46:42 brigade but i think what members did want to do was to give more importance to strategy and planning which was one of the departments for which i was responsible and communication so i think they wanted
01:46:53 and communication so i think they wanted to see what they might have described as a step change in uh performance um but it wasn't to remedy um as it were known defects
01:47:04 as it were known defects and when you were appointed deputy commissioner in november 2009 again was there a particular problem that you were appointed into that role to solve no right
01:47:16 to solve no right turning to that when you were appointed into that role in november 2009 did you receive any handover
01:47:24 i don't recall a specific handover but i'd worked closely with the deputy commissioner who preceded me but no i don't recall a handover as such
01:47:35 but no i don't recall a handover as such no and just for our benefit who was that that was mr roy bishop
01:47:42 now if we go to your first witness statement please lfb3032363
01:47:49 page two paragraph five
01:47:53 you say there in the seventh line that you had relevant fire service experience based on your role as director of corporate services within the lfb since 2001
01:48:04 services within the lfb since 2001 how did that prepare you for the role of deputy commissioner
01:48:11 uh well obviously i had knowledge of the structure of the brigade so the building blocks of the brigade
01:48:22 i had knowledge and experience of the political management arrangements for the brigade which was always very important
01:48:33 which was always very important [Music]
01:48:36 [Music] i had become aware of the priorities of the service and
01:48:43 and i had
01:48:45 i had with
01:48:46 with my teams led on the production of what was known as the london safety plan for a number of years so the london safety plan was the brigade's integrated risk
01:48:57 plan was the brigade's integrated risk management plan and the statutory requirement to produce an integrated risk management plan i think came in in 2005 and an integrated risk management plan
01:49:08 and an integrated risk management plan was regarded as a key strategic planning document for all brigades which set out what it wanted to achieve the levels of service that it would provide it was a
01:49:19 service that it would provide it was a replacement for old nationally prescribed standards so for the first time we were allowed to determine our own arrangements for response in terms of
01:49:31 arrangements for response in terms of the arrangements of fire stations fire engines so all of that was part of the integrated risk management plan and um
01:49:42 and um i and the departments for which i i was at that time directly responsible um were responsible for that plan so that was a key that was the key document
01:49:53 was a key that was the key document for london fire brigade as it as it would have been in in other brigades in the country as well right now as deputy commissioner you were is this right one of the lfb's three directors
01:50:06 four oh sorry excluding the commissioners excluding the commission sorry yes i'm sorry yes yes uh and that was is this right alongside the director of operations resilience and training yes who until 2015 i think
01:50:19 and training yes who until 2015 i think also was gary reason initially gary dobson but subsequently gary reason and secondly the director of finance and contractual services who i think was sue budden yes yes and as deputy
01:50:30 budden yes yes and as deputy commissioner you held the additional responsibility of deputising for the commissioner that's correct do it i think all through your time was ron dobson that's correct yes were there any other ways in which
01:50:41 yes were there any other ways in which your role differed from the other director's roles
01:50:45 i mean quite apart from the supervision of the departments which were obviously different but as director reporting to uh the commissioner did you all have the same reporting responsibilities yes we did
01:50:56 did now is it right that your directorate the deputy commissioners directorate included
01:51:02 included uh at the very least the following departments and i'll give you five or four sorry first the fire safety regulation department yes and that became later known i think as the fire safety
01:51:13 known i think as the fire safety department maybe
01:51:15 maybe uh you say maybe is that after your time possibly
01:51:20 possibly just to be clear is it right that within the fire safety regulation department during your time uh
01:51:28 uh um
01:51:29 um the enforcement obligations sat under the rro yes and that was andy jack at least for some of it
01:51:39 uh
01:51:43 i don't know that i personally would have attached andy jack's name to that uh but
01:51:49 uh but certainly andy jack yes was involved in those activities yes yes um secondly the operations prevention and response department yes thirdly the strategy and performance department yes
01:52:00 department yes uh fourthly the communications department yes are there any significant departments for which you were responsible that i've omitted from that list yes legal legal and democratic services uh yes uh
01:52:13 services uh yes uh very well
01:52:14 very well uh
01:52:15 uh are you able to give us a brief overview of the strategy and performance department's remit
01:52:24 uh yes so
01:52:25 yes so it
01:52:28 matured over time so it was a department that i was responsible for when i joined in 2001
01:52:35 in 2001 um
01:52:36 um and
01:52:37 and um
01:52:39 i suppose focusing on 2009 rather than earlier it was the department that was uh principally involved in the london safety plan or the integrated risk
01:52:51 safety plan or the integrated risk management plan as i've just described it
01:52:54 it um
01:52:55 um it was responsible for oversight of the brigade's
01:53:04 risk management plan that was different to the integrated risk management plan in the early early years there was some work to be done on defining the division between those two things but
01:53:16 division between those two things but that was about the corporate risks of the brigade as a whole so you know it might include things which were of no relevance to the irmp but which were relevant to the effective
01:53:27 which were relevant to the effective functioning of the brigade just pause just pausing there when you say the lfps risk management plan do you mean the brigade's internal risk management plan relating to risks to itself yes as
01:53:38 relating to risks to itself yes as opposed to risks to premises for which it was responsible or either as an effort yes that would be one way of characterizing yes yes yes so risk management planning um it was responsible for performance
01:53:50 it was responsible for performance reviews so in my early years there was a statutory requirement to undertake a rolling program of what were then known as best value reviews but when
01:54:02 but when i can't remember whether best value as a legal concept came to be abolished by the government but it was over time replaced by a different scheme of performance review
01:54:13 performance review arrangements some of which from time to time involved inspections by the audit commission but
01:54:20 but probably by the time i'd left were more as it came to be described sector-led rather than led by an external body like the audit commission
01:54:31 the audit commission um
01:54:33 um sorry a major function of the strategy and planning department was the information management division so they were responsible for the
01:54:44 so they were responsible for the production of our information strategy and also for the design and maintenance of a number of key um information management systems so
01:54:57 um information management systems so um i haven't listened to all of peter grove's evidence in the last few days but i'd be surprised if he hadn't referred for example to to step as a system that recorded information
01:55:08 as a system that recorded information about
01:55:10 about the training undertaken by individuals within the organization and so the design and maintenance and integration of systems like step we had something called stars and numerous other
01:55:22 and numerous other systems to too many for me to readily recall they they were as it were designed and maintained within that division within strategy and planning
01:55:35 within strategy and planning sorry there was also the um predetermined attendance team
01:55:41 team so that was the team that oversaw the policy and maintenance of
01:55:51 of the arrangements for determining which appliances would be dispatched to which address and that was all done via a system known as predetermined attendance
01:56:02 predetermined attendance um
01:56:03 um and i have a horrible feeling i'm of overlooking uh a key team um but for the moment i can't drag their name to the front of my memory i'm sorry well thank you very much now looking at a different
01:56:14 you very much now looking at a different department operations prevention and response which also fell within your directorate am i right that that department's remit was local stations and the control room
01:56:25 and the control room or rooms uh yes but also for community fire safety policy and
01:56:32 and delivery
01:56:34 delivery so
01:56:37 there were numerous programs associated with the community fire safety objectives of the brigade um home fire safety visit so the team
01:56:49 um home fire safety visit so the team didn't carry out the home fire safety visits but they were responsible for as it were the policy that determined how and where they would be carried out but they were
01:57:00 they would be carried out but they were also responsible for things like the cadets programme junior fire setters a range of discrete
01:57:09 programs intended to um promote community fire safety right now some people sorry and sorry and just to say that uh within that department
01:57:20 to say that uh within that department there was also um what's what was known as the resource management center which was a kind of you know detailed technical thing but a very important detailed technical thing um i think you know you'd have to ask
01:57:33 um i think you know you'd have to ask dave brown when you when when he comes to give you a better description of it than i will than like than i will be able to manage today but it was an important and important corner of uh that department now dave brown is
01:57:46 that department now dave brown is the
01:57:46 the assistant commissioner dave brown yes yes so he was head of he was assistant commissioner opr um when i was in post and um both his title and his rank changed subsequently and he
01:57:57 and his rank changed subsequently and he had i think during your time the title third officer did he as well yes yes um now you've described very helpfully to us although in overall terms different
01:58:08 although in overall terms different functions these different departments had
01:58:10 had from the to the best of your knowledge and recollection who decided which functions should be allocated to which of these departments under your directorate
01:58:25 the commissioner must be the answer to that so
01:58:29 that so um
01:58:29 um [Music]
01:58:32 [Music] the authority the authority itself approved the structure of the organization and if there were to be any significant changes to the structure then that would have to be
01:58:44 then that would have to be reported to members for approval so they decided how many chief officers you know how many directors we had how many chief officers we had and by chief officer that i mean to include assistant
01:58:56 that i mean to include assistant commissioners so the head of strategy and planning would be
01:59:00 would be a chief officer but so two would be the head of
01:59:03 head of um opr operations prevention and response but he would also be sometimes known as a assistant commissioner and unhelpfully sometimes also known as the third officer but in essence they were
01:59:14 third officer but in essence they were as it were chief officers um so the authority approved um the structure in the in those terms um
01:59:23 um based upon advice received from the commissioner taking an example from what you've just told us somebody decided that the pda the predetermined attendance team should sit within the
01:59:34 attendance team should sit within the strategy and performance department's remit but community safety home fire visits and the control room should fit in a different department the operations prevention and response department are
01:59:45 prevention and response department are you able to tell us in very brief terms who made that decision or rather
01:59:51 or rather what the logic was for that decision
01:59:57 uh i think in the case of pda it will
02:00:09 in the case of pda it will i'm torn between now wanting to say i don't know and offering you an answer but if you don't know you don't know no uh i i don't know in the case of pda uh then
02:00:20 i don't know in the case of pda uh then i you know i've got some intelligent speculation about it but that's all it is um in the case of community safety um
02:00:27 um it was in the uh it was in the period after i joined the brigade but shortly after i joined the brigade that brigades began to think a great deal more about
02:00:39 began to think a great deal more about community fire safety and about what activities they might undertake
02:00:45 undertake um in order to promote community fire safety and i think that was very much as it were grown in then roy bishop's directorate um so so i think that's why
02:00:57 so i think that's why it started there and and it continued there
02:01:00 there and there were good reasons for that so you know if if the major bulk of community fire safety activity was home fire safety visits they were going to be delivered by
02:01:11 they were going to be delivered by firefighters based at fire stations so there was a natural synergy there and things like um the junior fire setters team for example
02:01:24 that that was very much associated with fire stations and fire fighters and so there was a very close uh affinity between community fire safety as a as a
02:01:35 between community fire safety as a as a function as it were and fire stations did anybody during your time keep regular watch
02:01:44 watch by way of monitoring on the appropriateness of this this structure and
02:01:50 and whether or not it was a pro whether or not it was appropriate to keep the structure as it was or whether different functions should be moved
02:01:59 was that regular regularly reviewed um it wasn't frequently reviewed but it but it was reviewed so the structure when i joined in 2001 was a new structure as i've already mentioned
02:02:10 i've already mentioned with as it were and a new arrangement of the building blocks um
02:02:16 um there were adjustments when i was appointed as deputy commissioner in 2009 so some of the departments which i was responsible as deputy commissioner had not previously been under roy bishop's command
02:02:29 been under roy bishop's command and of course there was a further restructuring as i left in 2015 which produced by redundancy so those are three high-level examples of where
02:02:41 high-level examples of where as it were the building blocks were actively reviewed but uh but i'm sorry i think there must have been another occasion as well when i joined in 2001 i joined at the same time as
02:02:53 2001 i joined at the same time as another
02:02:54 another um
02:02:55 um as we were sometimes described non-operational director who also happened to be a woman so
02:03:01 so it was regarded as notable that two women had joined as directors two non-operational women had joined as directors
02:03:08 directors and i can't remember the year in which barbara
02:03:11 barbara herself was made redundant i'm afraid um but um but that must if she was made redundant that was the result of as it were a reordering of the building
02:03:22 as it were a reordering of the building blocks and barbara was director of resources
02:03:26 resources and sue was director of finance and contractual services so there was definitely some rearrangement at some point but i i can't date it i'm afraid so that's barbara's surname barbara ritter barbara riddle
02:03:38 ritter barbara riddle yeah now i'm looking at your witness statement if we can please at page four
02:03:49 um paragraph ten you say that under the latter house action plan you
02:03:58 you in line five you say where those heads of service reported to me i sought to guarantee the delivery of various actions through management arrangements i would routinely meet at least monthly
02:04:09 i would routinely meet at least monthly with the heads of service who reported to me to discuss their wider activities and projects which included the actions that had been assigned to them and then you talk about the latino house board which we'll come to later
02:04:21 house board which we'll come to later now um where you refer to heads of service are those the heads of service for the departments that we've just outlined yes and did any other heads of service report to you uh none in addition to those we've
02:04:33 uh none in addition to those we've identified and were those meetings monthly uh yes are they formal or informal meetings uh i don't know the answer to that question they they were they were regular scheduled meetings they were
02:04:45 regular scheduled meetings they were regular and scheduled they weren't just uh very well were they minuted no they weren't ministered no they were they were one-to-one meetings between the head of service and myself to what extent were you involved in monitoring
02:04:56 extent were you involved in monitoring their the heads of service work that they were undertaking
02:05:05 to what extent um let me ask it a different way well no to a significant extent um uh i was struggling about whether to say intimately but that would imply i was excessively controlling um which some
02:05:17 excessively controlling um which some people might have thought i was no i was very involved in uh in that let me ask it slightly differently i mean you had these monthly meetings yes um
02:05:26 um which were not minuted but was that the extent of your monitoring or did you did you monitor and get involved in the business of those departments between those meetings uh it certainly wasn't the only way i
02:05:37 uh it certainly wasn't the only way i monitored them um so um
02:05:42 but i guess the other you know the other ways were
02:05:46 ways were indirect so um i'm sure we'll talk about the
02:05:50 the luck and old house action plan and i think it's you know likely that you'll at some point take me to comments i met i made on various drafts where i said you know actually that's not clear
02:06:01 you know actually that's not clear enough or will you put some numbers in here please or you know comments from me entire intended to improve the content of that plan um but i did that across a very wide
02:06:13 um but i did that across a very wide range of documents so all of the reports that went from my directorate to meetings of the authority or committees of the authority of which there were many hundreds and
02:06:24 of which there were many hundreds and hundreds over the years came via my desk and
02:06:29 and i think it's fair to say i read them all and i commented on very many of them so
02:06:36 so those reports would be produced at levels below me so within the brigade because of the nature of the organisation you often found a position where
02:06:48 you often found a position where one person or one department was response was responsible for the production of a particular report but they would then have to involve 10 or 20 other people in contributing to
02:07:00 10 or 20 other people in contributing to that so a good example of that would be the quarterly performance monitoring report that went to the governance performance and audit
02:07:11 the governance performance and audit committee so those reports would tell members
02:07:15 members how we were getting on with the delivery of
02:07:18 of key performance indicators as published in the london safety plan and
02:07:23 and an advanced draft of that report would come to me and i would read it and as a result of reading that i would be able to go back to my heads and service and say actually you know
02:07:34 service and say actually you know those numbers are of concern to me you know
02:07:39 you know why were there fewer fire safety inspections of high-risk premises in the last quarter than there were in the quarter before that so that's an example but um there was there was a
02:07:52 example but um there was there was a great deal of that so i had as it were purchase on um
02:07:57 um lots of aspects of the delivery of or the performance of those departments as a result of for example that kind of activity right now i just want to ask
02:08:08 activity right now i just want to ask you about oversight and responsibility in your role as one of the three directors um there was i think something called the corporate management team or cmt is that
02:08:19 corporate management team or cmt is that right cmb in my day corporate management board
02:08:23 board i think i believe it subsequently became cmt but it was definitely cnb while i was imposed do you know when the cmb was established uh
02:08:32 uh before my time it existed when i joined right and during your time in brief what type of matters would the cmb discuss or oversee
02:08:44 it would oversee monitoring of the authority's budget
02:08:57 it would
02:08:59 review some of the more key reports that we intended to put to the authority it would
02:09:12 it would
02:09:17 uh so the budget key reports to members if we had
02:09:24 if we had industrial disputes and sadly we had numerous
02:09:29 numerous uh it would receive reports about handling aspects of that
02:09:37 that it would receive from time to time reports about some of our more major contracts so for example the contract
02:09:49 contracts so for example the contract with
02:09:50 with asic co as it was at one point uh subsequently became babcock i think but the the contract for the provision of appliances to the brigade
02:10:01 to the brigade similarly it would receive reports about babcock and the delivery of the training contract as not all of the reports about that topic but the
02:10:12 the reports about that topic but the reports that it was presented that it was intended to present to members it would
02:10:20 it would as a kind of set piece on an annual basis review the health and safety
02:10:25 safety statement
02:10:27 statement for the brigade which was i think a statutory requirement so there was some of the business was cyclical um and in that sense predictable and other
02:10:38 and in that sense predictable and other items were in response to either events or priorities at that point in time now you refer to the cmb not the cmt uh
02:10:50 uh was there something called the commissioners group yes was that different from the cmb or the same it was it was different what was it um so um
02:11:01 um so um cmb i think met on wednesday mornings uh in a very formal way and cnb was routinely also attended by
02:11:12 also attended by a number of advisors so that for example the head of legal and democratic services always attended cnb but was not a member as it were the head of strategy and planning
02:11:23 the head of strategy and planning attended cnb the one or the head of equality has attended cnb
02:11:30 um uh uh and i'm sorry to go back to to go back a couple of stages on building blocks uh
02:11:40 i've just realised to my
02:11:45 in a way that's putting me off slightly i don't know why we didn't talk about the equality department the equality department reported to me as deputy commissioner
02:11:59 so sorry to go back to your question about the commissioners group the commissioners group was intended to be an informal and more informal opportunity for
02:12:10 opportunity for the four most senior officers and it became
02:12:14 became five so dave browner's third officer was added to the commissioners group for us to be able to meet more informally so the wednesday cmb meetings
02:12:25 informally so the wednesday cmb meetings uh were more formal um usually it was jolly helpful to have the advisors there but sometimes we wanted to talk about things you know without the advisors
02:12:36 without the advisors we were the more the more senior officers the five more senior officers and sometimes we just wanted the opportunity to talk about things in a more informal way
02:12:47 talk about things in a more informal way quite often they were to do with i don't know city hall politics so it was a terribly difficult period in terms of um the relationship with the mayor and
02:12:58 um the relationship with the mayor and the relationship with city hall particularly where there were proposals around
02:13:02 around for example station closures and it was just helpful sometimes to be able to meet and say you know this is what the mayor's thinking or this is what one of the mayor's advisers is thinking it may or
02:13:13 mayor's advisers is thinking it may or may not come to fruition um you know so more informal things maybe more ad hoc informal updates uh on the industrial relations position if we've got ongoing
02:13:24 relations position if we've got ongoing disputes so you know maybe some feedback from what the employer's thoughts were about you know where we were in the pensions dispute for example um so just a more informal opportunity
02:13:36 um so just a more informal opportunity right um
02:13:38 right um let me see if i can clear this up because i think we've been led into confusion or i have can i ask you please to look at mr reason's witness statement at lfb3032747
02:13:49 this is gary reason's witness statement page three please paragraph seven
02:13:58 uh and
02:14:00 and at paragraph seven he says at the top of the page there at the time of taking up the d-o-r-d-o-o-r-t roll dirt that's i'll call it roll the brigade cmt
02:14:12 brigade cmt was made up of the commissioner ron dobson deputy commissioner rita dexter director of contractual services sue budden and myself the cmt was supplemented in 2013 by the appointment
02:14:23 supplemented in 2013 by the appointment of a third officer assistant commissioner dave brown who at that time was responsible for managing all of the brigades fire stations now and that's why i asked you about the cmt
02:14:34 cmt um is mr reason correct that there was such a thing called the cmt that he's referring to here and describing uh one of us is mistaken and i i think
02:14:46 uh one of us is mistaken and i i think it's gary um so i think it became cmt and i know that gary went back to the brigade after grenfell and there was a cmt then but
02:14:57 cmt then but i'm i'm reasonably certain that in my time it was known as cnb so it's the same thing but yes absolutely yes now just on the cmb then and sorry and just to you know so that was the cmb but cmb
02:15:09 to you know so that was the cmb but cmb was also attended by advisors and gary hasn't made that point so he hasn't mentioned for example that um uh the head of legal and democratic services was always in attendance but that was not the case at the
02:15:21 that was not the case at the commissioners group so the commissioners group
02:15:24 group is as described um there yes that has that has cleared that up i think so thank you um just to be a little clearer still the cmb as you've referred to it
02:15:35 still the cmb as you've referred to it you say met wednesdays formally did it
02:15:39 did it were there minutes taken of those meetings yes there were right the commissioners group you say was informal
02:15:49 informal and was that unminuted yes tuesday mornings unminuted yes but it was also held regularly tuesday yes right now in addition to your role on the
02:16:00 now in addition to your role on the um cmb and within the commissioners group is it right that you were also a member of the operational directorate's coordination board or the odcb
02:16:11 coordination board or the odcb i was the chair of odcb we always the chair of the odcb once i became deputy commissioner yes i follow now we're going to come on in a little while to explore the work of the odcb in
02:16:23 while to explore the work of the odcb in detail but for the time being is it right that the board
02:16:28 board that board was comprised of the directors and heads of service of the lfbs two operational directorates so yours
02:16:37 yours and
02:16:38 and gary reasons uh not in their entirety no so
02:16:43 so odcb
02:16:45 odcb i chaired odcb as deputy commissioner gary dobson and then gary reason in the same role director of ort attended
02:16:56 same role director of ort attended sue budden as director of finance and contractual services came later so i don't think sue was attending odcb as a standing member
02:17:07 was attending odcb as a standing member when i began to chair odcb i could be wrong about that but i don't believe that to be the case i think she was added subsequently and then other members of odcb
02:17:18 members of odcb certainly included all of the assistant commissioners um
02:17:22 um because because of their management role so you know the head of assist the assistant commissioner for the head of for example operational planning
02:17:35 for example operational planning attended because he was the head of operational planning not not because he was an ac in fact that role was always occupied by an ac but
02:17:43 but the heads of the operational departments attended
02:17:48 attended um uh odcb as standing members other members other heads of service did not attend odcb so the head of strategy and planning for example did not attend odcb as a standing member um
02:18:01 as a standing member um the head of legal democratic services didn't the head of i.t didn't so it wasn't all of the heads of service um some of them it was a defined group
02:18:12 um some of them it was a defined group and so to be clear assistant commissioners did attend whether or not but where they were heads of service but but not all heads of service
02:18:23 but not all heads of service yes yes i follow uh you referred i think to our strategy and planning did you mean strategy and performance or is it something else like that no no um
02:18:32 um the planning and performance changed over time i can't date it but yes that would be s p um did not pretend s p could cover both yes
02:18:43 did not pretend s p could cover both yes um right uh well let's let's see how we go with the acronyms but but was the primary purpose of the odcb to review the lfb's operational performance and training
02:18:54 training uh
02:18:56 uh yes that would be one headline yes when i say headline at the primary purpose the mate yes yes yes now we're going to
02:19:03 going to touch on your membership of the latino house board and then the national house working group later in your evidence but just
02:19:11 but just pausing on that point for the moment is it right that the latino house board was set up following the latino house fire in july 2009 yes
02:19:24 2009 yes and is it right that the purpose of that board was primarily to investigate the cause of the fire uh and the brigade's response to it
02:19:36 uh
02:19:39 i can't remember your question included primarily again yes yes yes i mean there were other things as well of course the follow-up action yes follow-up action or
02:19:50 action yes follow-up action or consequential action yes yeah we'll come to it later on in slower time but just just as a headline point and also as a headline point at this early stage miss dexter is it right that the latino house working group or
02:20:02 working group or lhwg was a body established by the london fire and emergency planning authority or el fipa in june 2013 following the latino house coroner's
02:20:14 following the latino house coroner's rule 43 recommendations yes so the lucknow house working group was a
02:20:21 was a a body of elected members of whom there were three advised by officers yes and although it wasn't a formal committee of el fipa it operated in the same way that
02:20:33 el fipa it operated in the same way that is the members were the elected members and the officers were there as advisers yes and is it right that el fipa formed part of the greater london
02:20:44 formed part of the greater london authority yes yes and it was in in effect a political body charged with running the london fire brigade yes yeah and it didn't hold responsibility for running the daily
02:20:57 responsibility for running the daily working
02:20:58 working of the lfb uh
02:21:02 uh no but that's not to say it was unconcerned with as it were the daily running of the lfb insofar as it affected the objectives to improve safety for londoners indeed and do you agree that
02:21:14 londoners indeed and do you agree that the elect the lf epa or elfipa held the lfb accountable through a number of boards and committees uh
02:21:22 uh committees uh the lucknow house working group was an exceptional thing um i don't think there were any boards um so certainly through committees and through the lucknow house working group
02:21:33 through the lucknow house working group the reason i ask about committees is because
02:21:36 because we've come across two i think by way of example the elfipa governance performance and audit committee yes and the el people strategy committee yes yes they were uh
02:21:48 yes yes they were uh there were different committees uh earlier in my time in el fibre so the committee structure was capable of being revised
02:21:57 revised annually if members wished it to be so so
02:22:00 so i think when i joined it was a slightly different structure right um but but certainly by the time i left that wasn't stretching right were you a member of those two i'm sorry there was probably also a finance committee um there weren't only those two committees there
02:22:11 weren't only those two committees there was a finance committee uh and there will also have been provision for an urgency committee and an appointments committee right and those committees were is this right the way in which el fifa oversaw
02:22:24 right the way in which el fifa oversaw uh lfb and held it to account yes yes were you a member of the two committees i mentioned the governance performance and audit committee and the strategy committee no you you you're only a
02:22:36 committee no you you you're only a member of a committee if you were uh an elected member i a councillor or a member from the london assembly and if you attended as an officer you were as it were in attendance i see and you were
02:22:47 it were in attendance i see and you were you were one of those in attendance rather than a member i follow now let's then turn to look if we can a little bit more closely please at the odcb the operational directorates coordination board
02:22:59 board first uh i think you've confirmed but it's right isn't it that you chaired the odcb through during your time as deputy commissioner yes was it throughout that time yes
02:23:08 time yes uh and the first meeting that you chaired as we have it in our records is the 2nd of march 2010 is that something you remember we have the minutes if you want to see them but would that be about right uh that's
02:23:19 would that be about right uh that's certainly about right yes yes we do have the minutes for that sure there just for our reference there at lfb three zeros four zero six zero seven we don't need to turn them up now and is it right also that gary
02:23:30 now and is it right also that gary reason uh
02:23:33 reason uh as director of operational resilience and training chaired the odcb in your absence
02:23:38 absence uh yes
02:23:40 uh yes how often does the odcb meet uh probably four times a year and that was a formal occasion yes formally minuted yes
02:23:51 formally minuted yes turning to its terms of reference we find those at lfb 3032733
02:24:03 can we just go to that please and we can look at section one summary objective under terms of reference and i'll just read this to you within the brigade's overall governance arrangements the odcb provides
02:24:14 provides a formal and scheduled forum for the principal offices of the deputy commissioners directorate and director of operational resilience and training to consider a intelligence from a number of sources
02:24:25 intelligence from a number of sources about the brigade's operational and training activities and determine the most appropriate response in terms of policy review and development b regular reports about dynamic and intelligent operational training or diot
02:24:38 intelligent operational training or diot or diode
02:24:39 or diode which enables the brigade to identify positive and developmental trends from operational and training activities which is used and which is used to help decide future training requirements and to assist in identifying any areas where
02:24:50 to assist in identifying any areas where the brigade's operational performance needs to improve and see other cross cross-directorate policy issues the board is in essence a policy forum relating to operational health and
02:25:01 relating to operational health and safety and training issues and will not manage the actual delivery of policies and procedures which is the responsibility of other bodies now just focusing on those last
02:25:13 now just focusing on those last that last sentence in particular are we to take it that the clue of the function of the odcb is actually in the name namely a forum for the two
02:25:24 in the name namely a forum for the two operational directorates to coordinate their activity was that the crux of it
02:25:33 um
02:25:46 i'm thinking hard about whether coordination is the best way of thinking about it um but yes yes yeah
02:25:55 yes yeah and is it right that the odcb meetings were attended by the vast majority of lfb's senior officers save the commissioner well um
02:26:05 well um accept the heads of service that we talked about earlier may i see page two of this document yes of course page two
02:26:12 page two uh is where we're going next we're going to go to right well we're going to go and set to section four which may help okay membership deputies frequency and administration and then there's a list yes of the members yes
02:26:23 yes of the members yes um
02:26:24 um and so that may help you yes that list there is that the vast majority of lfb's senior officers um
02:26:33 um they have a description but rather than it leaves out four or five of important important officers so the head of finance isn't there uh head of s p isn't there
02:26:45 head of s p isn't there head of equality isn't there head of legal isn't there so as before it was very much more more focused on those with operational responsibilities
02:26:57 those with operational responsibilities but the head of human resources and development was there principally because of the relationship with babcock and training the head of finance and contractual
02:27:08 the head of finance and contractual services i've been struggling why it doesn't say director of finance and contractual services when i reviewed this document because sue button was the director of finance contractual services but
02:27:21 finance contractual services but that was because part of the business of odcb sometimes did
02:27:29 did encroach on issues to do with equipment for example appliances and equipment and so
02:27:34 so i think we're the function responsible for
02:27:37 for procurement and co and some of those contracts was there um
02:27:43 so uh
02:27:46 numerically it's the majority of heads of service but it's certainly not all of them now you said something a moment ago uh that i'm interested in you said the head of finance isn't there the head of s p isn't there no by s p do you mean
02:28:00 s p isn't there no by s p do you mean strategy and performance or strategy and planning
02:28:04 planning um
02:28:06 that title changed at some point but i can't date it so i can't remember whether it was first head of strategy and planning or first head of strategy and performance and it and then it changed to the other
02:28:18 and it and then it changed to the other but it's it's the same it's the same role the same role and it sat within your directorate yes but was but that head did not attend odcb why is that um because it was this was largely
02:28:30 um because it was this was largely focused on uh as it were operational performance and improvement so there wasn't a strong case for the holder of that role to attend um
02:28:43 the holder of that role to attend um odcb
02:28:46 who made that who decided that there wasn't such a strong case for that to be
02:28:52 to be there i must have inherited it um so i don't remember making an active decision about it right did another strike he was odd that the head of s p
02:29:03 strike he was odd that the head of s p was no it was not routinely or whatever actually is it looks from this uh at odcb meetings no didn't no why is that uh because there was nothing about the
02:29:14 uh because there was nothing about the business of odcb that um
02:29:20 that um that uh sorry in the context of the business of odcb i can't remember an occasion where i thought oh actually it would have been really helpful if we'd had that person in attendance right so
02:29:31 had that person in attendance right so um but
02:29:33 um but it doesn't say it here but the head of information management who reported to the head of snp regularly attended as it were by invitation but regularly attended
02:29:45 invitation but regularly attended in order to provide updates on issues that were of relevance to operational performance for example um to provide an update on what was happening with mobile data
02:29:57 happening with mobile data terminals so there were there were often information management specific issues that arose at odcb or which odcb needed to receive an update about and so
02:30:09 needed to receive an update about and so that head who wasn't a head of service but head of information management division
02:30:15 division he attended from time to time to provide those updates right
02:30:21 right we may come back to that in due course just looking staying with this page you'll notice uh in the last bullet point there that babcock international uh was a member on a four monthly basis
02:30:33 uh was a member on a four monthly basis does that mean they only attended odcb meetings every four months yes they attended when we took the impd reports as they're referred to because the impd reports were
02:30:47 because the impd reports were the vehicle so the impd reports are part of diet and we'll explore all of this i'm sure but the impd reports were the main vehicle for
02:30:59 were the main vehicle for determining [Music]
02:31:01 [Music] issues that we were going to take forward
02:31:06 through operational news and or training and or policy adjustments right so
02:31:15 so so there was a direct need for babcock to be in attendance for those items
02:31:21 items i mean before the contract was uh before the function was externalized the assistant commissioner training would have been in attendance and um
02:31:32 and um and and as it were covered that off but once we ceased to have an assistant commissioner training we needed to uh babcock needed to be in attendance
02:31:43 attendance to as it were fulfill the function previously undertaken by what had been the assistant commissioner training yes now
02:31:51 now we know that the
02:31:55 the frequency of attendance of babcock at the odcb meetings decreased from uh
02:32:01 uh well three times a year as it would have been uh to once every six months when did that happen i was about to ask you that
02:32:11 you that um
02:32:12 um do you remember that no you don't right do you know would it follow that since you don't remember when it happened you don't know why it happened uh
02:32:21 uh no i mean
02:32:23 no i mean i'm assuming you're saying that because you've got some minutes and you've and and you can see when it happened but no i don't i don't recall that does it help you to know that the impd reporting
02:32:34 you to know that the impd reporting changed
02:32:36 changed uh we think in 2012 to every six months first was that is that correct actually uh i don't know i'd have to uh i'd have
02:32:47 uh i don't know i'd have to uh i'd have to review um the agenda and minutes um
02:32:51 um is it right to say sorry um no i'm sorry go ahead go ahead yes yes right is it fair to say that the odcb was was particularly focused on
02:33:03 odcb was was particularly focused on operational information and feedback yes in other words operations in the field rather than internally
02:33:12 i'm not sure the distinction you're driving at all right we'll come back to that then perhaps later can we stick with
02:33:19 with this document and go back please to page one
02:33:22 one and go to page two
02:33:29 uh the bottom of page one you can see the agenda set out part one standard business terms
02:33:37 and you have quarterly meetings six monthly meetings for good page two which would include the impd six monthly update uh and uh
02:33:49 uh and uh and entering meetings as well between the quarterly and six monthly meetings uh now if we go on to part two it says here part two strategic direction issues which include policy issues affecting
02:34:00 which include policy issues affecting both directorates the agreement of changes to strategies and policies relating to health and safety operational staff training and development senior operational officer training and the prioritization of
02:34:11 training and the prioritization of non-core operational training needs other examples of strategic direction issues include the final agreement of operational elements of selection processes and the annual babcock training delivery plan decisions arising
02:34:23 training delivery plan decisions arising from this part of the agenda will as appropriate be referred to other departments stroke bodies for action or information eg corporate management board it's the cmb i think heads of service group
02:34:35 service group now
02:34:38 first is it right that the odcb was expected to be at the heart of any substantive policy revisions
02:34:49 you get that from the first line and second line there changes to strategies and policies uh
02:34:57 uh yes
02:34:58 yes um
02:34:59 um can i just say um i don't have any first-hand recollection of this document so it's dated october 2013.
02:35:11 2013. i asked to see the second page earlier because i'm conscious that in reviewing evidence before today i've seen different versions of the terms of reference and membership of
02:35:22 the terms of reference and membership of odcb and i've definitely picked up some errors in those which i've reported back to my legal team um
02:35:28 um but this
02:35:31 but this i i
02:35:32 i i i just have a slight reservation about this document i don't know um i don't i have no visual recollection of it um but it refers to um
02:35:44 um but it refers to um approval of the annual babcock training delivery plan yeah and and i'm fairly certain we never did that um uh because because we didn't um i think the annual
02:35:55 because we didn't um i think the annual training delivery plan went to cmb and and sorry we had that discussion earlier about cnbcmt it's interesting this does refer to the corporate management board not the corporate management team but i'm i'm just
02:36:08 management team but i'm i'm just uh i'm just a bit anxious about the provenance of this document i'm i'm sorry i just need to say that because there are
02:36:14 there are some things about it that just strike me i mentioned earlier the head of finance and contractual services as against the director of finance and contractual services so there are just some small details in it that that make me that may
02:36:25 details in it that that make me that may be troubled about it i i think it's broadly absolutely spot on but i i just do have some reservations about its provenance well i was going to ask you because my next question what was the annual
02:36:37 next question what was the annual babcock training delivery plan but i think your answer is is this right it didn't exist oh no i think it did exist but it i don't think it came to i don't think it came to um uh odcb i think it came to
02:36:49 uh odcb i think it came to cmb i'm i'm fairly certain i've said to my i've seen a copy of a cnb report about uh
02:36:58 about uh plans with babcock during the preparation of my evidence and i'm pretty sure i identified that one of the appendices referred to in that cnb report was the draft uh annual plan and
02:37:10 report was the draft uh annual plan and and as it happens it was omitted from the bundle that i got but i noticed it i registered it wasn't there and that suggests to me that the babcock training delivery plan went to cmb rather than to
02:37:21 delivery plan went to cmb rather than to odcb right who was responsible for drafting this document i don't know mr millett um can you tell us what was the annual babcock training delivery plan
02:37:32 babcock training delivery plan uh
02:37:33 uh i think
02:37:34 i think uh
02:37:36 uh that the plan was produced within gary reason's command and gary will be much better equipped to give you an accurate um an accurate description
02:37:47 an accurate um an accurate description of the delivery plan uh well you say it came to the cmb indeed you were on the cmb i was i was presumably being on the cmb you got to
02:38:00 presumably being on the cmb you got to see the annual babcock training delivery plan yes that's it so what was it um
02:38:08 it was a plan that set out intentions for the coming year in terms of the intended delivery
02:38:20 in terms of the intended delivery program of training within the organization and what role did the cm be have in relation to that plan
02:38:32 to scrutinize it and
02:38:36 and approve it i can't i can't as a matter of fact remember whether it was then referred to the relevant committee of the authority for
02:38:45 for uh for approval as well so certainly a committee of the authority received i think quarterly reports on
02:38:56 on the progress of the delivery of the plan you know members were told how many courses of what type had been provided and how many people were in attendance and what the feedback was and
02:39:08 attendance and what the feedback was and a whole range of matters
02:39:12 but as a matter of fact i simply can't recall whether the plan went from cnb to a committee of the authority as a member of the cmb scrutinizing and approving
02:39:23 of the cmb scrutinizing and approving the annual babcock training delivery plan
02:39:29 plan what did the cnb scrutinize it against what tools did it use to examine that annual plan and decide whether or not to approve it
02:39:47 the tools it used were
02:39:52 the experience and knowledge of the members of cnb so there was no as it were
02:40:02 paper-based checklist um you know check if this is in the plan or that is in the plan or enough of this is in the plan or enough of that is in the plan you know if there was that kind of
02:40:13 you know if there was that kind of process that would have been happening long before it got to cmb um but as members of cnb we were
02:40:24 we were repositories of knowledge about the organization and about
02:40:32 and about issues that needed to be
02:40:42 covered by training activity but but the detailed building blocks of that
02:40:50 that were the product of the kind of processes that were described in peter grove's document how training works
02:41:00 works so as it were the heavy lifting of the detail happened in well established processes before they got to before the plan got to cmb
02:41:12 before the plan got to cmb but
02:41:13 but but the training plan wasn't i think we were going to a group of strangers who had no ability to assess whether um
02:41:25 um it was a good plan or a completely bonkers plan as members of cnb we all had
02:41:31 had functional responsibilities that we were discharging on an ongoing basis which gave us
02:41:37 gave us i believe sufficient competence to form a view about whether the training plan was the training plan that we wanted for the organisation in the year ahead
02:41:45 ahead how would you know from your own experience as one of the members of the cmb approving that plan whether anything was important was missing
02:41:56 missing uh
02:41:57 uh well i think if so i think you've already heard that um the training team as i will call them um i'm sure they've got a more complicated title but the training team worked with
02:42:11 title but the training team worked with heads of service and many others to as it were gather up intelligence about what those heads of service believed to be necessary in the coming year
02:42:23 necessary in the coming year and
02:42:24 and if what those heads of service had asked for as it were didn't find its way into the training plan um then i'm certain that you know in my case it would have been raised with me
02:42:36 case it would have been raised with me so if for example steve turek has had a fire safety regulation at that time had told the training team that he wanted
02:42:45 wanted a new course for fire safety inspecting officers and he wanted 100 places to be provided over a specified period of time if that hadn't materialized in the final
02:42:56 if that hadn't materialized in the final plan steve would have come to me and said look i asked for this and i haven't got it
02:43:01 got it and i don't want to make cmb sound like a bartering process it you know genuinely wasn't like that but there were mechanisms for um
02:43:09 um or there were opportunities for heads of service to come to their line manager and say look i think this is really important and it's not in the plan or it's not the right priority
02:43:20 plan or it's not the right priority um so there were there were corporate processes
02:43:23 processes for
02:43:24 for assembling a plan which met the priorities that heads of service had discussed with the training team and which
02:43:34 which prioritized them and i i don't recall it but i think it's likely that the plan set out
02:43:41 set out some explanation of the priorities and you know the way they had been determined what involvement if any involvement did the odcb have in
02:43:52 if any involvement did the odcb have in the
02:43:53 the assessment or agreement of the babcock annual training delivery plan i i don't think we we i don't think we did have any involvement in it
02:44:03 in it now can i
02:44:05 now can i take you to your statement please your first statement lfb3032733 page two uh sorry there's a document we're on it's not your statement it's this reference uh terms of reference
02:44:17 reference uh terms of reference um if we just go to the last part of what i've just been reading to you uh where it says decisions arising from this part of the agenda will as appropriate be referred to other departments stroke bodies for action or
02:44:29 departments stroke bodies for action or information for example corporate management board heads of service group were any of the odcb's directions or recommendations mandatory no
02:44:39 no oh oh sorry uh i shouldn't have answered that so quickly um i don't think that's a question we ever asked or answered right
02:44:47 right uh did the odcb ever follow up on these referrals
02:44:55 yes yes so part of the diet process [Music]
02:45:01 [Music] as part of that process we
02:45:05 we take a report from the operational assurance team which made which provided us with information about their observations based on their work as ort
02:45:16 as ort or audits or um
02:45:20 um prcs or pros and you know there's a list there's a list of contributing processes
02:45:31 that resulted in the reports to odcb from operational assurance so
02:45:37 so we would take those reports
02:45:40 i can't think of any occasion where we rejected the recommendations of the operational assurance team about what to take forward as policy
02:45:52 take forward as policy or training that may have happened but i i don't recall any examples of it um
02:45:57 um and
02:45:59 and uh
02:46:00 uh both
02:46:01 both in the olden days the ac training would take that away um and the ac ops procedures would take that away and at the next meeting
02:46:12 at the next meeting they would report back on the action they had taken in order to take forward the matters that we had decided at the previous meeting can we go back to the first page of this document
02:46:24 first page of this document and let's look together at section 2 sources of intelligence and it says there underneath that regular reports and there are five senior accident investigations sai
02:46:36 senior accident investigations sai mobile data terminals impd diot and babcock international and then underneath that as required and there are some more audits of operational professionalism training audits fire
02:46:48 professionalism training audits fire service circulars and other national guidance
02:46:51 guidance changes in legislation fire investigation fi reports fatal fire reviews
02:46:58 reviews now we'll come on later to look at some of those sources in more detail but i'd like to start if i can with d under regular reports diot or diode i think mr graves called
02:47:09 diot or diode i think mr graves called it diot yesterday how was it referred to as far as you know
02:47:16 diot and diode right okay well dynamic and intelligent operational training am i right in saying that i call it diat is a process not an entity or a department
02:47:27 a process not an entity or a department uh yes so it's a policy and a process so uh it it is it is a policy yes right now um if we look at your first witness statement please at lfb32363
02:47:39 statement please at lfb32363 please page five i just want to look at paragraph 17 there just to remind you what you say um
02:47:45 um you say then i'm summarizing that the delivery of of the objectives of diat was the responsibility of the odcb now would it be fair to say that in fact
02:47:57 now would it be fair to say that in fact that the odcb's work was centered around the diot process
02:48:07 yes but not to the but not all-consuming and not to the exclusion of other important
02:48:15 important matters
02:48:16 matters so
02:48:20 so
02:48:24 we've referred to or i've referred to mobile data terminals and the need for odcb to be [Music]
02:48:39 advised as to progress with our objectives for mobile data terminals but [Music]
02:48:47 [Music] sometimes
02:48:49 sometimes important standalone policies or proposed new policies also came to odcb so so yes your point is correct but i wouldn't i wouldn't i
02:49:01 is correct but i wouldn't i wouldn't i wouldn't want you to think that it was the only thing right well my perhaps the full lay in my question but uh that is it right to say that the um that uh the delivery of the dealt objectives was
02:49:13 the delivery of the dealt objectives was the main responsibility of the adc yes can we then look at paragraph 16 and um in the third line there you say and to be fair to you you are quoting
02:49:24 and to be fair to you you are quoting from the diat policy lfb 825 you say in the fourth line the diat process monitors operational health and safety and training performance and identifies
02:49:35 and training performance and identifies positive and developmental trends and provides mechanisms including training developed both internally and externally to support the maintenance of competency for all operational staff
02:49:46 staff and without wishing to be rude what does that mean in real life
02:49:53 um
02:49:58 you see i'm reading it and um it makes it makes sort of perfect sense to me which
02:50:05 which shows something about my incorporation into the work of london fire brigade i uh i guess
02:50:13 is it i mean let me try and help does it simply mean learning from mistakes in fighting fires well certainly learning from mistakes but also learning good things
02:50:24 but also learning good things i think one of the things that the operational assurance department were trying to do
02:50:32 was also to it was also to uh promote good practice um not just as it were deficient practice um
02:50:43 um but yes that that wouldn't be a very unfair summary yeah
02:50:48 i mean we haven't been at this evidence in this module for very long but
02:50:55 but uh people watching it might wonder
02:50:59 wonder why the lfb got itself into a position where it had a sort of juggernaut like of grand structures and nomenclature and initials
02:51:08 initials uh which is quite difficult to penetrate from the from the outside my question did it ever occur to you
02:51:16 you that the structure within which you were working uh was clunky uh and difficult to manage uh where lines of communication didn't work very well
02:51:28 uh and you got enmeshed in it all no
02:51:33 no no
02:51:36 london fire brigade is a complicated organisation often
02:51:43 often necessarily so possibly sometimes unnecessarily so but
02:51:51 but many people in london fire brigade are doing
02:51:55 are doing difficult
02:51:57 difficult intricate
02:51:58 intricate things
02:52:00 things um
02:52:01 um and and you've seen an abundance of that in the inquiry and you know have had already quite a lot to say about it and doubtless will have a lot more to say about it but um
02:52:15 from my own perspective when i joined london fire brigade my local government friends thought you know why why are you doing that you know it's a fire brigade they just send fire engines out to fight fires well it's it's not
02:52:28 out to fight fires well it's it's not like that um it's you know it's a more complicated interesting and difficult organization and
02:52:39 and um
02:52:41 um um things fit together internally in ways that just are much more complicated but
02:52:49 but i i think
02:52:51 i i think that i
02:52:53 that i am inclined to be vigorous about where things have been over complicated i think you know my statement could have been enormously more complicated if i'd still been within london fire brigade
02:53:05 still been within london fire brigade when i prepared it but i i think it's reasonably plain and so my point is that if i i didn't lose any of my old skills when i joined london fire brigade and if i came across things that were
02:53:16 came across things that were ridiculously complicated because that's how they did things then i would have sought to change them so no no i i think it does have problems with vocabulary and acronyms um
02:53:27 with vocabulary and acronyms um and some of it's irritating but more of it is necessary than not i feel thank you well we'll cut we'll let's see how we go with that answer because it may be that um there may be that as we
02:53:39 may be that um there may be that as we go we might find instances but um going back to diat did the dioct process operate like this tell me if this is oversimplifying it miss dexter that the odcb would receive
02:53:52 miss dexter that the odcb would receive reports good or bad from incidents or training events and then consider whether new training or policies were required
02:54:01 required uh
02:54:02 uh rarely from individual incidents but from
02:54:06 from uh
02:54:08 uh from analysis of individual innocent incidents so that's what the operational assurance team would do yes they would you know gather intelligence about
02:54:19 you know gather intelligence about hundreds of incidents in each reporting period
02:54:26 i've lost focus on the question mr millet i'm sorry no i think i've answered it thank you is it right that the odcb's primary output as a result of the diot process was lfb's operational news the
02:54:39 was lfb's operational news the newsletter well operational news plus what went with it um so either the amendments to policies and all the amendments to training yes
02:54:51 and all the amendments to training yes and just focusing on the newsletter and operational users this right was published quarterly but then became i think is it right biennial
02:55:02 i don't think i can speak to frequency uh mr miller i uh
02:55:09 uh somewhere between quarterly and six months later yes it'll be a matter of fact
02:55:13 fact what purpose did operational news serve to communicate in a in a more straightforward way for the benefit of those on
02:55:25 for the benefit of those on fire stations the findings of the operational assurance processes and to
02:55:36 and to provide stations with information about how the brigade intended to respond
02:55:45 respond um but some things were not some some of the things that in that were in operational news were not the product of diet um
02:55:54 diet um so operational news sometimes there was an operational news special so i think there's one about the olympics for example um
02:56:03 um but it also from time to time contained information about
02:56:08 about uh for example new equipment so there would you know there wouldn't have been a need for the new equipment to be part of diat but we might want crews to know that there was new
02:56:19 was new uh new items of equipment and sometimes that would be communicated via operational news right were you aware of other publications we've identified two
02:56:30 other publications we've identified two i think shout and update
02:56:34 uh
02:56:36 you then you've failed to identify safety matters which was another right
02:56:44 shout might have been before my oh it might have been early in my tenure in the brigade um
02:56:52 um in common with everywhere that i've worked you know from time to time there are reviews of uh the communications machinery and uh discussions about what works better
02:57:03 uh discussions about what works better and what works not at all and so over time
02:57:08 over time we took a view about the range of publications and their target audiences and their intended purpose so um i think while i was deputy
02:57:19 so um i think while i was deputy commissioner we certainly emerged safety matters and operational news because of the overlap in content yeah but the relationship with um shout and update i i just can't
02:57:31 with um shout and update i i just can't remember i'm afraid and did did operational news go to the
02:57:37 the um
02:57:38 um operational directorates the staff or senior staff and the operational directorates as opposed to um
02:57:45 um station-based firefighters oh both um yeah it was freely freely available to all right so it was it was it was it's its main target audience was
02:57:56 it's its main target audience was station-based staff but you know it was truly available throughout the whole of the organization and that that distinction didn't exist yeah right and what about update um
02:58:07 um i don't remember update i'm afraid i'm sorry right now let's look at the diot policy which is lfb3055171
02:58:18 uh i'll just show you this um we
02:58:21 we seem to have a blank uh on
02:58:25 uh on the evidence no we don't thank you let's come back very good yeah well there it is um and it's dated the 11th of april 2013 policy 825
02:58:34 825 and if we turn please to page two let's look together at paragraph 1.2 which says the authority has a statutory duty to ensure that all operational staff are trained to undertake their
02:58:45 staff are trained to undertake their role effectively and safely training requirements for operational staff include a number of generic call risk critical skills that all staff must develop and maintain to work effectively in teams and with the communities they
02:58:57 in teams and with the communities they serve these core skills are detailed in policy number 427 the development and maintenance of operational professionalism or daimop now would you agree
02:59:08 now would you agree that
02:59:10 that those two principles identifying risks to operational staff and seeking to provide training were central to the function of the diat
02:59:19 the diat policy and process and the odcb
02:59:36 would you ask that again um will you see i've shown you paragraph 1.2 yes um let me look at 1.5 with you um the diot process enables the effect
02:59:47 um the diot process enables the effect of identification and response to risk critical issues that have the potential to to effect i mean actually affect operational staff looking at that taken together with 1.2 would you agree
03:00:00 taken together with 1.2 would you agree that those two principles risks to operational staff and providing training accordingly were central to the to the to the diod policy yes and central to the extent
03:00:11 policy yes and central to the extent that it was covering diot to the odcb's functions
03:00:15 functions yes yes
03:00:16 yes yes now um
03:00:17 now um on page two while we're on it can we look at paragraph 2.2 under background the various stages of the process can be grouped into the following five main steps
03:00:26 steps and there they are and i'll read them to you because we're going to look at each step in detail as we go through your evidence one gathering and recording two deciding
03:00:36 deciding three acting application four evaluating and five feedback now as i say i want to explore each of those in turn starting with step one
03:00:47 those in turn starting with step one gathering and recording now that step is summarized on page four of this policy if we go to that please we find it on paragraph three point in paragraph 3.1
03:00:59 paragraph 3.1 which says a significant amount of data is used to drive the diot process and allow the identification of initiatives and revised training practices which are necessary to bring
03:01:10 practices which are necessary to bring about performance improvements during the gathering and recording phase a number of processes and electronic systems are used to gather and record information relating to the performance
03:01:21 information relating to the performance of individuals teams and the organization these include and then there's a list
03:01:28 and the first on the list is the incident monitoring process or imp
03:01:36 imp and if you just bear with me look down then at the next paragraph paragraph 3.2 of the policy it says this the imp is a computer-based database that provides a means to record and identify
03:01:48 provides a means to record and identify both positive and developmental trends arising from operational and training events
03:01:53 events information is recorded against a range of defined criteria that describe individual and team performance the database also allows staff to capture information relating to the use and application of operational training
03:02:05 application of operational training equipment and procedures as well as liaison with other agencies such as the london ambulance service and the metropolitan police now
03:02:13 now first is it is it correct that the information in the imp database formed the basis for a number of reports that were received by the odcb yes
03:02:24 yes and the database which i think is called the impd you've referred to it before was actually central to the odcb's analysis of the lfb's operational performance
03:02:35 performance is that right
03:02:40 yes yes it was central but not exclusively so yes no who was responsible for recording information on the impd
03:02:50 the impd the information sorry the incident monitoring process database um
03:02:57 so um a range of people might create records in imp in the incident monitoring process
03:03:08 in the incident monitoring process database um so following
03:03:13 following some but not all i think incidents one
03:03:19 one and or two things would happen first of all there might be a performance review of operations and secondly there might be a performance review of command
03:03:33 performance review of command now
03:03:33 now dave brown and or gary reason will be able to speak with much more authority about these two things then i am able to so my
03:03:44 then i am able to so my insight into the detail of pros and prcs is
03:03:50 is limited
03:03:51 limited so i did from time to time attend
03:03:55 attend both to
03:03:56 both to learn more about what happened right but pros and prcs would generate i can't remember whether they were
03:04:07 i can't remember whether they were described as action points or development points we were always trying to be
03:04:11 to be careful about vocabulary and not
03:04:14 not avoidably impute um failure um but it would there would be as it were a post-mortem of what happened at the incident and in turn that would generate
03:04:27 and in turn that would generate um action points to be taken so the incident commander might say to uh firefighter blogs you know you did that really well and whatever that was would might be
03:04:39 and whatever that was would might be recorded on the database um but um
03:04:43 um but um the incident commander might equally say to firefighter blogs actually you know it might be a good idea if you you know went back and looked at this case study or this item of training or you got some
03:04:56 or this item of training or you got some more experience of you know a or b um so for the individuals involved in the incident there would be a range of observations
03:05:09 there would be a range of observations good or bad and that would be true both of pros and prcs and they would be available on the database for the operational assurance department to review
03:05:18 review can you just help me with this um
03:05:22 um while listening to your answer i've been reading
03:05:24 reading some of the paragraphs here and it prompts me to ask who is this written for
03:05:29 for who's the target audience so to speak um
03:05:34 well it was an internal document i think it i think it was created in 2006 from memory and
03:05:44 and i think it was created in response to um what i would call the bethnal green fire in which two firefighters died and so following that event and they're all 43 from that event
03:05:57 all 43 from that event there was a whole scale rethink about how
03:06:02 how lessons from incidents uh were learnt and diet was introduced i think in 2006.
03:06:12 did mr millett say this was the 2013 version
03:06:16 version um
03:06:17 um uh
03:06:18 uh but it will also have been written with as it were um external readers in mind so the health and safety executive i think
03:06:26 think would be likely to expect a fire brigade to have a written policy of this nature and
03:06:34 and for
03:06:34 for external
03:06:36 external inspection processes for example we always knew that the inspectors would want to see our policy on this that or the other so they were written principally for
03:06:47 they were written principally for internal processes but the process of codification of policies and processes was undoubtedly also important for demonstration of um
03:06:58 um a
03:06:58 a conscientious application of in this case the desire to learn to external organizations to demonstrate somebody's thought about these things yes yes thank you very much can we then
03:07:10 yes yes thank you very much can we then look at paragraph 3.3
03:07:13 which i think enlarges on your answer earlier a little bit more entries on the imp should be the result of exception reporting only i.e where performance of an individual team piece of equipment or
03:07:24 an individual team piece of equipment or organizational issue has either fallen below the required standard or has exceeded expectations monitoring officers must submit entries even if there are no exceptions to report quotes
03:07:35 there are no exceptions to report quotes on quotes the imp database automatically prompts monitoring officers who attended an incident so submit an entry on the inp every seven days until a submission is made
03:07:44 is made and then i'll just look at the next three subparagraphs of the policy all comments on the inp should be discussed with the recipient before prior to recording this does not mean the author requires the recipient's agreement to
03:07:55 requires the recipient's agreement to enter a comment but ensures an open transparent and fair process once submitted each entry is verified and processed by the incident management policy group verified comments relating to the
03:08:07 verified comments relating to the actions of specific individuals are automatically emailed to them and their line manager station manager and above as confirmation in addition the inp comment is automatically added as an observation within the individual's
03:08:19 observation within the individual's personal development plan pdp now it's called exception reporting uh or falling below the required standard
03:08:30 standard how was that defined was there an objective yardstick by by which
03:08:37 which a decision was made to report or when a particular individual or piece of equipment fell below the required standard
03:08:45 standard um
03:08:47 um i i don't know whether there was
03:08:51 there was guidance for those conducting pros to peer or prcs um on that matter it's possible that there was but i simply don't know i'm afraid okay now other than for
03:09:03 afraid okay now other than for monitoring officers is it right i think that the inp was voluntary
03:09:11 well this says not doesn't it because it asks for
03:09:18 asks for nil returns well indeed oh no exceptions to report
03:09:23 to report [Music]
03:09:26 sorry what was your question well my question is other than for monitoring officers for whom imp entries were mandatory but is it right that the inp system was voluntary
03:09:37 voluntary uh not
03:09:40 uh not not quite i don't know if you're going to go to mandatory as an alternative um no there were there were criteria for when a pro or a prc should be conducted
03:09:52 when a pro or a prc should be conducted and there would be an expectation in relation to those that were conducted that as it were output should appear in the database during your your time as deputy commissioner
03:10:05 deputy commissioner uh
03:10:06 uh would you agree that it's take up the use of the imp system uh was poor uh
03:10:15 uh it it certainly was poor initially i believe it you know it got better certainly not to the not to the level that we ideally would want but the operational
03:10:26 ideally would want but the operational assurance team would report to odcb what the take-up was would tell us what the take-up was and at least two things would happen as
03:10:39 and at least two things would happen as a result of that possibly more but but one of the two things was to communicate back to station-based staff via operational news
03:10:51 station-based staff via operational news that
03:10:52 that um
03:10:55 um this was not intended to be um a punitive thing which is which is what was reported as the fear about it that um you might get in trouble if you admitted a fault or a failure so
03:11:08 admitted a fault or a failure so there were there were issues to be dealt with where we tried to provide reassurance and i'm sure you'll have seen that in operational news from time to time there were articles about what the purpose of this process was that it
03:11:20 the purpose of this process was that it was intended to be an organizational and individual improvement process and so we we tried very hard to provide reassurance about that in order to improve the take-up
03:11:31 improve the take-up and so that's one of the two things that happened a second thing that will certainly have happened is that dave brown through his management processes will have tracked
03:11:42 management processes will have tracked that down to lower levels and will have been talking to the deputy assistant commissioners for example about the need to encourage um or require more use
03:11:54 encourage um or require more use um it feels likely to me that it was probably on an agenda for boro commanders uh meetings although i don't know that for sure but we took a range of actions to try and encourage
03:12:05 encourage um more use of the of the database but there was a level of anxiety about what it meant to record a failure as it were let's let's break up that answer into
03:12:16 let's let's break up that answer into some constituent parts but first by looking at a an impd report from september 2014. so only a few months before you left the lfb
03:12:28 you left the lfb it's at lfb four 3067840
03:12:34 and i want to go to page five in that document
03:12:39 uh impd trend analysis reports q4 and q1 january 2014 to june 2014 and as i say this document is dated september take that from me
03:12:51 september take that from me and here you can see on page five a grey pie chart which
03:12:56 which contains
03:12:57 contains details showing that out of 47 105
03:13:03 105 total incidents attended by the nfb one or more inp reports were made in 1679
03:13:10 1679 cases
03:13:11 cases now that's only four percent as a matter of arithmetic of the overall number of the incidents attended isn't it yes so that means doesn't it that some 96 percent the vast majority of lfb
03:13:22 96 percent the vast majority of lfb incidents during that period had no imp report at all
03:13:30 yes would you mind putting the whole the whole page back into it of course you're not quite right let's just look at that um yes
03:13:40 yes those numbers are correct um but can i also point you to um the introduction which says uh the data sets and narratives
03:13:51 uh the data sets and narratives continues to suggest a growing positive improvement in the use of the system the number of entries has again risen so is the quality and the number of positive comments so um i i think it's important to to draw that out but the incidents
03:14:03 to to draw that out but the incidents attended you know overwhelmingly the incidents attended by london fire brigade um
03:14:11 resulting not very much action if any at all um so if this is incidence attended um
03:14:20 um you know this will include incidents where
03:14:23 where appliances arrived and immediately returned for example because the incident was as it were over but it's still an incident in fire brigade recording terms so
03:14:35 so i can't remember what follows whether this analysis um goes more to
03:14:45 a more refined version of incidents um
03:14:53 you're right about the numbers mr millet but i but i would say um you know we were very keen to um encourage more take up and and and you you see that referred to in
03:15:06 and and you you see that referred to in in the introduction i mean
03:15:09 i mean i haven't actually got to asking a question but you you drew attention to
03:15:15 to the positive first paragraph on that page
03:15:18 page um
03:15:20 um whatever the improvement might have been it was starting from at least arithmetically a very low base i don't disagree with you no now and if you do look if you look at the split
03:15:31 look if you look at the split of the incidents uh you've got fires representing some 45 percent
03:15:39 percent so
03:15:40 so of those incidents they were actual fires weren't they well they were mobilized i suspect they were mobilized to a fire
03:15:49 it might be a fire that was out by the time they got there and there was you know what i don't know from this is those incidents where for example no firefighting action was required
03:16:00 firefighting action was required um
03:16:01 um um so i'm just being cautious appropriately i think based on experience about what what the big numbers tell you that is of
03:16:10 is of very much used to you in this context but i'm not disagreeing with your basic proposition that it would it was hard to uh
03:16:19 uh it was hard to encourage um
03:16:22 um uh contributions to this and you know it is likely to be the case and that the overwhelming majority of incidents uh captured by that 47 000 headline um
03:16:35 captured by that 47 000 headline um involved
03:16:36 involved nothing of significance to report um it's not because there were i don't i don't believe it is because there were lots of very important things that were happening that people were avoiding reporting there might have been
03:16:49 avoiding reporting there might have been you know some instances of that in some incidents but you know
03:16:53 you know the 47 000 um headline number is is maybe creating the wrong impression here well let's just look at page one of this document this
03:17:04 this pie chart has forms part of an incident monitoring six monthly report yep uh uh and presented to an odcb meeting uh in september 2014
03:17:17 uh in september 2014 by dac graham ellis from operational assurance can we take it that the odcb of which you were a member would have seen or did see this document
03:17:28 seen or did see this document yes so you would have seen this document yes did you ever ask the question um how is it the case that 96 of incidents have returned no
03:17:39 that 96 of incidents have returned no imp
03:17:40 imp at all
03:17:42 i don't believe i did ask that question miss mr millet for for the reasons i've just explained a because
03:17:53 we would not have been looking for inp contributions on the 47 000 incidents um be because
03:18:04 be because we knew that there was an issue to be worked on in terms of improvement and we were working on it um so no i didn't ask that question no no or i don't
03:18:16 no or i don't to the best of my memory i didn't ask that question september 2014 no no i you know i i received this report in a context of some knowledge about what we were trying to do with impd and and how
03:18:27 were trying to do with impd and and how we were doing um so it it wasn't the first or only report that i received as it as it as it were i had some understanding of you know what was what was beyond that page as it
03:18:38 what was what was beyond that page as it were and those numbers yes and presumably you'd seen earlier reports of this nature yes did nobody at any time ever grapple with with the statistics
03:18:50 grapple with with the statistics that on their face this document to shows you well we grappled with the issue for sure uh so you know the important thing was was the issue and you know they're not
03:19:02 was the issue and you know they're not very you know that's not a very refined statistic um so uh
03:19:10 uh the 47 000 um uh
03:19:13 uh number
03:19:15 number um but
03:19:16 um but i i'm confident it didn't obscure my understanding or the understanding of my colleagues about about what was happening you know we were really clear that we wanted
03:19:27 that we wanted more take-up in the use of impd and and i hope you'll find data that demonstrates that that was successful well mr chairman it's it's a reasonably convenient moment
03:19:38 it's a reasonably convenient moment given that it is one o'clock well if it is a reason it is reasonably convenient i think that's we will be returning to this topic immediately after the breakdown yes well miss dexter we're gonna have a break now so we can all get
03:19:49 gonna have a break now so we can all get some lunch uh we'll resume please at two o'clock
03:19:53 o'clock and as with all other witnesses i must ask you please not to discuss your evidence or anything relating to it with anyone at all while you're out of the room all right thank you very much would you like to go
03:20:05 thank you very much would you like to go with the usher then please just behind him
03:20:18 thank you two o'clock then please