Evidence from David Kerry, RBKC contingency planning manager, about emergency preparedness, staffing shortfalls, and lack of training before the fire
00:00:22 so
00:00:31 good morning everyone welcome to today's hearing
00:00:34 hearing today we're going to hear evidence from the first of the witnesses from rbkc
00:00:40 rbkc yes mr miller yes mr chairman good morning good morning to you good morning members of the panel i now call please mr david kerry
00:00:56 good morning mr kerry good morning i understand that we're going to affirm yes please the words are on the screen would you read them out please i dishonorably sincerely and truly declare and affirm that the evidence i
00:01:07 declare and affirm that the evidence i shall give shall be the truth the whole truth and nothing but the truth thank you very much please sit down make yourself comfortable
00:01:17 [Music] right yes
00:01:20 right yes yes mr chairman thank you um mr kerry good morning to you can i start by thanking you very much for coming to the inquiry and assisting us with our investigations we're very grateful to you uh during the course of your evidence if
00:01:32 uh during the course of your evidence if i can ask you please to keep your voice up so that the person who sits to your right can get down on the transcript everything you're saying in a clear way we'll say please don't nod or shake your head you have to say yes or no as the
00:01:44 head you have to say yes or no as the case may be because gestures don't come out on the transcript if during the course of my questions there's a question you don't understand or you want me to repeat or put in a different way i can do that
00:01:55 different way i can do that i should also say that we're going to be taking breaks in the normal way mid-morning and mid-afternoon but if you need a break at any other time please don't hesitate to say and we can do that we can take a break thank you now um
00:02:07 we can take a break thank you now um we've you provided two witness statements for the inquiry um they will appear as will all other documents i'm going to show you on your screen in front of you your first statement is at
00:02:21 five rbk303357 nine please if you look at the first page can you confirm that that is the first page of your first statement yes
00:02:30 yes and uh if you go please to page 26 you can see a date and a signature at the bottom of the screen
00:02:39 page 26.
00:02:59 um there's your name under the statement of truth and above the date of the 30th of october 2018 is a signature is that your signature yes thank you um can we please go to your second statement uh
00:03:11 please go to your second statement uh which is rbk3058091 [Music]
00:03:17 [Music] and can you confirm that that's your second aftermath witness statement yes and if we turn please to um page 58
00:03:25 you can see that at the top of the screen is your name under the statement of truth which i think appears on the previous page there's a signature above the date of the 11th of march 2020. can you please confirm that that is your signature yes have you read these two
00:03:37 signature yes have you read these two statements recently yes can you confirm that their contents are true yes thank you now i want to ask you first about your professional background and just this is a yes no exchange
00:03:49 this is a yes no exchange but if it's if it's not let me know um is it right that from october 2005 until you retired in september 2019 you were manager of the contingency planning
00:04:00 were manager of the contingency planning team at the royal borough of kensington and chelsea rbkc yes and i think in your statement you refer to contingency planning and emergency planning
00:04:11 planning as interchangeable terms referring to the same activity is that correct that is correct yes now is it right also that you have an extensive history of working in the field of contingency or emergency
00:04:23 in the field of contingency or emergency planning
00:04:24 planning yes oh yes yes and i think it's right that before you joined rbkc you worked at the london borough of hanslow from 1990 as the contingency officer and then later as head of contingency planning
00:04:36 later as head of contingency planning yes and i think that was until you moved to rbkc in october 2005. yes yes now in your statement you've set out that your career in emergency planning was was born out
00:04:47 in emergency planning was was born out of interest and experience rather than formal qualifications is that correct that is correct yes and is it right that over the years you've completed emergency planning courses and attended a number of seminars workshops and
00:04:59 a number of seminars workshops and exercises yes and sat on a number of regional working groups and committees over the years which you've touched on in your statement yes and i think just specifically can you
00:05:10 and i think just specifically can you confirm in particular you were a practitioner advisor to the lap the local authorities panel which forms and in june 2017 formed
00:05:21 in june 2017 formed part of the london resilience forum yes and you held that role i think until 20 september 2017 is that yes yes and were you also a member of the emergency planning society
00:05:33 emergency planning society yes and held executive posts i think within that body quite a long time ago but yes yes would it be fair to say in general that you had as at june 2017 an extensive
00:05:45 you had as at june 2017 an extensive understanding of the field of emergency planning and the framework within which rbkc operated i believe so yes yes and that would be safe at a local regional and national
00:05:57 safe at a local regional and national level
00:05:58 level local and regional some for national but certainly local and regional very well now i wonder if you could help us then with understanding the mysteries of the civil contingencies framework
00:06:10 contingencies framework um you you told us that you joined rbkc in october 2005 and that was at a significant time was it in emergency planning because the civil contingencies act 2004 had just come into force
00:06:23 act 2004 had just come into force uh yes it was actually coming into force proper in november 2005. so i arrived at the authority just before the acts requirements became
00:06:34 requirements became whatever the word is right in
00:06:37 in into effect right now it may assist everybody at this stage particularly the panel if you help us in explaining rbkc's responsibilities as a local authority under the civil contingencies
00:06:49 authority under the civil contingencies act and the supporting regulations so what i'm going to put to you is is really a set of questions confirming an eliciting understanding of how it worked now is it right that for the purposes of the civil contingencies framework a
00:07:02 the civil contingencies framework a local authority or la is a category one responder yes and in simple terms is it right that a category run responder is an organization at the heart of an emergency response which includes the
00:07:14 emergency response which includes the emergency services local authorities and nhs bodies correct yes and is it right all say that the um the civil contingencies act places a
00:07:25 um the civil contingencies act places a number of duties on category one responders yes and those included did they the duty to assess the risk of an emergency occurring yes and maintaining plans to ensure that
00:07:37 and maintaining plans to ensure that they're able to continue to perform their functions in an emergency yes and is it also right the category one responders are required to cooperate with each other in connection with the performance of
00:07:48 in connection with the performance of their cca duties yes and that that would include um a local resilience forum you would have to cooperate with a local resilience forum such as the lrf yes yes and i think in
00:08:01 such as the lrf yes yes and i think in london the the london resilience is a
00:08:05 is a a broad term is it just which would identify the civil emergency arrangements in the capital yes can we just go then to lfb
00:08:16 lfb 3061162 page seven and what i'm showing you on the screen here
00:08:21 here is the london resilience forum chart that
00:08:27 that the panel saw in the opening of this module and to the best of your understanding was this the structure or shape of the london resilience forum as at june 2017 yes it was right and you
00:08:40 at june 2017 yes it was right and you can see there in the northwest corner if you like the local authorities panel sitting alongside other panels including the voluntary sector panel the faith sector panel
00:08:51 sector panel utilities emergency services environment agency
00:08:56 agency all fed into by a number of other capabilities and boards now um if you um go please to your first statement at rbk3033579
00:09:08 page 4 paragraph 14 is a long paragraph but
00:09:16 but let me ask a question from it is it right that the council fits into the regional planning arrangements which would include the london resilience forum
00:09:24 forum yes it is
00:09:26 yes it is and i think the forum is not an entity it's not a body of its own it's a collection an umbrella collection of organizations it is yes uh and in addition to the nrf the london
00:09:37 uh and in addition to the nrf the london resilience forum there's also something called the london resilience partnership is that right yes and is that an umbrella for 170 organizations who are both category 1
00:09:49 organizations who are both category 1 and category 2 responders yes i think that's a good description right and i think it is is this right it also includes other organizations who are not classified as responders by the cca such as the
00:10:01 responders by the cca such as the military yes yes i see uh and also voluntary and faith sectors i think you are not category responders at all now um if we turn the page to page
00:10:12 all now um if we turn the page to page five of your statement first statement paragraph 15 you explain that the lrf the london resilience forum is split up into sector panels as you say in the first sentence there
00:10:24 as you say in the first sentence there and they represent the interests of different sectors and um you say in the second sentence their third line the remit of the local authorities panel lap is to essentially bring together where
00:10:36 is to essentially bring together where appropriate the 33 local authorities across london as a council it is obviously the la panel which is most relevant to our work the lap consists of six chief executives one for each of the
00:10:48 six chief executives one for each of the six sub-regional groupings of boroughs and an additional chief executive as chair of lap lap is supported by a secretariat provided by the london resilience group
00:10:59 provided by the london resilience group and by a liaison officer a emergency straight contingency planning manager from one of the 33 la's also assists as practitioner advisor i held this position until september 2017. i've
00:11:12 this position until september 2017. i've read that out in full um what was the relationship um
00:11:17 um between the nrp and the lrf the london resilience panel partnership and the london resilience forum
00:11:26 forum oh i'm slightly not sure how to answer that
00:11:31 that which sounds a bit silly i know forgive me uh so the london resilience forum it was the formal body as constituted by the legislation and that gave it responsibilities the london resilience partnership i
00:11:43 the london resilience partnership i would best describe as being that much broader collective of organizations that in one way or another would work with each other and support each other to develop plans
00:11:55 all of that supports the overarching role of the london resilience forum right now the lap as you say here was a panel comprising all 33 authorities across london
00:12:06 london whether were they also members of the lrp
00:12:10 lrp because they were category one responders i think yes i think that would be a yes right so just help me a local authority such as rbkc would be a member of the london resilience
00:12:22 be a member of the london resilience partnership but also through the lap a member of the lrf
00:12:27 lrf the london resilience forum certainly through the lap a member of the forum and the lap represented all 33 local authorities for that you'll have to forgive me passage of
00:12:38 you'll have to forgive me passage of time i'm not entirely certain that the of what the relationship with the london resilience partnership was and whether the local authorities were a part of that or whether the local authorities
00:12:50 that or whether the local authorities panel was you'll just have to forgive me i'm
00:12:53 i'm struggling to understand particularly which line goes where in terms of that wider definition of the resilience partnership either way the lrg the london resilience group was
00:13:06 the lrg the london resilience group was was this right the the administrator the secretariat supporting the the members of the london resilience forum yes right now you as you told us were practitioner
00:13:18 now you as you told us were practitioner advisor to the local authorities panel the lap
00:13:22 the lap what did that role entail so the local authorities panel had two parts to it the the formal panel that reported or or represented the
00:13:33 that reported or or represented the authorities to the london resilience forum those chief executives was the strategic
00:13:38 strategic local authorities part sitting below that was the local authorities panel implementation group that shadowed if you like with
00:13:50 that shadowed if you like with six
00:13:51 six emergency planning managers and support by the london resilience secretariat and what we did at that level and i was as the practitioner advisor i also sat on that implementation group
00:14:03 implementation group we would
00:14:04 we would look at strategic issues the panel wanted to consider and provide that professional view would this work would it not did we need resources did we think something else so
00:14:16 resources did we think something else so a practitioner view up to the strategic chief executives and my job was to be a part of that implementation group there and then when the panel met
00:14:27 and then when the panel met to sit as an advisor to that panel if called upon to ask any particular questions as a practitioner so i wasn't a member of the panel as a speaking
00:14:38 a member of the panel as a speaking voting member but i was a part of the support crew there to provide a professional opinion should that be requested but rbkc was a member of the panel
00:14:48 all 33 local authorities were part of that panel represented by their sub-regional chief executive now a sub-regional chief exec who was the sub-regional chief executive
00:15:01 who was the sub-regional chief executive so i think at the time of the fire it was elena kelly who was the chief executive at southwark before eleanor kelly it had been charlie parker the chief executive of westminster
00:15:12 chief executive of westminster before charlie parker i think it had been the chief executive of merton so over years within each sub-region there would be a number of local
00:15:23 there would be a number of local authorities one of their number would represent all of those chief executives i follow so so is this the same thing as the srrfs the sub-regional resilience forums yes i see and what role did a
00:15:36 forums yes i see and what role did a sub-regional resilience forum have within the structure as of june 2017 so as of june 2017 the sub regional resilience forum were
00:15:48 resilience forum were fairly recent i've forgotten when they started as such it was an initiative to get the
00:15:56 get the emergency planners and their managers within that area together regularly to talk about issues to support each other to look at
00:16:07 to support each other to look at trading and exercising across the sub-region sharing information and advice i see
00:16:14 i see and
00:16:15 and how did
00:16:16 how did that function differ from the lap implementation group that you've just explained
00:16:23 explained so the implementation group was very much taking its brief from the local authorities panel the local authorities panel looking at the strategic development of our emergency plans
00:16:35 development of our emergency plans might set objectives or future work programs at the implementation group we would work out how do we actually as practitioners across the 33 local authorities how do we implement the strategy that chief executives wish us
00:16:48 strategy that chief executives wish us to do
00:16:49 to do right and were the members of the implementation group drawn from the srrfs or vice versa it was an emergency planning manager one
00:17:00 it was an emergency planning manager one from each of the srfs yes right i see so the answer is yes uh and now um just to be clear if it's possible um
00:17:11 if it's possible um is this right the in in this particular case i'm sorry there's a let me back up is it right that below the sub-regional resilience forum the srrf there's there
00:17:22 resilience forum the srrf there's there was something called the borough resilience forum yes brf right and and that encompassed the particular individual local authority is that right yes so each local authority
00:17:34 that right yes so each local authority in london for the sake of argument was a borough resilience forum yes right sorry may i say each local authority was a member of the borough resilience forum
00:17:45 a member of the borough resilience forum the borough resilience forum wasn't a council body the council or the borough was a member of equally with other members of that borough resilience forum so how did this
00:17:57 borough resilience forum so how did this help me what was the relationship or difference between the brf the borough resilience forum and
00:18:05 and the sub-regional resilience forums
00:18:09 so the borough resilience forum was the local category one and some category two responders and any other organization by invitation very much looking at the localities
00:18:21 very much looking at the localities emergency plans where they spread across a number of agencies the sub-regional resilience forum and i'm just struggling to wonder whether i've tripped myself up somewhere
00:18:32 whether i've tripped myself up somewhere in the description of that because as i say they were newer
00:18:38 sorry let me start forgive me so council
00:18:42 council 33
00:18:44 33 london resilience panel and we had the six sub-regional areas so regional resilience forum you'll have to forgive me i am sorry but i'm now struggling to remember whether that was
00:18:55 struggling to remember whether that was just little authorities or whether that was a wider version of people it was a wider version so in a sense the subregion resilience forums as they had
00:19:08 become were the category one and catch the shoe responders covering that sub-region that included the six authorities the borough resilience forum was specifically a forum for the locality
00:19:21 specifically a forum for the locality for the individual borough so although some people would have sat on both there were a lot of organizations only sat on the borough resilience forum because they were more local
00:19:31 local okay i think so so is it the srrf would be a group of borough resilience forums
00:19:39 forums the borough resilience forums by 2017 and for about a year or so in advance had started reporting the outcome of their meetings the minutes of their
00:19:50 their meetings the minutes of their meetings to the sub-regional resilience forum
00:19:54 forum and i think the subregion was in its forum comes into being because it was too unwieldy for all 33 borough resilience forums to be reporting to one central london body and therefore the sub-regional
00:20:05 and therefore the sub-regional resilience forum enabled a a breakdown so therefore a better look at what the individual borough resilience forums are doing so so so just to see if we can cut through this
00:20:16 just to see if we can cut through this you have the london resilience forum you've got the six sub-regional resilience forums yes
00:20:23 yes and rbkc i think sat in the central group yes right and then underneath that you've got the borough resilience forums yes how many borough resilience forums were there per
00:20:34 borough resilience forums were there per sub-regional resilience forum as many as there were boroughs within that forum so the forums typically were six or seven boroughs so therefore the local authorities
00:20:47 so therefore the local authorities within a sub-regional resilience forum there would be the same number of borough resilience forums reporting so coming back to my point rbkc was a borough
00:20:55 borough and therefore a borough resilience forum sitting within the central group of sub-regional resilience forums yes right got that now is it right that you actually chaired
00:21:07 actually chaired brf meetings borough resilience forums between 2013 and 2016. yes yes and turning to your role then next within rbkc you cover that at paragraph nine of
00:21:18 rbkc you cover that at paragraph nine of your first statement on page three let's have that up this statement in front of us page three paragraph
00:21:25 paragraph nine
00:21:26 nine um you um explain there that the basic hierarchy and just correct me if this is wrong that you reported to stuart priestley he reported to tony redpath who was the director of strategy and
00:21:38 who was the director of strategy and local services and tony redpath in turn reported to nicholas holgate who was the chief executive and the town clerk of rbkc yes right and your role was to lead the
00:21:49 right and your role was to lead the contingency planning team yes yes can you just explain in brief what your role as contingency planning manager involved had two members of staff at that time so
00:22:00 had two members of staff at that time so i was their line manager my job was to provide the authority with an annual work program that reflected the sort of emergency planning that the
00:22:11 sort of emergency planning that the authorities should be engaged in our local plans where we fitted in with the regional plans uh training and exercises
00:22:19 exercises call out arrangements and liaising with other organizations primarily through the borough resilience forum i see and the two uh persons that you line managed were is this right they
00:22:31 line managed were is this right they were planning offices and am i right in thinking that that was rebecca blackburn and keith robbins correct emergency planning officers emergency planning officers uh and as at june 2017 who apart from you
00:22:43 and as at june 2017 who apart from you rebecca blackburn and keith robbins uh ignoring those above you in the hierarchy were part of the contingency planning team it was us three three
00:22:54 it was us three three and
00:22:55 and rebecca blackburn and keith robbins did they have other roles within the council or were they were they full time on contingency planning uh both full-time and contingency planning now i want to turn next to
00:23:07 now i want to turn next to pre-fire risk assessments and plans and start with assessment of risk um
00:23:13 um i think it's right isn't it that rbkc as a category one responder was required to maintain a borough risk register yes yes could you just explain briefly what a borough risk register is
00:23:27 so the borough risk register was to identify
00:23:32 identify risks of types of emergency that might apply
00:23:36 apply to quantify the likelihood and the severity and the impact of those risks and to note mitigation measures that organizations might have in order to
00:23:47 organizations might have in order to respond to those risks and let's go then to rbk 3036688 please
00:24:02 this is the borough risk register and you can see the date of issue at the bottom of your screen december 2016 uh issue 10 was this the relevant borough risk register as at june 2017
00:24:15 borough risk register as at june 2017 it was in partnership with the london regional risk register yes
00:24:25 regional if we go to page two we can see that it was prepared by keith robbins contingency planning officer is this right presumably under your oversight yes yes
00:24:39 and if we go to section 1.2
00:24:44 which you will see uh on
00:24:47 uh on uh
00:24:48 uh page three
00:24:52 turning to page five which is where the main part sits out profile of the run of royal borough of kensington and chelsea
00:25:01 you can see that it says who we are and it says more than one fifth of all households 16 389 of the first language that is not english this is the fourth highest
00:25:12 english this is the fourth highest proportion in the country and if you go on
00:25:18 go on a little bit below that
00:25:24 it explains that 61 of our residents have a uk passport
00:25:29 passport and there's a set of statistics set out there in the first paragraph at the head of the page
00:25:37 the page there's a more general description
00:25:43 uh which we can read for ourselves but pick up the the point in the middle it is also a borough of extremes with some of the wealthiest neighborhoods in the country as well as some of the most deprived
00:25:55 some of the most deprived statistics on deprivation show that north kensington and parts of earl's court and south chelsea face complex combinations of problems such as low incomes relatively high unemployment and
00:26:06 incomes relatively high unemployment and poor health and well-being [Applause] uh and then if we go to page nine in this document we can see a list of the borough's risks
00:26:20 and 3.1 table of risks risk one
00:26:26 risk one influenza pandemic epidemic risk two emerging infectious diseases uh
00:26:34 uh which is of of interest um but then under nine building collapse but nothing there for fire you see that
00:26:46 you see that yes does it follow that a fire in a tower block was not considered at the time this list was compiled to be a main risk
00:26:57 compiled to be a main risk for the purposes of the borough if i may provide a slight context to this particular document yes the main risk register for any london borough was dealt with
00:27:09 for any london borough was dealt with centrally by the london risk register
00:27:14 what we did as a borough resilience forum although this has got a borough council an rbkc logo and everything else we we actually worked with our colleagues in the borough risk in the borough resilience
00:27:26 borough risk in the borough resilience forum what we did with this particular documents was to say the london risk register covering all of the risks of london are there let's just draw out some of the major risks that might present the local
00:27:38 risks that might present the local agencies with more of a challenge in working together so it didn't list every single risk that possibly could be in kensington chelsea because they would have been listed within the london risk register there's
00:27:49 within the london risk register there's particular documents as they teased out what we thought as a collection of responding agencies might be the most challenging ones for us for a fire
00:28:00 for a fire because fires would have been contained within the london fire brigades response plans and everybody else's
00:28:09 there wasn't a particular fire risk in there
00:28:12 there and there certainly wasn't a tower block fire of the intensity of grenfell within there but i don't believe there was that risk in the london risk register either
00:28:23 risk in the london risk register either do you know why not given the history of tower block fires in london up to october 2015 including the adair tower fire in that month i don't know the answer to that
00:28:35 answer to that was it ever considered i don't know right how often was this risk register reviewed and updated
00:28:43 it was reviewed on a rolling basis we had four borough resilience forum meetings each calendar year and we took a proportion of the risks to
00:28:55 and we took a proportion of the risks to successive meetings so that across a year
00:28:58 year the document in total would have been reviewed so we reviewed four or five risks at one particular time and in relation to building collapse as you can see item nine
00:29:10 you can see item nine did the risk under consideration here include mass fatality mass injury mass evacuation and mass homelessness
00:29:25 mass evacuation and mass homelessness you'll have to forgive me sir i can't remember the detail of what we have listed in that in on that page when this was put together did you consult other category one responders
00:29:36 consult other category one responders such as the lfb or the metropolitan not us as a borough in that level of detail because that would have been dealt with by the london risk register and the people putting that together
00:29:48 putting that together what we did at the viral resilience forum is we had representatives of the emergency services and the nhs at that meeting from a local area so they would have been aware of and would be
00:29:59 would have been aware of and would be able to comment on if they needed to the content of this document
00:30:13 while we're looking at this page can you tell us
00:30:16 tell us what was envisaged in the expression aviation incident aviation yeah accident i'm sorry i believe
00:30:26 i believe and forgive me without looking at the page myself um i believe that would have been about the possibility of an aircraft crash uh or parts of an aircraft falling within the borough yeah
00:30:38 aircraft falling within the borough yeah all right thank you
00:30:44 and do you recall as a fact whether there were ever any discussions between rbkc on the one hand and the lfb on the other about any of these risks or any risks
00:30:55 about any of these risks or any risks which were not on this this table i'm sorry not specifically i mean we chatted both at brazilians four meetings and as we met at exercises or training
00:31:06 and as we met at exercises or training events or or other meetings um generically about matters i'm sorry your specific question about specific discussions about the risk in here i i can't recollect
00:31:19 here i i can't recollect what that might have been right
00:31:22 um let's then turn to emergency plans i think it's right that you as you say in your statement and we don't need to go to it but it was page 3 paragraph 11 of your first statement that you were responsible for
00:31:33 statement that you were responsible for drafting the council's contingency management plan or cmp yes yes uh and at the time of the fire am i right that that was issue 9 yes yes let's go to that rbk40 rbk404396
00:31:50 is that the document yes dated date of issue 30th of april 2015. yes how often was it updated it was mostly from when it was first this particular
00:32:02 from when it was first this particular type of plan was put in 2007 in most years it was updated um in one year it wasn't updated because a review of it said there was no need for an update at that particular point right in fact to
00:32:15 that particular point right in fact to be to be fair to you there is a list of publication history uh on page two and we can see in the middle of page two your name as the as the author in collaboration with denise prieto at
00:32:27 in collaboration with denise prieto at lb hf
00:32:30 lb hf and the publication history starts in 2007 and runs through 2008 9 and then skips 10 and we have 11 12 13 14 15.
00:32:42 and we have 11 12 13 14 15. um is is 2010 the year you were referring to when there was no publication uh yes i can see from the list here that um
00:32:51 um no revision was required following a review in 2009 right the list rather suggests that we then didn't revisit it until 2011. correct and and this was the addition
00:33:04 correct and and this was the addition or issue
00:33:05 or issue current was it as at june 2017 yes can you explain why there was no revision in 2016
00:33:12 2016 i don't think i can would that would have been unusual
00:33:18 most of the reviews were checking numbers details and required very little structural difference in 2015 for this particular issue we did a
00:33:31 2015 for this particular issue we did a lot of work with our colleagues at hammersmith and fulham we were anticipating the potential coming together as a combined unit and we agreed to authorities to harmonize the contingent the overarching
00:33:42 harmonize the contingent the overarching contingency management plan so therefore denise prieto and i spent a lot of time together for the issue 9 in going through the whole lot i think that was a very very substantial review
00:33:53 that was a very very substantial review of that time or check through and i suspect i can't answer you for certain i suspect that frankly the following year it just wasn't deemed necessary at that point to review that
00:34:04 necessary at that point to review that overarching document even though in fact there had been some substantial exercises at the end of 2015 uh the lessons from which might have been
00:34:12 been wisely reflected in a 2016 update i'm sorry i can't answer that right we'll come to those exercises later um i think it's right though in general
00:34:23 i think it's right though in general that like earlier issues this issue was a generic emergency plan supported by a number of annexes i think 38 in total yes yes
00:34:31 yes yes and that would include a contact directory and plans for specific situations yes yes um
00:34:40 um do you accept that this as a structure was a cumbersome suite of documents which is difficult to navigate set out over a number of annexes some of which were outdated no you don't accept that i
00:34:51 were outdated no you don't accept that i think that it was a rational way of breaking down elements of information that could be kept up to date individually and could be provided as guidance to people
00:35:03 be provided as guidance to people putting in a response it's covered in the statutory guidance to the civil contingencies act where it talks in one chapter about the formation of contingency plans and
00:35:16 contingency plans and it reflects there that one way of doing a plan might be to have a series of annexes
00:35:22 annexes so the
00:35:23 so the advantage of that is that the overarching plan that describes as required by the statutory guidance the summary of who does what in outline what
00:35:35 summary of who does what in outline what you know how what we're covering how we're going to call out how we're recognizing emergency in that overarching and public facing plan that was
00:35:44 was easier to
00:35:45 easier to put out and maintain the
00:35:49 the individual annexes very many of which contained confidential information or rapidly changing information particularly in terms of names and contacts and what have you were more easily dealt with in their discrete
00:36:00 easily dealt with in their discrete annexes
00:36:02 annexes and those which requires um to be kept confidential because of the content could do so without having the entire document confidential do you accept uh and we can go through
00:36:13 do you accept uh and we can go through the detail if you like that there were a number of
00:36:16 number of annexes which were either left blank or left in draft form or were outdated or had become superseded yes yes
00:36:27 uh now as i've shown you this is issue 9 april 2015 drafted together with denise prito of lbh and f what was the practical
00:36:39 of lbh and f what was the practical effect of the plan being a joint plan with lbhf london borough of hammersmith and fulham the plan
00:36:46 the plan reflected that we had a lot of bibora services at that point the the part of the tri borough and the baibara arrangements of the three authorities westminster city council london of harrisburg and fulham
00:36:58 council london of harrisburg and fulham and ourselves um westminster city council were very much having their own plans and a lot of their own services it was thought at the time
00:37:09 at the time managers above were were exploring and putting the two teams together as a combined team a bibura team between rpkc and lbhf
00:37:19 and lbhf so an in anticipation of that it just became a good idea at the time we thought to harmonize the overarching plan
00:37:28 plan so that in a response whether the managers were from rbkc or lb hf or were by borough managers there would be some standardization to the overall approach
00:37:40 standardization to the overall approach nonetheless was it the case that responsibility remained with rbkc yes for an emergency response within the borough yes yes uh now um it might help then having
00:37:51 uh now um it might help then having mentioned
00:37:52 mentioned to us the
00:37:54 to us the tri-borough concept um was that an agreement between rbkc london borough of hammersmith and fulham and westminster city council yes that was a political arrangement right uh and just just under this
00:38:07 right uh and just just under this political arrangement um
00:38:10 um it was contained in an agreement a document was it yes the three authorities yes um uh had a uh an agreement there was a number of tribal services
00:38:23 there was a number of tribal services but not all some boroughs had some single borough services there were some bibara services with hammersmith and fulham at one point we had a joint chief executive between hammersmith and fulham
00:38:35 executive between hammersmith and fulham and kensington and chelsea council with westminster city council retaining his own chief executive these arrangements varied from year to year as the authorities
00:38:46 year as the authorities learn to live with them adapt them right move on right drawing a number of strands from the arrangements is it right that your own department
00:38:57 department contingency planning was sovereign in other words exclusively concerned with matters within rbkc's boundaries yes yes but there were certain is this right there were certain departments such as
00:39:08 there were certain departments such as adult social care that were shared across three boroughs the three boroughs yes
00:39:14 yes and we'll see i think later in relation to the rbkc response that there were staff who would respond on behalf of our bkc but were actually employees of other boroughs but in the tribara arrangement
00:39:25 boroughs but in the tribara arrangement for example sue redmond who was from london borough of hammersmith and fulham
00:39:31 yes now on a buy borough or a tribe or a service some staff will put together in mixed service teams some might still be delivering
00:39:42 some might still be delivering single-borough services everybody at the merger retained were retained as employees of the of the authority they were at the time of the merger
00:39:53 were at the time of the merger but they might well be working for other boroughs as part of that buy borrower or tri-bar service so i see so the deployment was on a service by service basis rather than a borrowed by borough basis
00:40:05 borrowed by borough basis yes there were individual service specifications for individual borough even though there might be a buy borough or a triborough service dealing with it overall
00:40:17 right so under the contingency arrangements the particular functions both in relation to risk assessment emergency planning and
00:40:29 emergency planning and execution
00:40:31 execution were dependent on individuals who might or might not be employees
00:40:37 employees of the particular borough where the emergency took place yes i see
00:40:45 now returning back to the contingency management plan if we can turn to page 17 please we can see the section 2.3 the role of a local authority
00:40:56 the role of a local authority in an emergency and it says the role of a local authority during a major emergency may be summarized as and then there's a list of bullet points down the page
00:41:07 of bullet points down the page and the first bullet point is supporting the emergency services and other organizations involved in the immediate response and just looking at those sub-bullet points
00:41:20 sub-bullet points the fourth square bullet point down includes provision of premises for body holding centers survivor reception centers
00:41:29 centers friends and relatives reception centers brief and rest facilities for emergency services personnel so was it right that the local authorities
00:41:40 authorities one of the local authorities roles and responsibilities in the immediate response was the establishment of survivor reception centers
00:41:50 centers and
00:41:51 and friends and relatives reception centers no the responsibility for establishing those was the responsibility of the metropolitan police service the role of the authority would have
00:42:02 the role of the authority would have been that if the met police said have you got anywhere where we could hose one of these centers if we
00:42:08 if we were able to provide either our own premises or from our center premises knowledge of a somewhere work could be used we would do that but the responsibility for
00:42:20 responsibility for all of those centers in that particular paragraph were the lead responsibility was the metropolitan police service i just wonder why you say that because look looking at the text the role of the local authority
00:42:32 the role of the local authority was to support the emergency services in the immediate response including a number of things such as the clearance of debris and restoration of roadways but that wouldn't be the pro that wouldn't fall to the police would it
00:42:43 wouldn't fall to the police would it that would fall to the council indeed yes structural advice making safe for demolition of dangerous structures that wouldn't fall to the police that would fall to the council yes yes yes
00:42:54 yes yes uh and
00:42:55 uh and assistance in the evacuation of the civil civilian population similarly wouldn't necessarily fall or wouldn't solely fall to the police would it
00:43:04 an order for evacuation might fall to the police people might evacuate themselves yes
00:43:11 yes certainly but assistance in that evacuation however however started and for the provision of premises it's the provision of premises for those functions not the functions themselves
00:43:22 functions not the functions themselves the provision would you accept that the provision of premises for survival reception centers and friends of the relatives reception centers fell to the council in the same way as the other bullet points above it um
00:43:33 bullet points above it um where we could in support of the emergency services we would provide premises that we were aware of if we were asked
00:43:43 yes but just to be clear though about your evidence i just want to be clear that you accept that the role of the local authority
00:43:51 authority is is to support the emergency services by way of provision of premises for reception centers and friends and relatives reception centers yes if we were asked to do so
00:44:02 were asked to do so asked by whom by the metropolitan police service
00:44:05 service so is this right that this plan contemplated that the council wouldn't provide premises for reception centers and friends and relatives reception centers unless the
00:44:16 relatives reception centers unless the police unless and until the metropolitan police asked for it that's correct the metropolitan police service had the role of
00:44:26 of opening should they wish to do so those centers and if they did and if we were able to assist the police with premises for that then clearly at that point we would but we were not the authority that
00:44:38 would but we were not the authority that would decide to open a survivor reception center the metropolitan police were so at that point the police did and they came to us and said have you got somewhere where we could use we would
00:44:50 somewhere where we could use we would assist them with that
00:44:55 and then the next bullet point down
00:45:00 about two thirds of the way down your screen providing support services for the community and others affected by the incident
00:45:06 incident this could include first bullet provision of emergency rest centers with food and beverages beds and welfare services
00:45:14 services provision of a humanitarian assistance center which we'll come to learn later in the module is referred to as a hack or h.a.c
00:45:22 or h.a.c emergency sanitation and hygiene rehousing of those made homeless both in the short and long term and then at the last bullet point their sub bullet point establishing community assistance centers for the dissemination
00:45:34 assistance centers for the dissemination of information and support to those affected by the emergency you accept i think that that all fell to the council
00:45:44 yes now if we turn to page 11 of this document
00:45:48 document back to 11 there's a reference at 1.10 on that page there towards the foot of the screen under the heading related procedures and other documents to the national guidance emergency
00:46:00 to the national guidance emergency preparedness that's the statutory guidance
00:46:04 guidance on part one of the cca and the associated regulations now just pausing there to what extent did the national guidance documents such as
00:46:15 such as emergency preparedness as identified there influence the plans you drafted they did influence the plans i did my best to reflect the relevant elements of the guidance for our plans in terms of
00:46:27 the guidance for our plans in terms of what the plans would format as i say the overarching the the the relevant appendices to annexes to that um so so yes it's important
00:46:39 it's important just just taking a a step to the side for the moment in the questions you you drafted this and you said i did my best to reflect the relevant elements of the guidance was this document
00:46:50 of the guidance was this document peer reviewed by anybody within rbkc
00:46:54 we had the documents were aware of it i don't think anybody sat down and did a peer review on it right was any exercise ever done to compare your work on this document over the
00:47:05 your work on this document over the years and in particular with contingency management plans in other boroughs in london or other parts of the country
00:47:16 no formal process in that respect but certainly we would
00:47:21 would look at other people's plans if we were drafting a new draft we might ask others could we have a look and see what you've done the flu plan particularly we did that in 2009
00:47:34 particularly we did that in 2009 so
00:47:35 so when we went to tabletop exercises looking at elements of response that the london resilience group would run at that point of course we would get an awareness of what other authorities were doing or might be doing within that but
00:47:47 doing or might be doing within that but that was all that part of that cooperation and looking at staff there was no regulatory look at what we had done against the act or anything else was there any system or
00:47:58 or anything else was there any system or structure in place and it sounds from your answer as if there wasn't but i just want to be clear about this any system or structure in place whereby you were required to present these plans in draft to
00:48:09 in draft to an authority such as or body such as the lrg the secretariat or um the
00:48:17 or um the sub-regional resilience forum or the chief executives or anybody higher up the structure in place for london resilience so that they could say yes this passes muster
00:48:28 this passes muster or no
00:48:29 or no it's defective or inadequate in the following respects not the documents as a whole
00:48:36 a whole various parts of an authority's ability to respond were tested through the minimum standards for london which the local authorities panel administered and the london resilience group did the secretariat work for
00:48:48 secretariat work for whereby each year we were required to submit a return on our immediate response arrangements and selectively across the years on
00:49:00 and selectively across the years on various elements of of emergencies this wasn't the provision of the document it was answering a series of questions did we have this did we have that how many people did we have for this such and
00:49:11 people did we have for this such and such and we answered those questions so that examination was given by the local authorities panel yes basically and we'll come to the minimum standards for london or msl later um now um
00:49:22 london or msl later um now um if we go to page 12 we can see that there's a section dealing with resilience the london resilience partnership there on your screen and it says that it has various plans and protocols showing how
00:49:33 various plans and protocols showing how london would deal with the impact of different incidents and then if you look down there's a list long list of bullet points i think some 15 in all which are not
00:49:44 i think some 15 in all which are not actually points at all they are framework and other documents so you've got the strategic emergency plan
00:49:51 plan command and control protocol major incident manual etc etc some of which i think are familiar to to to those who followed phase one of this inquiry and if you look a little bit further
00:50:03 and if you look a little bit further down the list you have the london humanitarian assistance panel london mass casualty framework london mass fatality plan etc um
00:50:13 etc um how did those plans in that list interact with the rbkc plans which were set out in the 33 annexes that we touched on earlier so we fitted in
00:50:25 so we fitted in at the overarching point through the cmp with the principles of the major incident panel of the london emergency service education panel so that reflected our local authority
00:50:36 so that reflected our local authority liaison officer and that sort of arrangement we also ensure that the the major overarching plan uh would fit in with the london strategic emergency plan so that we had awareness and could
00:50:48 so that we had awareness and could involve with the strategic gold group strategic silver groups when they came through
00:50:53 through in terms of the other guidance documents or frameworks we had cognizance of those when we were drawing up any borough counterpart of that so for example the
00:51:05 so for example the london mass fatality plan we had a borough annex that fitted our borough part to what the mass fatality arrangements were in our instance the
00:51:16 arrangements were in our instance the mass fatality plan was written by westminster city council and that was for all of the boroughs involved in our coronal area but i had an annex which pointed toward boris staff to that
00:51:29 pointed toward boris staff to that westminster plan and was outlined what our responsibilities were for that and that we did with others the london resilience heatwave plan we had an annex for heatwave and we
00:51:41 we had an annex for heatwave and we reflected within that plan that the local authority specific elements uh particularly for our education and social care services that if we had a heat wave alert from
00:51:53 that if we had a heat wave alert from public health england there was the short cut for the authority to go to to understand particularly what it might need to do at that point right let's see
00:52:03 let's see if we go to page 15
00:52:07 under the heading of a definition of an emergency
00:52:14 which um
00:52:18 you can see there um in blue
00:52:22 in blue um
00:52:23 um the the third bullet point down is major fire you see that yes uh and the very top of the page which you can't see but if we can scroll
00:52:34 which you can't see but if we can scroll up to the top of the page um you can see in the second line a fire in a block of flats for example entailing the evacuation of residents or tenants will probably also
00:52:45 residents or tenants will probably also involve housing adult social care and children's services for emergency rest center support building control for dangerous structures advice environment leisure and resident services for clearance of debris transport and
00:52:56 clearance of debris transport and technical services for highways management and environmental health support and corporate services for a communications and public information strategy
00:53:09 what was it that led you to pick a fire in a block of flats as your example of a a major emergency which would draw in all these services
00:53:21 i can't remember it was so long ago because this would have probably certainly been reflected in earlier versions of that plan why that particular one i don't know it certainly was a incident
00:53:34 certainly was a incident which would require a wide spread of council services and my aim of that paragraph was to describe to the reader why it is we had an emergency plan why it is we might need some emergency
00:53:46 it is we might need some emergency procedures to respond to certain incidents
00:53:50 incidents and for a particular council of course not being a 24-hour response service like the emergency services are it conveyed or i believe it conveyed you know there's all sorts of services across all sorts of departments which we
00:54:02 across all sorts of departments which we need to bring together in the most unusual circumstances certainly a fire in a block of flats we had had fires and blocks of flats both when i was at kensington before grenfell and when i was at hounslow
00:54:14 and when i was at hounslow so that was something i was aware of and it
00:54:19 it as an example it gave probably a good example of the widespread number of council services
00:54:30 um now on the question of communications particularly can we go to rbk 30s 59598
00:54:39 what i'm showing you here
00:54:42 here is the witness statement of martin fitzpatrick now he i think confirmed this for me please he was head of the media and communications team in rbkc until 2017. yes can we go to page eight
00:54:53 until 2017. yes can we go to page eight at page two please paragraph eight he says
00:55:00 there this my recollection is that the council had a long standing and periodically updated emergency plan and that this plan included a communications plan this emergency communications plan was of
00:55:12 emergency communications plan was of long-standing and had been periodically revised my memory is that the plan was an appendix to the council's contingency management plan and that it was stored along with previous iterations on a shared team area on the council's
00:55:24 shared team area on the council's computer system in the team's shared folder
00:55:28 folder in fact is it right do you remember that there was no communications plan contained as an annex to the cmp i don't believe there was at that time why is that
00:55:40 i had had in preceding years a couple of conversations with martin fitzpatrick asking him about emergency communications my recollection is that his view was
00:55:52 my recollection is that his view was that his team understood the requirements set out in the london emergency services the ace and panel's major incident plan and what his team would be required to do
00:56:03 his team would be required to do and that he didn't need a formal plan i'm also aware because i've seen more recently in reviewing these matters that certainly at some point i think it was keith robbins had drafted a generic
00:56:16 keith robbins had drafted a generic outline plan and i think the intention was to try and get the departments to use that
00:56:21 use that [Music]
00:56:23 [Music] but certainly i'm not aware that martin had a written develop plan at that point i had in my recollection discussed that with him at some point
00:56:34 with him at some point and and got a complete no right
00:56:39 what do you mean you say when you say you've got a complete no do you mean that he refused to do one or he told you there wasn't one my recollection is that he told me that he didn't need one wasn't going to do
00:56:50 he didn't need one wasn't going to do one that's my recollection right
00:57:01 he his evidence and i can summarize this well actually i can show you paragraph 14 of his of his witness statement it's probably better to do that
00:57:09 that using his words rather than mine he refers to a draft a paragraph 14. if we scroll down to the foot of page two
00:57:18 two sorry yes thank you um he refers to annex six and
00:57:25 and says i'm informed that a final version of this document did not form part of the annexes to the borough's contingency management plan i do not understand why this did not happen what i can say is that while the draft 2010 communications
00:57:36 that while the draft 2010 communications plan may not have been formally annexed to the contingency plan management plan it was still adopted and adhered to by the mct then he gives an example is that correct
00:57:47 is that correct i'm certainly aware of that draft document i'm certainly aware that my colleague keith i think it was keith was was had been working on that i don't i i don't believe it was a
00:58:00 i don't i i don't believe it was a adopted document on the actual list at that point so i do believe it was still in draft
00:58:07 in draft i don't know that i can usefully say any more on that right [Applause] d do you accept arby casey's admission
00:58:18 d do you accept arby casey's admission that it's it is made in its opening remarks to this module of this phase of this inquiry that it failed to set out how different parts of the council would coordinate their communications
00:58:30 communications i am not aware of any documents that set that out very well now i wonder if you could while on this point help us clear up a confusion
00:58:41 up a confusion um can i show you rbk3028631
00:58:51 uh no th this is what looks like the first page of the generic emergency plan 30th of april 2015.
00:58:59 2015. but if we go to page five you can see the passage headed cmp yep part two tactics and contacts and it says
00:59:11 and it says this generic emergency plan is supported by a part two document giving information to assist in specific circumstances such as contact lists procedures for flooding severe weather
00:59:22 procedures for flooding severe weather environmental issues mutual aid and so on contact details include confidential telephone numbers this document is issued separately to those offices with a designated response role
00:59:34 a designated response role now um
00:59:36 now um this was the version of the cmp exhibited by nicholas holgate the then chief executive and town clerk the version that you exhibited to your
00:59:48 the version that you exhibited to your statement
00:59:49 statement let's keep this up on the screen but can we go please to rbk404396
00:59:57 page five
01:00:00 so keep both up on the same time you can see that on the left is the version i've just shown you from mr holgate's exhibits but on the right is the version of the cmp
01:00:12 on the right is the version of the cmp that you've exhibited and you can see that although the sections are the same the version that you've exhibited there is no cmp part two tactics and content
01:00:24 is no cmp part two tactics and content contacts
01:00:25 contacts section
01:00:27 section and
01:00:28 and why is that i can describe the cmp part two i cannot tell you why there is a difference i can make an assumption on
01:00:41 difference i can make an assumption on that
01:00:42 that well um
01:00:44 well um can you explain as a fact whether they were in fact as appears to be the case different versions of this plan floating about in on after april 2015.
01:00:59 if this is the document that mr holger produced i have to accept that he obviously had a different version i would say that the version without that ought to be the the published version
01:01:10 ought to be the the published version cmp part 2 tax contacts was a at that point
01:01:15 point was a draft being worked on and it wasn't finished and indeed it was later subsumed into other parts of the plan following the fire seeing part two contact contacts
01:01:27 fire seeing part two contact contacts was a part of our exercise of harmonizing our plan with london borough of hemisphere fulham who had that sort of document and having seen it we thought this might
01:01:39 and having seen it we thought this might be a good idea to produce our own version it might be of value to people activating the plan from a silver point of view
01:01:48 of view and the purpose of the document was to list um and the draft that we got to so far
01:01:55 far listed
01:01:56 listed what the impact of that might be which council departments might have a role and where particularly there were regional plans that might assist that was only in draft at that point
01:02:07 that was only in draft at that point subsequently we actually subsumed that information into the role of the resilience advisor that we developed after grenfell and into other parts of the training for council silver and it quite simply no longer had a need so
01:02:19 quite simply no longer had a need so although it was draft it disappeared out because it wasn't necessary now what i can't tell you is why nicholas holgate had
01:02:31 a version that put that in i surmise it might have been that we gave him an earlier draft before it was completed and we put it out i can't say that for certain because of course
01:02:43 that for certain because of course the
01:02:44 the bottom of the page has got the same information of the date of publication so i'm really sorry i cannot tell you why mr holgate had that version but i can tell you that the cmp part 2 was a
01:02:56 can tell you that the cmp part 2 was a concept in draft at that point which we later dropped because it wasn't going to provide the benefit that we originally thought it would was there a need in 2017 for a tactics guide
01:03:07 2017 for a tactics guide i think there probably was because at that point our whole concept in local authorities of council silver was still frankly a little bit loose it was developing
01:03:18 developing and
01:03:19 and the purpose of this cmp would have been to have given a resource to an officer in a council sort of a role and to use that as part of training we subsequently by putting in later the
01:03:31 we subsequently by putting in later the role of resilience advisor and a formal council silver and drawing up those roles properly and providing each of those roles with their own their own guidance documents
01:03:42 guidance documents it wasn't needed later on i think at that point it was a good idea which is why we were drafting it but it was still in draft at the point of the fire
01:03:52 fire um let's go to rbk405194
01:04:04 this is part two tactics issued 21st of june 2016. are you familiar with this document yes who drafted it the first draft was drafted by rebecca
01:04:17 the first draft was drafted by rebecca blackburn
01:04:18 blackburn taking the documents from hammersmith and fulham and rbk seeing it it was a draft that got a bit clumsy not from rebecca i hasten to add but because
01:04:30 from rebecca i hasten to add but because it was reflecting in too much detail by borough and triborough and single borough services and consequently i didn't think it was delivering what would be of value to to the
01:04:42 what would be of value to to the intended author um i then took over the draft and started this draft too and
01:04:50 and it looks rather different internally than that first drafted okay so you often now if we go to the index on page three
01:05:02 uh you can see the um there's the contents guide and if you go to page 34
01:05:12 this is the action guides for specific emergencies and responses and the first paragraph say the overarching arrangements for responding to and managing the council's response
01:05:23 to and managing the council's response to a major incident or emergency are outlined in the contingency management plan part one generic emergency plan this section provides a series of action guides for a number of scenarios that might occur in the
01:05:34 might occur in the borough and for which additional plans and arrangements are available to enhance the council's response you see that
01:05:41 that yes
01:05:42 yes uh now um if we go to page 37 please
01:05:53 they're all blank generic major emergency response they're all blank why are they blank we had the generic emergency response
01:06:04 we had the generic emergency response plan setting all of that out at this drafting stage i was trying to apply my mind to some of those other scenarios i would have gone back at the end and then filled in this part because if we got to
01:06:16 filled in this part because if we got to the point we were going to use the documents
01:06:18 documents then the cmp part 1 would have had more of it move into this one and out and therefore there would have been a need to quantify that at this point there wasn't a need to because we had the
01:06:30 wasn't a need to because we had the generic response and that's what the authority was used to so this is a draft and i was putting my time where i could to trying to develop other parts for specific incidents i mean was this it
01:06:41 specific incidents i mean was this it was this document put it this way as at an after june 2016 did you expect that this document would be used in the event of a major emergency had it been completed i would
01:06:52 emergency had it been completed i would have expected the emergency planning officer and the council silver to have had access to that document so that if we were dealing with an incident incident kicks off we start the
01:07:03 incident incident kicks off we start the generic response and at some point let's have a quick look at the crib sheet for this particular one all right there's a london regional resilience plan here for this i better make sure that is there anything in there that i might benefit
01:07:14 anything in there that i might benefit from so that was the the concept behind it it wasn't going to be the response plan per se it was going to be resource afterwards started the response just to
01:07:25 afterwards started the response just to give a little bit of direction to particular bits of information that might then be of help no my my question's slightly different i think i'm sorry as of the night of grenfell
01:07:36 as of the night of grenfell was this a document that you would have expected to have been reached for by your team no it was a draft it was in the fire it wasn't published so it was a work in progress and not to be used oh yes
01:07:46 yes yeah so i'm sorry i thought i misunderstood you right no but that's clear at least um if you go to page 39 however
01:07:54 however um you can see there that um there are a number of directions about mass shelter and resources in particular particularly
01:08:06 in particular particularly um
01:08:08 um what the frameworks are um and in the second bullet point under the first section the fact that rbkc may be asked to provide basic shelter and then in the next part resources
01:08:19 and then in the next part resources rbkc has a number of identified shelters and emergency rest centers available to be called upon to provide shelter and some guidance about how they're to be used and resourced and staffed
01:08:34 would you accept that this document though a draft would have been helpful for rbkc staff on the night all of that information was
01:08:46 all of that information was already in either the overarching cmp or in the relevant annexes for um evacuation and rest centers what have you so in this particular page here
01:08:58 you so in this particular page here it just
01:08:59 it just highlights if you like what is in detail in those other plans so
01:09:04 so the emergency planning team council silva certainly and others would have been aware of those substantive documents and could simply go straight to them so although this might have given somebody sitting there with a
01:09:15 given somebody sitting there with a spare five minutes let me have a look and make sure what i'm doing that obviously in any instance is a nice idea i don't think the lack of it in any way hampered the access to the information
01:09:26 hampered the access to the information that was in the very substantive plan so what was the point of this document if it was simply reflecting something that was already in the existing contingency management plan and the london plans simply because it would give a quicker hit for somebody to review their actions
01:09:38 hit for somebody to review their actions and to make sure they were covering anything and particularly for the supporting plans procedures which the emergency planning staff knew in detail but others might not know in detail it provided that link
01:09:49 not know in detail it provided that link there to show that there are these regional plans the reason we didn't proceed with the document after is that by developing the resilience advisor role an on-call emergency planner who would be there
01:10:02 emergency planner who would be there 24 7
01:10:04 24 7 immediately to support council silva would have all of that information and we'll be able to give that orally or to point to the document so this document by that time didn't have the relevance because we dealt with it in a rather
01:10:15 because we dealt with it in a rather different way now paragraph 11 of your statement first statement page three i think we've seen it already but let's have it up anyway just so that you can see what i'm asking you about
01:10:26 about um you described there how the contingency management plan sets out the triggers
01:10:31 triggers for what the council would do in an emergency
01:10:35 emergency i think i'm that that's a summary but yeah you agree if we go please then to the cmp the contingency management plan itself at rbk40439
01:10:46 and within that let's see page 38 section 5.1
01:10:53 this is entitled command control and coordination subtitle emergency management overview
01:11:02 we can see a chart and
01:11:05 and there is the chart which outlines the command control and coordination of council services during an emergency and is it right that looking at it just helping us through it you have cancelled
01:11:16 helping us through it you have cancelled gold
01:11:17 gold in the middle and is that the individual in charge of the organization and responsible for formulating strategy yes and that would be um nicholas holgate at the time with it the town clerk and
01:11:28 the time with it the town clerk and chief executive yes yes um and then um you can see to the left-hand side or immediately under underneath council gold you have borough emergency
01:11:40 council gold you have borough emergency control center or beck silver and incident response officers and to the left of that local authority liaison officer lelo at the scene and is it right the layla would
01:11:52 and is it right the layla would represent council silva at the scene yes and
01:11:56 and i've just shown you beck in the middle that's is that right the commander control of the council's response um
01:12:04 um conducted by the beck team no and i think that's one of the misnomers about borah emergency control center it does imply that there's an ex you know a control
01:12:16 you know a control i think we understand control normally means the people who are in control i've never liked that title it's a generic title across london i would much have preferred a borah emergency coordination center because
01:12:29 emergency coordination center because his role was to receive information and pass that out and to coordinate those responses
01:12:35 responses the control of the response was very much by the departments and those chief officers concerned delivering their responses
01:12:47 responses the strategy set by gold in this instance nicholas holgate with the gold team which would have been other senior managers supporting him that would have been disseminated out to
01:12:58 that would have been disseminated out to the coordination center very much receiving information from the scene from rest centers from other places passing things out to departments to say this is needed can you do this can you do the other can you let me know what you are doing
01:13:11 not that hard edge control that said we are absolutely deciding the response and we are deciding what you will do in your departments right well let's examine
01:13:22 departments right well let's examine that further if we can then in light of that answer can we go please to the next page page 39.
01:13:35 and this is roles and responsibilities summary
01:13:39 summary and it says this during an emergency council staff and resources will be used outside of their day-to-day role in order to support the response and there you see council gold strategic and the four bullet points identifying
01:13:53 and the four bullet points identifying their responsibilities and functions then you've got the scg and then you've got underneath that council silver borough emergency controller tactical and then underneath that borough
01:14:04 and then underneath that borough emergency control center back and it says the place from which the council's response to a major major emergency or business continuity disruption is coordinated and managed coordinate the
01:14:16 coordinated and managed coordinate the council's response liaising with council gold council bronze services and external agencies
01:14:24 so um
01:14:27 um is that correct yes
01:14:29 yes but
01:14:30 but but above that which i didn't read to you
01:14:33 you the council silva stroke borough emergency controller is as it says to assess the incident and activate the council's response develop the response tactical plan for
01:14:44 the response tactical plan for responding to the emergency become borough emergency controller if beck is opened supported by incident response officers and liaison council gold scg it looks from that as if
01:14:57 looks from that as if is this right the bec when opened would house
01:15:01 house the borough emergency controller at that time yes and the borough emergency controller sitting within beck would assess the incident develop the response
01:15:11 response uh
01:15:11 uh and become the the controller yes yes so within the back it's not simply a coordination exercise it does involve doesn't it an element of control
01:15:22 doesn't it an element of control as identified there by those four bullet points in whole partnership with the responding services and the managers of those
01:15:30 those well you say that uh it's it doesn't suggest that in those bullet points does it it says assess incident and activate the council's response so the decision
01:15:41 so the decision the process of asses assessment and the decision to activate would sit with silver wouldn't it sorry yes our bigger pardon in that for the act yes in identifying we've got a problem that needs this plan to be done then yes
01:15:53 needs this plan to be done then yes that's the person who would make that decision yes and similarly developing the response tactical plan for responding to the emergency would be a silver's job not not gold's job yes yes
01:16:07 now there's a reference here as you can see to incident response officers um
01:16:13 um i think they're covered aren't they in nx3
01:16:16 nx3 to the bec manual is that right yes
01:16:19 yes and we can find a full description of what they do in that document but i think it's right isn't it that um an incident response officer includes
01:16:28 includes a bec supervisor a back officer and a back information officer yes it's the staff of the bay it's the staff of the begg
01:16:35 begg and i think you you say or it says um that they can be cross-trained for emergency rest center roles and on-scene lele roles too yes
01:16:45 yes we had a number of people who volunteered for these roles who who could volunteer for various jobs and you'll see them at annex one the call out list that the names sometimes appear in under
01:16:56 names sometimes appear in under different roles i think that looking back is a great shame that because we had a shortage of volunteers there were too many people that could do other matters and therefore we didn't
01:17:08 other matters and therefore we didn't have sufficient staff discreetly in particular roles going forward the authority sought to then address that by getting people in particular roles and not cross-training
01:17:19 particular roles and not cross-training them
01:17:20 them but yes some of those people could either be in the back or could be at a rest center i think that was an inherent an inherent weakness at that time yes thank you
01:17:29 thank you mr chairman is now a convenient moment yes i think it is well as you were told mr kerry we have a break during the morning and i think this is the time to take it so we'll stop at this point we'll come back please at 25 to 12
01:17:43 we'll come back please at 25 to 12 and i have to ask you while you're out of the room please don't discuss your evidence with anyone else thank you thank you very much would you go with the usher
01:17:56 please thank you very much 25 to 12.
01:41:17 would you ask mr kerry to come back in please
01:41:30 all right mr kerry ready to carry on okay thank you very much yes yes thank you mr chairman i'd like now to turn to the topic of emergency staff capacity now as of june 2017 mr kerry did you
01:41:41 now as of june 2017 mr kerry did you consider that the council rbkc had sufficiently trained personnel who could undertake the roles within the back no
01:41:50 so you considered that it didn't no
01:41:55 no so that yes you did consider that it didn't sorry i think we did not have in my opinion sufficient trained staff for that role i think it's right as you say in your
01:42:06 i think it's right as you say in your statement that in the past or in in the previous past you had raised concerns about a significant shortfall of trained emergency management staff to the rbkc management board yes yes
01:42:18 board yes yes and and i think you set that out in a document at rbk3 rbk3058038
01:42:27 if we can go to that
01:42:30 this is a report titled emergency staff recruitment and retention dated the eighth of october 2014
01:42:38 2014 by the contingency planning manager who was you yes and if we go to page one um in the box the council has insufficient trained volunteers for major incident emergency
01:42:49 volunteers for major incident emergency management roles in the borough emergency control center support from executive directors is sought full decision so that was the point was it yes yeah and then if you go to
01:43:00 it yes yeah and then if you go to paragraph 1.2 second paragraph under purpose of report it says this there is now a significant shortfall in the numbers of trained volunteer emergency management staff required traditional recruitment methods no longer generate new volunteers
01:43:12 no longer generate new volunteers demands from the day job occur tailing attendance at required training sessions and emergency exercises support is now sought from executive directors and then if you go on to page two paragraph 3.1
01:43:26 under the requirements 3.1 borosilva it says a minimum of 10 are required this figure enables sufficient trained staff to be available at any one time allowing for annual leave meetings away
01:43:39 allowing for annual leave meetings away from the borough sick leave etc and then underneath that at 3.2 incident response officer a minimum of 20 are required this figure enables sufficient
01:43:50 required this figure enables sufficient trained staff to be available to cover two to three shifts over the first couple of days of an extended incident another 3.5 on page three if we turn the page please rbkc and h
01:44:02 if we turn the page please rbkc and h and f
01:44:04 and f uh it says have recently harmonized the roles and training of emergency management officers and harmonized core elements of our contingency management plans however there will always be a need for both authorities individually
01:44:16 need for both authorities individually to manage the response to emergencies that occur solely within their borough the borough emergency control center with an adequate number of role trained staff is a key part of our emergency management arrangements
01:44:28 management arrangements um and presumably that was how you saw it at the time yes and 4.1
01:44:36 4.1 under the current situation
01:44:40 uh it says this the past couple of years have seen a decline in numbers in each category and current trained staff numbers are borough silver times three soon to reduce to two incident response officer times ten
01:44:52 officer times ten i mean you've got little footnotes do you see three and four next to those figures and if you scroll down to the foot of page three you can see footnote three h and f currently eight times eight
01:45:02 eight h and f currently times twenty you see that yes uh
01:45:09 uh so there's the comparator uh
01:45:14 uh so just summarizing the position is this is this correct boris silva was three soon to reduce to two compared with london borough of hammersmith and fulham who who had eight
01:45:26 who who had eight but you considered ten to be the minimum required yes and so far as incident response officers um you needed 10 um or rather there were 10 which was half the number you considered was to be
01:45:37 half the number you considered was to be the necessary minimum corresponding with the 20 that lbhf had yes yes and those numbers were against the backdrop of a couple of years you say of decline yes
01:45:49 couple of years you say of decline yes yes now let's then thank you let's look at the action sheet from the meeting that um for which this was the report this is at rbk3058
01:46:00 if we go to page one
01:46:04 um there's the action sheet and you can see who was present at the meeting
01:46:10 meeting some familiar names nicholas holgate uh um
01:46:14 uh um and from other modules jonathan bohr nigel palace um is a familiar name uh and if you go then to page um uh two
01:46:26 uh two um
01:46:28 um in the second paragraph down it says nh that's nicholas holgate suggested that existing bi or triboro h f trained staff could be approached to cover our bkc as well this may fill some
01:46:40 cover our bkc as well this may fill some gaps he asked that each of the five business groups nominate one person to the silver role and that each department nominate one to the incident response role
01:46:49 role now that decision to seek to recruit each roll by five places was still wasn't it less than uh what you had suggested as the minimum requirement yes
01:47:00 suggested as the minimum requirement yes why was that
01:47:04 i mean what led nicholas holgate to go in so low
01:47:08 in so low i can't answer that because although i wrote the report and and all of this i can't actually recollect being in the meeting so i can't i don't have a recollection of the conversation that we had well it wasn't a conversation you go as an officer and the board to
01:47:20 you go as an officer and the board to discuss and you get your instructions it had been the philosophy at rbkc for as long as i was there to not have people appointed to roles
01:47:32 to not have people appointed to roles and be on rotors and certainly not to pay them to be on standby but to seek volunteers for these roles there are other reports i have done in past years one or two reports over the
01:47:43 past years one or two reports over the years expressing the same concerns and considerations um i think at this time i was actually asking for consideration about nominating individuals making it part of
01:47:56 nominating individuals making it part of their job to get the numbers up but that was not how rbkc was doing it and to be fair that wasn't how most councils did it most councils relied on volunteers as well
01:48:08 relied on volunteers as well it wasn't working and i said so but that was the decision sorry sorry bigger problem yeah would you say it wasn't working we weren't getting the experiences we were not getting the numbers it was you
01:48:20 were not getting the numbers it was you know keith and and rebecca would go out to the departments and speak to people people were not volunteering for it there were reasons for that i think um everybody's very busy
01:48:31 everybody's very busy local authorities are lean machines these days and and if they're if it isn't a part of a core role which in within which somebody gets their time to go on the training and go on the exercises and be there
01:48:43 on the exercises and be there and if people are not on a rota then we don't get the volunteers which is why i went to the board to say we have got a shortfall this is not enough the reasons why i said 10 and 20 for the
01:48:56 the reasons why i said 10 and 20 for the respective roles was to have sufficient people so that when you phone down the list
01:49:03 list in the evening or at the weekend and you get voicemail voicemail voicemail that there would be enough people answering the first call to get the first shift in that's why we needed the numbers um and
01:49:16 that's why we needed the numbers um and that was my best guesstimate of the sort of numbers to give you the the the likelihood of getting sufficient people on the first call it wasn't the case then
01:49:27 it wasn't the case then even after grenfell it took a while to get that sorted because it was still volunteers we didn't have enough we had an incident one saturday where we only just got away with it and
01:49:40 where we only just got away with it and i put in a report then and very bluntly said we were at risk of failure and i very bluntly said we needed to do something and at that point the board coughed up put some money to it and the authority by the time i left
01:49:52 it and the authority by the time i left was starting to get people in positions on routers with a fee for that that was making a change but rbkc right from when i got there nobody on a rotor nobody paid for it get
01:50:05 nobody on a rotor nobody paid for it get volunteers executive directors go and nominate people they all say yes nothing comes through
01:50:15 all i can do is put a report in you know and i did so we didn't have enough people the reliance there on trying by borough staff
01:50:25 staff only okay to afar okay some mutual aid we did have mutual aid from those authorities in of course with grenfell but if you're going to ask for people under mutual aid i think you also have enough people to also give under mutual
01:50:36 enough people to also give under mutual aid yourself you know you can't sit there and say we're not going to do something because somebody else could be asked
01:50:42 asked in extremis as as grenfell certainly was even if we'd had all of those people we would still have needed after a day or so mutual aid but that would have been fine what we didn't have was sufficient
01:50:54 fine what we didn't have was sufficient staff to start with
01:50:57 in that last answer you identified an incident one saturday where you say we only just got away with it when was that incident and what was that incident i can't remember i think it would have
01:51:08 i can't remember i think it would have been in 2018 it was an incident in our block of flats down in the world's end estate in chelsea it was a saturday morning there'd been a fire in the
01:51:19 morning there'd been a fire in the electrical sub room which cut off the water supply and the electricity supply to those flats and housing were told it could be 10 or more hours before that supply was put back
01:51:31 hours before that supply was put back lack of electricity was one thing the lack of water of course was another so we responded lelo we had a beck council silver at that time was involved
01:51:43 that time was involved but
01:51:44 but phoning down the list of volunteers to get the newly trained people on the list of volunteers phoning down trying to get enough people for a minimal back on a saturday morning they just got answer
01:51:55 saturday morning they just got answer phone after answer phone after answer phone it was saturday you know people are out doing stuff as it happened although we'd set up a rest center although we had people out knocking on doors we had communications and other
01:52:07 doors we had communications and other things going the need for support for people was so small that it didn't become a problem and by
01:52:15 and by the mid-evening we were able to scale all of that down but i wrote a report then to the management board that said very explicitly we came very close to failure
01:52:26 explicitly we came very close to failure and would likely fail on a future occasion and at that point and we were post-grantful of course finally the new management board bit the bullet thank you now in brief i think it's
01:52:38 thank you now in brief i think it's right isn't it that the issue the problem
01:52:41 problem of lack of staff in in in um emergency response arose in 2016. you you raised that again with nicholas holgate in that year january of that year certainly i know i had raised it at
01:52:52 year certainly i know i had raised it at some point in the past yes and
01:52:56 and uh we can read the emails from january 2016 themselves but was the position that the overall numbers continued um after um this time to decline
01:53:09 um after um this time to decline um i think it probably didn't decline any more than it was i can't remember now the precise details and i know in my statements you've got at various points the numbers that were there
01:53:20 the numbers that were there i think we were pretty much at rock bottom at that point and i don't think it's substantially improved right we have the numbers indeed page 11 of your second statement paragraph 5.2.4 onwards for those who
01:53:31 paragraph 5.2.4 onwards for those who want to see that but just summarizing it is it right that as of june 2017 there remained a significant shortfall in the number of available council silvers in my professional opinion yes
01:53:42 my professional opinion yes and and uh i think it's right that by june 2017 there were only three trained council silvers you stuart priestley and tony redpath yes so not even the 10
01:53:53 tony redpath yes so not even the 10 recommended back in late 2014. no no
01:53:59 [Applause] um let's send then to a slightly different topic which is training in relation to emergency or contingency planning did you understand that the council rbkc as a category 1 responder
01:54:11 council rbkc as a category 1 responder were under a legal duty to carry out exercises and training for the purposes of ensuring that its contingency plans were effective yes let's go to the cmp again please
01:54:22 let's go to the cmp again please rbk404396
01:54:28 and go to page 11 section 1.8
01:54:36 heading training and exercising
01:54:39 and it says this contingency management plan shall be exercised at least once annually the exercise shall test and validate the activation of the plan the operation of the borough emergency control centers back
01:54:50 control centers back the lists the links between the becks and council services and then it says training shall be offered in each year for staff with designated emergency response roles and
01:55:01 designated emergency response roles and shall take the form of specific training sessions seminars and talks and workshops
01:55:07 workshops the boroughs will participate in the regionally organized exercises for london local authority gold and the london local authority coordination center arrangements now were these new training
01:55:19 arrangements now were these new training requirements or goals in this edition the april
01:55:22 the april 2015 edition of the contingency management plan um original were they new or were they carried across from earlier editions um i would have to look at the other
01:55:33 um i would have to look at the other editions but i suspect it was broadly similar language across them
01:55:40 and when did the requirement for annual training start um it wasn't an imposed annual uh sorry an imposed condition it's something that just seemed to be good practice or or a
01:55:53 just seemed to be good practice or or a good idea to say that we ought to do it at least annually um i can't recall ever having that prescribed to me for that
01:56:01 for that but given that we were doing um annual exercises with exercise safer city and sometimes more it seems to be a sensible thing to say i believe the
01:56:12 sensible thing to say i believe the authority these days are now doing two exercises a year and as of june 2017 were you satisfied that these plans were being exercised annually in accordance with what's said here
01:56:24 no not fully i we were doing um some exercises we were doing some training but if i look back
01:56:33 back i do not believe as an authority we did sufficient right now you say looking back at the time were you aware uh
01:56:41 uh of your own dissatisfaction that the plans were being exercised properly in accordance with the plan
01:56:49 no i think at the time i was aware that we were not training people sufficiently for that i think the plan was being exercised um either through exercise safer city or
01:57:01 um either through exercise safer city or exercise connects but that isn't the same of course as a very in-depth full exercise of everybody that could possibly be involved so i was aware that we were not achieving that and what did you do about that what did you do about
01:57:13 you do about that what did you do about the fact that at the time as you knew you weren't training people sufficiently
01:57:19 i don't think i did anything specific this was wrapped up in the discussions about we haven't got enough staff and if you haven't got enough staff you can't do very much training and if you haven't got enough trained staff you can't
01:57:30 got enough trained staff you can't really do much exercising but that's sort of
01:57:32 sort of chatting around i don't have anything in writing for you that says that i see but were you confident at the time that those
01:57:40 those seniors and those decision makers within the council to whom were you you were making your complaints about understaffing understood that that affected adversely the ability to carry out training in accordance with
01:57:52 to carry out training in accordance with the cmp
01:57:54 the cmp i don't know
01:57:58 i mean they were aware of what training we were doing
01:58:04 i'm sorry i don't know i don't know that if i don't think i can answer your question
01:58:09 question did you ever tell them look uh we're understaffed and not only are we under staff we're not being we're not able to train people properly in accordance with what our our own contingency management plan requires
01:58:20 plan requires i can't recall if i specifically said that i'd like to think that that was a part of the conversation but at this remove i can't recollect particular conversations
01:58:31 particular conversations now is it right that staff with designated emergency response roles are those with council gold council silver and beck staff positions yes yes and and um there's a reference
01:58:44 yes yes and and um there's a reference to the the council gold group who is the council gold group that would be the chief executive the executive directors of the core
01:58:56 the executive directors of the core departments and one or two other particular professionals that would bring a resource for example legal and finance and human resources so is this
01:59:07 so is this so the strategic managers plus some professional advisors right now let's go to your first statement then please page eight paragraph 26
01:59:23 you say there regarding training within the council the council gold group training consists of sessions with the chief executive executive directors and a number of departmental directors the date of the
01:59:35 departmental directors the date of the last gold group training prior to june 2017 on strategic command and control and recovery was 14th september 2015 and it consisted of a table talk discussion
01:59:46 it consisted of a table talk discussion around a fictional scenario chalk and talk and feedback so
01:59:54 so it goes without saying i think but obviously correct me if i'm wrong about this that the last training session for gold on strategic command and control and recovery was some 21 months before the grenfell tower
02:00:06 some 21 months before the grenfell tower fire yes yes what format did that training take it says table talk discussion around a fictional scenario but have you got any and can you recall any further detail
02:00:17 any further detail so it was a two hour session i had asked for four hours i was originally offered a slot at a jm's at a joint management team meeting i think nicholas eventually compromised on two hours
02:00:29 on two hours it was in two parts the first part of response the second part on recovery so it started with a powerpoint presentation on response which outlines the key
02:00:40 on response which outlines the key elements of response from the cmp we then gave them a scenario and then in tables mixed tables of people for them to discuss what the responses at a gold
02:00:51 to discuss what the responses at a gold level would be what might inform the strategy then after a break exactly the same but for the recovery so a powerpoint presentation about the core elements of recovery uh table top discussion then amongst
02:01:03 uh table top discussion then amongst those groups about what the strategy might be for recovery to that particular scenario and then open plenary feedback and and people reporting back on that and what documents were available did
02:01:14 and what documents were available did you have the cmp did you have the annexes did you have the guidance what did you have oh gosh i can't remember they certainly would have had access to the cmp certainly they would have had on their tables the
02:01:26 their tables the from the cmp the two first meeting agenda
02:01:30 agenda first meeting agenda for a gold group in response and then the first meeting agenda for the recovery group those are two pages within this cmp those were printed off and available for them they
02:01:41 printed off and available for them they wouldn't have had all of the annexes no but they did have the emergency planning staff there too to to advise or ask questions and those agendas i think we've seen we may see later were standard form was set within the cmp yes
02:01:53 standard form was set within the cmp yes now um
02:01:57 well
02:02:00 do you consider generally the gold group training provided sufficient training in accordance with what we've read at paragraph 1.8 of the contingency management plan it certainly gave
02:02:13 a good outline of what the roles of the gold people were and the sorts of issues they would be discussing and a chat about that
02:02:24 discussing and a chat about that i would have liked more time because had i had more time we could have gone into more detail and looked at more elements and perhaps touched upon some of those regional issues more within the time scale that we had
02:02:36 scale that we had i do believe that it gave everybody there an understanding of what their strategic role was as opposed to the tactical role of others do you remember within the training whether there was
02:02:48 within the training whether there was any education given to council gold about what criteria should be taken into account when deciding to go out and ask for mutual aid from other boroughs or invoking
02:03:00 aid from other boroughs or invoking that's the same thing london local authority gold i don't recall that level of detail
02:03:07 of detail it may be that we talked about mutual aid but if we did it would have been as a concept right but you certainly wasn't a core part of the course why not
02:03:19 i don't know at this point but i did have only two hours right and that sounds as if that answer that you didn't regard that as sufficient it was a
02:03:30 regard that as sufficient it was a compromise oh it wasn't sufficient um i knew it wasn't sufficient i'd asked for a four hour slot um
02:03:37 um i was first told that um couldn't i do it in the joint management team meeting like a briefing no we need to do this as training i was compromised i was given two hours
02:03:50 i was given two hours at the end of that training as mr holgate left he just said to me next time you need longer was he the one who originally resisted giving you longer yes
02:04:06 what did you say to him when he said to you next time you need longer i didn't say anything there's a limit to what a junior officer can say out there to a chief executive
02:04:17 um now um i've shown you that the contingency management plan requires training for gold each year
02:04:26 each year um could you explain why the training for the council gold group was not undertaken annually at least after 2014. i can't answer that
02:04:38 i can't answer that i can't no i don't know why we didn't plan on for 2015. that first 2016. i'm sorry how supportive did you consider senior management to have been
02:04:49 management to have been in relation to training and exercising not supportive there was resistance for senior managers attending some of the training
02:04:58 training uh we've had that resistance in the past for this particular training in 2015 i did ask and nicholas readily agreed that
02:05:06 that we could put out the email to all of the for needing a three-line whip is because everybody's very busy and you know everybody not everybody
02:05:17 and you know everybody not everybody attends everything and we needed a good attendance so so nicholas in the email that went out from his secretary i drafted it for him but it it very strongly told people that
02:05:28 but it it very strongly told people that they needed to come having said that i did have immediately an email from one of the executive directors not with us by the time of grenfell querying why she needed to attend because she had done some
02:05:39 attend because she had done some training at another authority um so that just gives you this sort of instance the um the issues of attempting to to deliver this sort of training
02:05:54 did you form a view at the time about how
02:06:00 about how seriously senior management including the chief executive took contingency planning
02:06:10 i do believe that nicholas did take it seriously in that when he became joint chief executive uh he actually called in my colleague at
02:06:22 uh he actually called in my colleague at hammersmith and fulham and myself to give him a briefing and he said very openly there he said you know i'm not from the typical local authority background you will have to understand i don't have that operational bit you will
02:06:33 don't have that operational bit you will need to help me so we gave him that initial briefing we later on gave him a written briefing specifically about flooding because there was a potential for a breach of
02:06:44 there was a potential for a breach of the thames wall at one point in hammersmith which could have had certain effects so so we were doing a lot of planning around that so we gave him some written stuff about that i know that nicholas had had
02:06:55 i know that nicholas had had guidance
02:06:57 guidance from the london resilience group about the role of london local authority gold before he went on to that rotor
02:07:06 so i i do believe he he took the issue seriously as an individual i don't doubt that and and
02:07:15 and and although i've said what i've said i did feel supported at times on talking about matters with nicholas and things like that i i never got a sense that he was being standoffish about that
02:07:26 being standoffish about that the other reality though was that you know just getting people to go to training generally was becoming an issue getting people to volunteer for roles as i've demonstrated was an issue
02:07:38 i've demonstrated was an issue um
02:07:40 um it is a fact that in most local authorities and certainly in rbkc it is actually quite rare for a gold group to be formed in response to an
02:07:51 group to be formed in response to an incident in a borough because in most cases incidents are
02:07:56 are in impact small enough to be dealt with by a silver and one or two people in the back and liaison officer that i have been our experience when we had had incidents including some fires before
02:08:08 incidents including some fires before there might be a call to the chief executive to brief them and to let them know but it was very very rare for for gold groups to meet what have you now i'm not excusing anybody it's not for me
02:08:19 i'm not excusing anybody it's not for me to put excuses up but i think the culture was that you know a management board deal with issues every day of the week and if they come together in a gold group their job is to do what they do as a senior management
02:08:31 do what they do as a senior management board but in a concentrated area um clearly as it was demonstrated that isn't a sufficient attitude and um you know much better goals training
02:08:43 know much better goals training was
02:08:44 was necessary we hadn't provided it thank you now let's then turn from gold to silver
02:08:51 to silver um
02:08:52 um if um if we are if we think about the council's silver rule for a moment was there any formal training program for that role
02:08:59 that role at that time no not a formal training program so how did council silvers receive their training as as required under the plan
02:09:10 training as as required under the plan so that was a mixture of individual briefings and attendance exercises and attendance at some some other training events but it wasn't a formal silver program why not
02:09:24 silver was
02:09:27 a concept that we were coming to at that point so we were in a transition generally across london in in that role of management in an emergency
02:09:38 of management in an emergency you've seen the expression in our plan borough controller or emergency controller in common usage where a senior manager would effectively
02:09:50 a senior manager would effectively be in the back who are managing that and that wasn't particularly a council's silver role as we would now determine it's the tactical coordinator
02:10:01 coordinator we were moving into that terminology partly because hammersmith and fulham used it so part of our harmonization was to to call that role uh that developing role silver and certainly out of exercise unified
02:10:13 and certainly out of exercise unified response the year before in 2016 where we really examines the whole emergency management bit operationally it came out of there that we needed to
02:10:25 it came out of there that we needed to say to london london local authorities need to recognize there is now a role of council silver which is not managing the beck the beck merely becomes a tool for them
02:10:37 the beck merely becomes a tool for them and the work that we were working on at that point across london which got published in 2018 brought these roles out the role
02:10:49 brought these roles out the role specifically from the back guidance documents training uh specifically for that role now um how regular did how regularly did
02:11:00 now um how regular did how regularly did silva get trained oh not regularly in terms of training it would have been from the ability to go ahead and exercise from time to time or tabletop from time to time
02:11:10 to time and who delivered the training um sometimes that would be rebecca or keith or me sometimes that might be a london resilience tabletop exercise sometimes
02:11:21 resilience tabletop exercise sometimes it might be the annual safer city exercise which was delivered centrally across all 33 boroughs and was it assessed was the training ever assessed by no right
02:11:32 by no right was it in your view at the time sufficient to enable silvers to perform their duties in the manner in which we delivered our emergency management response at that time
02:11:44 time it didn't seem inappropriate at that time
02:11:48 time subsequently with properly put defining the roles
02:11:53 the roles we developed across london and i delivered in kensington and chelsea for our new silver's post-fire formal silver training to a standard that had been sent by
02:12:05 to a standard that had been sent by london and to you know so that everybody across london was getting the same training as a council silver and the support documentation to go with that what triggered the change after grenfell then in terms of the training delivered
02:12:17 then in terms of the training delivered to silvers partly the experience of grenfell but primarily it was the drive that had started in the aftermath of exercise unified response
02:12:29 unified response because exercise unified response um we very deliberately as local authorities targeted within that exercise uh a look
02:12:40 targeted within that exercise uh a look at buried emergency control centers and what became the silver role because we were aware as professionals that we had for you know local authorities weren't getting to grips with that we used that
02:12:52 getting to grips with that we used that exercise we published our results the local authorities panel and then we started a work stream to examine and identify good practice so that we could then bring those roles in
02:13:04 that we could then bring those roles in that work was in progress at the time of grown full fire following the fire london local authorities put in extra money to employ some people to fast-track the work that we had started
02:13:17 we had started so my revised bori emergency plan and borrow emergency control center manual in august 2017
02:13:28 in august 2017 took in the lessons as far as we could from our experience in the fire and what we had developed so far from the post unified response bits and we republi we published those and i did training at
02:13:39 published those and i did training at that point that form for the the that beck manual in turn
02:13:45 in turn informed the final product out of unified response and a year later we had got a new iteration of the bec management manual uh the standardized one and we had the training for that
02:13:57 one and we had the training for that which i had in a part of devising where we had for each local authority the same training package and i delivered that training for us council silvers and our bank managers and our best staff before i
02:14:09 managers and our best staff before i left in 2019 before the fire what was the nature of the training provided to the beck staff the back staff training was delivered originally by keith robbins and more
02:14:20 originally by keith robbins and more latterly by rebecca blackburn it was from memory because i didn't do it but from memory it was using the back manual of the time very much as the working document it
02:14:32 very much as the working document it would start off by taking people literally in through the door and how you open the back literally how where's the light switch where's this well how do you actually get this
02:14:42 get this this this this this room into being and then they would be taken through the roles of the of the various roles of the inner back um that would be the the direct teaching
02:14:53 um that would be the the direct teaching of it and then that would be reinforced later on by inviting people to take part in exercises and how regular was the training provided to beckstarf before june 2017. before june 2017 it was as
02:15:06 june 2017. before june 2017 it was as and when there were staff to be trained ad hoc it was ad hoc if we got some volunteers in then a training course would be arranged
02:15:17 training course would be arranged now
02:15:19 now i want to ask you about rest center managers
02:15:24 how did the crisis support team fit in if at all into an emergency response and the running of a rest center
02:15:32 so the crisis response team
02:15:37 which was a team which was in existence when i arrived at the borough
02:15:43 borough not part of emergency planning but part of
02:15:46 of what today would call out at social care although we drew people from across the authority
02:15:50 authority that was a team that came together i think following the um 911 experiences and then the 20th of july 2005 experiences and it was primarily there to give
02:16:03 and it was primarily there to give emotional
02:16:04 emotional support to people who might be badly affected this is the public by such an incident when they were in a survival reception center or somewhere like that
02:16:15 reception center or somewhere like that they later on agreed that actually yes they would have a role that we could call upon them for emergency rest centres generally and provide that role within it and in relation to the specific role of a rest centre manager
02:16:26 specific role of a rest centre manager how many qualified staff did rbkc have as at june 2017 to carry out that role one who was that i can't recall the name but it is in the annex cp hcmp1 right
02:16:38 but it is in the annex cp hcmp1 right and was that enough no
02:16:40 no and was it the case that rbkc was in essence completely reliant on the brc the british red cross or other london boroughs to staff a rest center
02:16:51 london boroughs to staff a rest center we very much had taken the decision earlier and with chief executive not nicholas the previous chief executive agreement that we would work use the british red cross service for our rest center staff
02:17:03 service for our rest center staff that was a service they offered we had a memorandum of understanding about that um a few other authorities by this time were also using british red cross in that staffing way
02:17:14 that staffing way our view in doing so was that here was a body of people who were trained uniformed dbs checked and had a call out system to get a team of volunteers
02:17:26 system to get a team of volunteers forward it seemed to us to be the safer way to actually get the right people in the right time to a rest center i caveat that
02:17:35 that with the sort of rest center experience we all had of course was nowhere near the scale of the grenfell fire and the resource that we had identified
02:17:47 and the resource that we had identified and agreed for i think would have been suitable for most other incidents that we were familiar with at that time right and
02:17:59 you refer to the memorandum of understanding um
02:18:03 um with the british red cross just for our reference purposes that's at rbk3058064
02:18:12 um that was you'll remember dated september um or ran from september 2015 to september 2016 but it expired by the time of the grenfell tower fire is that
02:18:23 grenfell tower fire is that it seems to have done so um that's an administrative error it should have been a new one should have been put in um but i
02:18:31 um but i can say quite clearly that that did not make any difference to the responsible british red cross the memorandum of understanding was something that boroughs were invited
02:18:42 was something that boroughs were invited to contribute to because that was a way of channeling some funding to them and returned from which they could do some training but it wasn't a requirement for of a local authority in order to get
02:18:53 of a local authority in order to get british red cross support right subsequently after the fire local authorities panel then got london to get a london wide mou which is red cross rather than relying
02:19:05 which is red cross rather than relying on the individual boroughs right so before the fire was it the position that the mou would be commonly used between boroughs and the brc but but not universally it was certainly not
02:19:16 universally it was certainly not universally some local authorities in london had taken doing the mou quite a number of others were not did you understand at the time or have any thoughts at the time about whether using the brc in that way was a derogation of
02:19:27 the brc in that way was a derogation of the responsibilities and duties that rbkc had as a category 1 responder and as a local authority in relation to the setting up and management of a rest center no why is that
02:19:39 center no why is that it was identifying a resource for that function the local authority has a lot of jobs dealt with by in-house staff and an awful lot of things dealt with by contractors and others this was
02:19:50 with by contractors and others this was simply where is the resource that is going to be available
02:19:55 available that was a resource as i say trained for the role with all of the equipment for the role and with the ability to call people out and deliver it at that time that seems to me to be a good way of
02:20:07 that seems to me to be a good way of discharging our our responsibility right let me see if i can put this to rest as it were go to rbk three zeros one nine
02:20:18 i'll show you the first page of this document this is the humanitarian assistance framework under the nrp um and
02:20:26 um and if we look at the bottom right hand side it says april 2017. so this was the current version i think as at the date of the grenfell tower fire um and um if we go to paragraph 8.15
02:20:39 we go to paragraph 8.15 which we will find on page 24
02:20:47 um sorry back page 23 page 23. sorry i'm so sorry page 24. i was right first time 815. the responsibility it says for the
02:20:58 815. the responsibility it says for the set up and running of rest centers lies with the local authority supported by voluntary agencies who would activate arrangements as outlined in their rest center plan the decision to set up a rest centre will be made by the local authority often at the request of the
02:21:10 authority often at the request of the police
02:21:11 police or i should say fire brigade so does does that ex does that set out the the basic arrangement so that local authorities could discharge their responsibility for establishing an operating arrest center
02:21:24 establishing an operating arrest center by leaning on voluntary agencies such as the brc
02:21:29 the brc i don't think it takes away the responsibility of the local authority to be responsible for it but certainly i believe it enables the local authority to to seek the resource from wherever it might be appropriate so an outsourced resource
02:21:41 appropriate so an outsourced resource effectively but the responsibility responsibility is still with the local authority
02:21:46 authority right
02:21:49 uh and would that mean that the local authority would have to exercise monitoring and supervision roles
02:21:58 roles over the
02:21:59 over the brcs or other voluntary sectors activities in setting up and running rest centers yes my understanding is that the british red cross would put their staff in but
02:22:10 red cross would put their staff in but there would still be a need for a senior manager from the local authority to attend and represent the local authority and be responsible for the local authority physically present i believe so yes right
02:22:21 so yes right uh now um can i then turn to a slightly different topic which is pan london um uh
02:22:26 um uh if we go to your first statement please page 10 paragraph 37 you say
02:22:32 you say there that in addition to i'm sorry i'm so sorry we'll wait till it comes up under the heading pan london training you say in addition to the training that would take place within the council for council gold beck staff and the lelo's
02:22:44 council gold beck staff and the lelo's as well as training for my emergency planning team there were a number of external training exercises which rbkc took part in those in the years preceding the fire are detailed below
02:22:55 is it right that the london the london authorities panel the lap had specific annual training for local authorities run by the lrg the london resilience group yes yes
02:23:08 resilience group yes yes now let's just look at one or two of those was one such the exercise connect training exercise that you've referred to yes that was annual yes and was it
02:23:19 to yes that was annual yes and was it right that rbkc participated every year yes up to june 2017. and was the goal to test communications between the beck and the llac the london local authority
02:23:30 and the llac the london local authority communication center yes and using the words in your statement is it fair to describe that exercise as a communications validation test rather than a training opportunity yes yes and
02:23:41 than a training opportunity yes yes and that was presumably is this right to ensure that the communication systems were working in accordance with the minimum standards for london yes and those standards were laid down by the lap yes yes
02:23:52 the lap yes yes now let's look at exercise um safer city then as the next one you cover that in your statement of paragraph 39 on page 11. if we can just go to that please
02:24:07 11. if we can just go to that please um you say there is also an annual exercise called exercise safer city which primarily exercises london la gold and the llac see
02:24:17 see the exercise was held on 21st of october 2015 again on 9th of february 2017 and most recently on 13th and 14th march 2018 it is up to each la as to how
02:24:29 2018 it is up to each la as to how involved they become the council runs its beck for several hours and the la gold tests their ability to coordinate becks and receive situational reports
02:24:40 becks and receive situational reports uh
02:24:41 uh now uh
02:24:43 now uh local london local authority gold is a term i think we haven't yet come across in your evidence could you explain as briefly as you can please what that was a rotor
02:24:55 a rotor of all well of most london local authorities chief executives on a router to be london local authority gold that if there was an incident which either an individual local authority was
02:25:08 either an individual local authority was starting to need some support for or if there was an incident affecting london particularly at which london local authorities would need to be represented at the london strategic coordinating group
02:25:19 group a one local authority chief executive would be able to do that and to represent all 33. and is it right that before the granville tower fire in june 2017
02:25:31 2017 exercise safer city was held on those two dates but the last one being the 9th of february 2017. yes and is it the case that rbkc didn't in fact participate in the exercise on the
02:25:44 fact participate in the exercise on the 21st of october 2015 because it wasn't relevant to our bkc because
02:25:49 because it was about fluvial flooding we didn't
02:25:55 we didn't sorry
02:25:57 sorry the x yeah so the scenario didn't have any reality for the people in rbkc
02:26:04 in rbkc now my memory slightly going here can i ask you is this the exercise in 2015 where we ran our own exercise within exercise safer city
02:26:16 exercise safer city uh
02:26:17 uh uh i believe it is yeah so what we did on something was say within hesitating so so so on on forever so come to it the exercise was held exercise for city
02:26:28 exercise was held exercise for city elements core elements of that were there at one point the the the lack the london local authorities coordination center would send out a request for a situation report and another point a request for us to put in
02:26:39 another point a request for us to put in on on a format and mutual aid request outside of that there were a number of injects as we call it events developing and happening which individual local authority becks
02:26:51 which individual local authority becks would manage because the scenario fluvial flooding wouldn't work we developed our own scenario and our own set of injects we started the
02:27:03 own set of injects we started the exercise at the same time as safer city we
02:27:07 we through the emergency planning staff did the few elements of linkage on communications with the lac but we ran a back exercise on the on our own scenario so it was a borough emergency exercise
02:27:19 so it was a borough emergency exercise now in that connection let me just take a sideways step for a moment uh it sounds as if what you did was to look at the london wide exercise decide it wasn't appropriate for your borough and do a
02:27:31 appropriate for your borough and do a substitute exercise instead that was yes right um
02:27:35 right um looking back at some of the questions before the break that you answered about risk assessment um when you created your risk register
02:27:47 created your risk register for
02:27:48 for rbkc did you do it from scratch or did you use as your starting point the community risk register the london wide risk register i believe i think
02:27:59 i think we use the community risk register for london and took from that the
02:28:05 the key
02:28:06 key ones that we thought might impact on the borough as it might affect the other colleagues in the boroughs in its forum so if there wasn't if there was a risk which wasn't listed on the community risk register the london wide risk
02:28:18 risk register the london wide risk register
02:28:19 register it wouldn't make its way onto the rbkc risk register is that right i wouldn't have thought so no right um now you i'm going to come to um the
02:28:30 um now you i'm going to come to um the exercise
02:28:32 exercise responder which you mentioned a moment ago in a moment um is it right that
02:28:38 that rbkc didn't participate in the exercise safe for city exercise on the 9th of february 2017.
02:28:49 no i think that's the wrong way to look at it
02:28:51 at it we ran our own exercise scenario within it but we contributed to the london exercise by contributing the relevant parts of that exercise which were to to provide a specified time a situation
02:29:03 provide a specified time a situation report and another time in mutual aid report so the elements of safer city for the lac the london local authorities coordination center was about them receiving 33 sick reps and their process
02:29:16 receiving 33 sick reps and their process of assimilating that into a gold report and then later on assimilating a bunch of mutual aid requests that was the exercise for them as part of safer city the the exercise for the borrower was
02:29:28 the the exercise for the borrower was either using the scenario and the injects from that from the center or
02:29:34 or with agreement and i did have agreement to this in advance um of actually running our own scenario at the same time that gave better value
02:29:45 at the same time that gave better value in the training aspect for our exercise whilst at the same time still giving the central exercise what it needed to be successful there yes i understand the relationship my question was about the
02:29:57 relationship my question was about the date we've come we're going to come to the 21st of october 2015 specific rbkc exercise in a moment my question was about the one done on in february 2017
02:30:09 february 2017 did rbkc participate in exercise safer city held on the 9th of february 2017.
02:30:21 i sitting here today my memory i can't tell you is there something in my statement that refers to that or because i'm sorry my mind is a blank at that particular point
02:30:32 particular point the the documentary evidence and i don't want to misrepresent this to you but suggest that rbkc did not participate on that date because of staff shortages does that trigger a recollection in your
02:30:43 does that trigger a recollection in your memory
02:30:45 memory that is triggering a memory of certainly at some point we could not get from our volunteer staff enough people to volunteer for an exercise i i
02:30:57 to volunteer for an exercise i i i can't remember the precise detail i'm happy to take what you said right forgive me i'd passage a time but certainly i do know we did have a problem where i think keith reported we did not we
02:31:09 i think keith reported we did not we couldn't get enough people to starve the beck in an exercise and if that was the case that was then but if not for some of the time but certainly i i do remember that was an issue right thank you let's then look at the exercise done
02:31:23 you let's then look at the exercise done on the 21st of october 2015 uh which you've just explained um and we can go i think straight to the post exercise report
02:31:34 exercise report at rbk3058067
02:31:42 uh and all right yes yes now you'll recall i think that the scenario was a helicopter crash between the west way and and the lamb grove bridge yes yes yes
02:31:53 yes yes yes um
02:31:54 um if we um go please to page two section four
02:32:02 um we can see there's the exercise outcomes what went well what did not go so well
02:32:08 so well uh under 4.1 it says following completion of the exercise an electronic debrief was conducted with all participating staff attending
02:32:18 attending the following gives a breakdown regarding what went well what did not go so well and what improvements would you make the responses are a collation of points raised by all participating staff as many of the points were reiterated
02:32:29 as many of the points were reiterated throughout and if we look at um
02:32:34 4.3 what did not go so well we can see a number of them 10 in all item three specifically some it problems
02:32:45 item three specifically some it problems in the beck at startup number four too much multitasking early on supervisor covering officers work item five not enough beck staff early on
02:32:57 item five not enough beck staff early on and need an information officer and a gis operative in the back now gis help me is that a geographical information system person um
02:33:09 um i think it might be all right
02:33:12 all right um
02:33:13 um this is acronym as defeated even you it seems
02:33:19 this at the time i would have known what it was but uh with the passage of time um not i i'm pretty certain the gis were the people that did our uh
02:33:32 the people that did our uh our internal people that did electronic mapping of all sorts of things and would have been a wisdorf add-in to actually produce a detailed map looking at 4.4 what improvements would you make we need to scroll down please
02:33:43 you make we need to scroll down please to look at that item one
02:33:47 item one further training for beck staff including ils information logging system yes and scene awareness and two explanation of acronyms
02:33:58 and two explanation of acronyms ironically and then if we turn the page item four
02:34:03 item four uh
02:34:04 uh i'm not
02:34:05 i'm not i'm not ignoring the others but just highlighting the main ones for you clearer communication channels between all including updates and feedback and structured handovers five need to increase the frequency of borough
02:34:16 increase the frequency of borough exercises six additional roles and recruitment needed in the back uh and more more bec staff required for exercises including an information officer and a gis trained mapping
02:34:28 officer and a gis trained mapping officer say so there they are again what steps were taken to action those areas for improvement at the time
02:34:41 i don't know specifically what we have done i'm sorry after this length of time i can't recall
02:34:53 i can't recall keith robbins did the exercise and did this report uh and i admire its brevity and its clarity because he obviously gave the key bids out may i see the top of the report yes of
02:35:04 may i see the top of the report yes of course page one please
02:35:08 there's the purpose right so that's written in a format to be given to senior managers um but whether it was i can't tell you what this remove but certainly the the format of that report
02:35:20 certainly the the format of that report is our corporate reporting format but i have to say i simply cannot recall what did that report go or not i just can't remember but you would have you would have known wouldn't you given your position
02:35:31 position if these recommendations uh or suggestions had been put into effect uh i would suggest because i can't recall but given my
02:35:42 because i can't recall but given my reports in 2016 or whenever it was about the staffing issues subsequent to this clearly we we didn't have an effective
02:35:53 clearly we we didn't have an effective follow-up
02:35:55 then let's go to rbk3058054
02:36:05 this is an email between
02:36:08 between you and rachel akanby ah in january 2017 as you can see from the top
02:36:16 top and it's about the next safer city 20s or sc 17 exercise due to take place on the 9th of february 2017
02:36:25 2017 and if we go to page 2 we can see her email to you among others asking for volunteers
02:36:32 and she says dear all attached is the sc 17 briefing note one this is an email of dated the 5th of december 2016. please note volunteers are needed to work in x-con
02:36:44 volunteers are needed to work in x-con for safer city the ex-con volunteers will be based at exercise control in merton please nominate two volunteers from your borough second bullet point to make sc-17 realistic i require information on the
02:36:57 realistic i require information on the challenges faced by your borough during the last cold snap of 09 stroke 10 alternatively if you have any area you think we need to test please let me know and rachel acaba was the business
02:37:08 and rachel acaba was the business continuity officer uh at lambeth uh
02:37:13 uh so
02:37:14 so that's her email to you let's see your response which is really where we want to go page one
02:37:21 uh and this is the fifth of january 2017. so six months before the fire grenfell
02:37:27 grenfell and you say this hi rachel and stewart and it's copied to stuart turner at london fire we are struggling with our beck at the moment lots of beck staff have left over
02:37:38 moment lots of beck staff have left over the past few months and therefore we have a recruitment and training task on at the moment this means that we will not be able to run a full bec exercise internally for safer city we will have our bec open we will respond to requests
02:37:51 our bec open we will respond to requests for sit reps mutual aid etc and we will be using the exercise to provide some validation training for our existing bec staff we will also have some links with key departments that would be affected by the scenario but will not be running
02:38:04 by the scenario but will not be running this as a full control point exercise i regret that we simply will not have anyone to spare for ex-con and then you go on to deal with the experience
02:38:15 go on to deal with the experience of the last cold snap uh on kensington and chelsea you see that
02:38:20 that um
02:38:21 um and over the page at page two top of the screen you'll see your name at the foot of that email
02:38:30 uh now it looks from that that i mean it speaks for itself doesn't it yes yes okay um now um do you remember
02:38:41 um now um do you remember moving on or moving back in time to november 2015 that after exercise responder where you did your own sub exercise um rbkc was also involved in another exercise
02:38:53 another exercise called exercise babel yes and do you remember that this was a different exercise because it was organized by the london borough of hammersmith and fulham yes yes and i think our bkc and a number of agencies
02:39:05 think our bkc and a number of agencies participated in it yes and some of those agencies there's a list of them but nhs public health england um
02:39:14 um chelsea westminster hospital to name it a few do you remember that yes i do
02:39:18 yes i do um no um
02:39:20 um no um you you
02:39:21 you you let's just clear up a little date question here um if you go to your first statement please at page 11 you'll see a paragraph 40 um that you date this exercise to the
02:39:32 um that you date this exercise to the 6th of october 2015. you see that i don't but if we go to rbk405188
02:39:40 the exhibits that you provide including the post exercise report if we can just go to that date the exercises the 6th of november 26 2015 as opposed to the 6th of october
02:39:52 26 2015 as opposed to the 6th of october do you remember which it was was it october or was it november i cannot remember right it is more likely i would suggest that your statement is wrong and that the contemporaneous document is correct i
02:40:03 contemporaneous document is correct i would accept that right do you remember what was the nature of this exercise it was a what we call a tabletop exercise that is there are a number of tables with a mixture of different
02:40:15 tables with a mixture of different organizations sitting around each one a scenario given discussion about that feedback then a development of the scenario more discussion and more feedback about that
02:40:26 feedback about that the
02:40:28 the location
02:40:30 location of the incident was a tower block of flats which is owned by hammersmith and fulham council but geographically in a little bit that otherwise would have been knc
02:40:42 bit that otherwise would have been knc so it was surrounded by knc it was right by the um
02:40:46 by the um the crossway um so
02:40:51 it enabled the
02:40:55 not by burr as such but it enabled both boroughs to consider that issue because for an incident like that it would be likely that we would be providing the rest center rather than set the fulham because geographically our buildings
02:41:06 because geographically our buildings were there and that's quite common amongst london local authorities where if you've got one authority's got an incident by the border the neighbouring borough might actually provide the rest center for them so it gave us that type of thing um
02:41:19 them so it gave us that type of thing um if i could pause you down just scroll down you could see the scenario and it says royal borough kensington and chelsea's call center has been informed of a fire on the 19th and 20th block
02:41:30 of a fire on the 19th and 20th block floors of a of stebbing house queensdale crescent white city w11 the entire block is going to be evacuated an explosion follows resulting in casualties and fatalities which
02:41:41 in casualties and fatalities which caused the number of secondary incidents on the west cross route now
02:41:47 now just
02:41:50 almost out of curiosity
02:41:54 do you remember whether the lfb had any input into this exercise into designing it i can't answer any questions about the design of it um denise prieto the
02:42:05 design of it um denise prieto the emergency planning manager at hamilton fulham designed the exercise and did it and then she offered to bring us in for that
02:42:13 that and keith robbins from my team then participated with her in some of that i attended as an attendee on the day so i'm afraid i can't answer your question right um if you look a little bit above
02:42:25 right um if you look a little bit above it under participation it refers to the other agencies um namely the blue lights including of course fire and you can see the a number of other participants some of which i've
02:42:36 participants some of which i've identified for you did the did the lfb take part in this exercise um my memory suggests they were there and several of them right and the reason i'm asking is because
02:42:47 because well let me put it this way were you surprised that they fly a fire on two floors only of a high-rise residential block um would
02:42:58 um would uh result in the entire block being evacuated
02:43:02 evacuated and therefore triggering um a response the subject of this exercise had that been
02:43:09 been a fire on its own right i would have been surprised but if a memory serves me right this um the scenario involved the prospect of some terrorism within it
02:43:23 prospect of some terrorism within it uh in which case i wasn't surprised that the whole block would be evacuated for that purpose i see um let's go then to page four of this document
02:43:33 document uh where you can see a summary and it says the aims the aiming objectives of this exercise were very well met
02:43:41 well met all agencies recognized that they would be under intense pressure but they would cope mutual aid arrangements are in place and certainly came into play in this instance very positive feedback overall the exercise highlighted the
02:43:52 overall the exercise highlighted the need to understand arrangements in general between boroughs when responding to an incident spanning both boroughs
02:43:59 and then it goes on in the next paragraph in the second part of the next paragraph
02:44:04 paragraph the only gray area was with obtaining information with regard to vulnerable people from other agencies to get a picture as a whole who holds what how do we get the big picture and then under action going forward it
02:44:16 and then under action going forward it says
02:44:17 says tribara asc that's adult social care i think yes have requested that we run a multi-agency exercise concentrating on the issue of identifying the vulnerables as a result of this workshop an initial
02:44:29 as a result of this workshop an initial meeting will be set up to look at what shape this will take we are looking for this to take place before end april 2016.
02:44:38 2016. now was a multi-agency exercise undertaken concentrating on identifying vulnerable persons
02:44:46 i don't have any recollection of that i can't say yes or no but i don't recollect it um note the date uh and we'll they will come in detail to it a little bit later
02:44:58 come in detail to it a little bit later in your evidence but note the date 6th of november 2015 do you recall that that's about a week after a fire at adair house in the borough in which
02:45:12 at adair house in the borough in which there was
02:45:13 there was a mass evacuation by lfb i certainly remember the idea of fire right what do you remember about it um well i was the on-call borough duty
02:45:24 well i was the on-call borough duty officer that day so therefore i got the call
02:45:28 call from
02:45:29 from our call center to say that well yeah i got the call from our call center who would have been called by one of the emergency services to say that there was this fire there so therefore i activated our emergency procedures for that
02:45:41 our emergency procedures for that and i was effectively the beck for where i was for that i had a layla at the scene
02:45:50 i then sent one of my emergency planning officers to back that up housing were involved the tenant management organization were involved there was fire damage to i think four
02:46:02 there was fire damage to i think four flats on one floor um certainly one person taken to hospital smoke inhalation possibly two indications from the fire brigade quite early on that the evacuation for most
02:46:14 early on that the evacuation for most people would not be for a very long period i had put on stand by one of our designated rest centers and i think i put an alert called out of british red
02:46:26 put an alert called out of british red cross
02:46:27 cross but a local church opened its doors spontaneously and when my emergency planning officer keith robbins went there to look at it his assessment was that the community were being adequately looked for and we
02:46:39 were being adequately looked for and we thought well pointless moving people from there to somewhere else for only a couple of hours before they go home my recollection is that people mostly were allowed to go home fairly rapidly
02:46:50 were allowed to go home fairly rapidly and that housing and tenant management organization between them were dealing with then the re-housing of those people that were unable to go home because their flats were too badly damaged for that
02:47:01 that now um moving on then to exit well so before i leave babel was the tmo involved in the exercise babel i don't think so
02:47:10 think so given that it involved evacuation was there any thought given to involving the tma
02:47:18 i don't know i i'm not aware of that all right let's then move to another exercise in 2016 that you refer to in your statement namely exercised unified
02:47:29 your statement namely exercised unified response
02:47:30 response um
02:47:31 um uh in that year and i think that was a four day response exercise yes yes and um
02:47:37 and um it was a live response for the emergency services but i think it's right that a number of different local authorities came together to run a beck for four days yes so and there were eight shifts across
02:47:49 so and there were eight shifts across four days yes yes uh and the focus of one of the focuses is this right was running a mutual aid bec
02:47:55 bec yes very purposely not to put entire council back teams in but very purposely to put totally mixtures of people in knowing that that would provide some
02:48:06 knowing that that would provide some issues so that we could identify those and move forward with the standard a standardization project i see did you have a role in that exercise i was one of two observers of that beg um i was
02:48:18 of two observers of that beg um i was part of the team supporting joe cousins at lambeth who who ran that part of the exercise for us uh so in sort of scoping the place out and sort of general advice about what
02:48:30 and sort of general advice about what we're going to do there but on the exercise itself marion hearns from the city of london corporation an emergency planner there and i spent four days observing and noting
02:48:41 spent four days observing and noting down and recording our observations about the four sorry the eight beg shifts and the eight spec managers or council silvers that were involved across those four shifts
02:48:52 were involved across those four shifts and from that we wrote a
02:48:57 wrote a multi-page document
02:49:01 document setting out the experiences we observed and with a series of recommendations to take matters forward and that report went to the local authorities panel and is let's look at it i think it's this document rbk3033595
02:49:15 please
02:49:19 is that the document yes
02:49:23 yes and did you author that jointly authored with marion with marion hearn right and it says the date is 17th may 2016.
02:49:31 may 2016. um if we just go just one thing in it please page five paragraph 5.3.5 um information management incident log one of the things that was picked up
02:49:43 one of the things that was picked up here was that the online logging system provided for the exercise back had to be used with minimal training and wasn't set up to do anything other than record information beck staff were unable to filter the various tasks outstanding items or use
02:49:55 various tasks outstanding items or use it to manage their area of work it therefore was not an effective information management and coordination tool
02:50:04 was that a problem at rbkc particularly or a problem across the back
02:50:11 the back now that was the this is the the bec that was created for the exercise at unified response so it wasn't in an existing local authority control center we were down at a disused
02:50:23 control center we were down at a disused power station in kent um and with manual facilities so it was just created for the purpose of the exercise the logging system that was used if i remember rightly was something
02:50:35 remember rightly was something using google in some way i didn't create any of that right at the time rbkc's logging system which we had created ourselves using um sharepoint microsoft sharepoint which
02:50:47 sharepoint microsoft sharepoint which the authority used for for document storage using the lists function within that we had the incident logging system as we called it where
02:50:58 where we could not just enter information but you could also record which department or sub-department you could record whether the item was open or closed which meant if you wished to you could do a certain amount of interrogation
02:51:10 do a certain amount of interrogation at certain points either by function or by looking to see what was left to be done
02:51:15 done so that's what we were using in rbkc what was used in the
02:51:22 the created exercise back didn't do very much
02:51:26 much across london at that time i think some local authorities were still using paper-based logs some people were using excel spreadsheets logs created within that
02:51:37 spreadsheets logs created within that there was no standardized electronic logging system across london right i see let's go then to your second statement in the rec and the recommendations that came from this exercise
02:51:49 exercise if we go please in your second statement to page 45 paragraph 28.1 [Music]
02:51:56 [Music] you say
02:51:58 you say i page 44 i think i should be 28.1
02:52:04 um you say the recommendations from exercise unified response were for a pan-london project to be set up subsequently agreed by the local authorities panel of the london resilience forum the purpose of the
02:52:15 resilience forum the purpose of the project was to take forward a review of london's local authority beck systems to research good practice in the management of the tactical plan for the local authority in responding to an emergency to consider the information management
02:52:26 to consider the information management and sharing systems and to review the training required to implement a new pan-london standardized beck what was the progress of those recommendations
02:52:37 recommendations at the time of the grenfell tower fire which was more than a year later so
02:52:43 so that
02:52:44 that project group was joe cousins at lambeth and myself we
02:52:50 we in the months following the exercise we visited a number of london local authorities we visited all three emergency services we visited the military london district military
02:53:03 military london district military we talked to one of the utilities certainly we were looking and doing research about various ways that others did their coordination of information in
02:53:14 did their coordination of information in a manager in a in a control center and how they recorded that and also how they dealt with the the this emerging tactical silver aspect of that wide variety of things
02:53:25 variety of things i think by the time of the fire we had done
02:53:30 done we'd certainly done a report back and i think within that we had started to to sketch out some principles that we thought should be in a future beck system
02:53:41 system um but at this point this was still putting out the concepts out there this this wasn't a finished document by any chance of choice and there was still work to be done and that simply reflected you know and
02:53:53 and that simply reflected you know and the other work streams from exercise unified response were taken about the same time um survivor reception centers emergency rest centers and things like that and that reflected that we were doing this in addition to the day job as
02:54:04 doing this in addition to the day job as it were
02:54:05 it were now considering the various training sessions
02:54:08 sessions uh
02:54:09 uh uh and exercises that we've discussed together other than exercise unified response which span four days the remaining exercises is this right we're table top exercises i believe so yes and
02:54:20 table top exercises i believe so yes and in in your view was that sufficient in order to ensure that our bkc staff were adequately trained and equipped to respond to a major emergency incident such as the grenfell tower fire
02:54:35 certainly we could have done better i should have done better looking at it
02:54:41 can we go to rbk3035364
02:54:48 now the first page of this document is as it says rebecca blackburn's statement uh to the inquiry um it's her first statement she was one of your contingency planning team as you've
02:55:00 your contingency planning team as you've told us and if we go please to page three paragraph 12
02:55:07 at the top of the screen it says most boroughs undertake regular testing of emergency plans this helps iron out any difficulties and ensures that everyone knows what to do however in my
02:55:18 everyone knows what to do however in my view the borough's plans had not been properly tested we did not undertake sufficient large-scale emergency simulations instead the cpu held the odd mini exercise
02:55:30 held the odd mini exercise first of all cpu that's the contingency planning unit isn't it yes um
02:55:35 um my wider question is do you agree with what rebecca blackburn says there in this in the second third and fourth lines
02:55:45 lines of that paragraph i'm not going to disagree overall
02:55:52 so that's a yes you agree yes yes thank you um mr chairman uh it's four minutes to one i'm i'm going to start on a different um topic um i can start on it and probably cover
02:56:04 um i can start on it and probably cover a few quick questions before we get to lunch but i'm into your hands well is is it going to be a substantial topic yeah it is as a topic it's a substantial topic we better start it
02:56:15 substantial topic we better start it after lunch we are we're making good progress i think so yes well uh mr kerry it's time we had a break for lunch we're not don't usually break four minutes early but today i think we've got a reason to do so so we'll stop there
02:56:27 reason to do so so we'll stop there we'll resume please at two o'clock and again please don't talk to anyone about your evidence or anything relating to it when they're out of the room thank you all right thank you very much would you care to give the usher please
02:56:50 thank you very much just a minute two o'clock thank you mr
02:57:14 you